{"id":46807,"date":"2015-11-18T20:46:07","date_gmt":"2015-11-18T17:46:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46807"},"modified":"2015-11-18T20:46:07","modified_gmt":"2015-11-18T17:46:07","slug":"lisanssiz-elektrik-basvurulari-3-gwi-asti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/lisanssiz-elektrik-basvurulari-3-gwi-asti\/","title":{"rendered":"(Turkish) Lisanss\u0131z Elektrik Ba\u015fvurular\u0131 3 GW\u2019\u0131 A\u015ft\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46807\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye Elektrik Da\u011f\u0131t\u0131m A.\u015e. (TEDA\u015e) lisanss\u0131z elektrik yat\u0131r\u0131mlar\u0131 ba\u015fvurular\u0131na dair g\u00fcncel listeyi yay\u0131nlad\u0131.<\/strong><\/p>\n<p>TEDA\u015e taraf\u0131ndan a\u00e7\u0131klanan verilere g\u00f6re elektrik da\u011f\u0131t\u0131m \u015firketlerine \u015fimdiye kadar toplamda 3.283,7 MW g\u00fcc\u00fcnde olmas\u0131 planlanan 3.850 MW\u2019l\u0131k lisanss\u0131z elektrik projesi i\u00e7in ba\u015fvuru yap\u0131ld\u0131. G\u00fcne\u015f elektri\u011fi 3.566 ba\u015fvuru ile en<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/lisanssiz-elektrik-basvurulari-3-gwi-asti.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-46808\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/lisanssiz-elektrik-basvurulari-3-gwi-asti-300x163.jpg\" alt=\"lisanssiz-elektrik-basvurulari-3-gwi-asti\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/lisanssiz-elektrik-basvurulari-3-gwi-asti-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/lisanssiz-elektrik-basvurulari-3-gwi-asti-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/lisanssiz-elektrik-basvurulari-3-gwi-asti.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> fazla ra\u011fbet edilen lisanss\u0131z yat\u0131r\u0131m alan\u0131 olurken, ikinci s\u0131radaki r\u00fczg\u00e2r enerjisi i\u00e7in ise 207 ba\u015fvuruda bulunuldu.<\/p>\n<p>Yap\u0131lan bu ba\u015fvurulardan 2.026 adedi kabul edilirken, 354 ba\u015fvuru i\u00e7in eksikler bildirildi, 682 ba\u015fvuru ise reddedildi. 778 ba\u015fvuru ise hen\u00fcz inceleme a\u015famas\u0131nda bulunuyor.<\/p>\n<p>Toplam g\u00fc\u00e7leri 249,117 MW olan 329 lisanss\u0131z elektrik projesinin kabul i\u015flemleri tamamlan\u0131rken, kabul a\u015famas\u0131nda ise toplam g\u00fc\u00e7leri\u00a0 56,6 MW olacak 58 proje bulunuyor.<\/p>\n<p>\u015eimdiye kadar toplam g\u00fc\u00e7leri 202,8 MW olan 395 g\u00fcne\u015f enerjisi projesinin kabul\u00fc tamamlan\u0131rken, toplam g\u00fc\u00e7leri 31,8 MW olan 40 g\u00fcne\u015f enerjisi projesi de kabul a\u015famas\u0131nda bulunuyor.<\/p>\n<p>R\u00fczg\u00e2r enerjisinde ise \u015fimdiye kadar toplam g\u00fc\u00e7leri 0,6 MW olan 3 projenin kabul i\u015flemi tamamland\u0131 ve 4 MW g\u00fcc\u00fcndeki 10 proje kabul a\u015famas\u0131nda bulunuyor.<\/p>\n<p>Kaynak: Ye\u015fil Ekonomi<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye Elektrik Da\u011f\u0131t\u0131m A.\u015e. (TEDA\u015e) lisanss\u0131z elektrik yat\u0131r\u0131mlar\u0131 ba\u015fvurular\u0131na dair g\u00fcncel listeyi yay\u0131nlad\u0131. TEDA\u015e taraf\u0131ndan a\u00e7\u0131klanan verilere g\u00f6re elektrik da\u011f\u0131t\u0131m \u015firketlerine \u015fimdiye kadar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46808,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[19,63,67,1009,2698,165,2326,227,1169,13,3518,26947,474,69,16,1216,2730,105],"views":1164,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46807"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46807"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46807\/revisions"}],"predecessor-version":[{"id":46809,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46807\/revisions\/46809"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46808"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46807"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46807"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46807"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}