{"id":46738,"date":"2015-11-17T13:48:35","date_gmt":"2015-11-17T10:48:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46738"},"modified":"2015-11-17T13:49:10","modified_gmt":"2015-11-17T10:49:10","slug":"kadincik-1-ve-2-hes-ozellestirme-ihalesini-ic-ictas-kazandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kadincik-1-ve-2-hes-ozellestirme-ihalesini-ic-ictas-kazandi\/","title":{"rendered":"(Turkish) Kad\u0131nc\u0131k 1 ve 2 HES \u00d6zelle\u015ftirme \u0130halesini IC \u0130\u00e7ta\u015f Kazand\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46738\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Mersin\u2019de bulunan Kad\u0131nc\u0131k 1 ve 2 Hidroelektrik Santrallerinin \u00f6zelle\u015ftirme ihalesini IC \u0130\u00e7ta\u015f kazand\u0131.<\/strong><span id=\"more-74177\"><\/span><\/p>\n<p>\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131\u2019nda d\u00fczenlenen ihaleye, GAMA Enerji A.\u015e., Turcas Petrol A.\u015e., Bereket Enerji \u00dcretim A.\u015e., Yap\u0131san Elektrik \u00dcretim A.\u015e., \u00d6zdo\u011fan Global Enerji \u00dcretim A.\u015e., Re\u015fadiye Hamzal\u0131 Elektrik \u00dcretim Sanay<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/kadincik-1-ve-2-hes-ozellestirme-ihalesini-ic-ictas-kazandi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-46739\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/kadincik-1-ve-2-hes-ozellestirme-ihalesini-ic-ictas-kazandi-300x165.jpg\" alt=\"kadincik-1-ve-2-hes-ozellestirme-ihalesini-ic-ictas-kazandi\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/kadincik-1-ve-2-hes-ozellestirme-ihalesini-ic-ictas-kazandi-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/kadincik-1-ve-2-hes-ozellestirme-ihalesini-ic-ictas-kazandi-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/kadincik-1-ve-2-hes-ozellestirme-ihalesini-ic-ictas-kazandi-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/kadincik-1-ve-2-hes-ozellestirme-ihalesini-ic-ictas-kazandi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>i ve Ticaret A.\u015e., Limak Yat\u0131r\u0131m Enerji \u00dcretim \u0130\u015fletme Hizmetleri ve \u0130n\u015faat A.\u015e., Mutlucan Tuz Madencilik \u0130n\u015faat Turizm Otomotiv Petrol Nakliye Sanayi A.\u015e.- \u015eenol Mutlu Ortak Giri\u015fim Grubu, Ic \u0130\u00e7ta\u015f Hidroelektrik ve Termik Enerji \u00dcretim ve Ticaret A.\u015e. ve Torunlar Enerji Sanayi ve Ticaret A.\u015e. kat\u0131ld\u0131. \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkan\u0131 Ahmeit Aksu Ba\u015fkanl\u0131\u011f\u0131nda ba\u015flayan ihalede, Aksu \u00f6demelerin TL \u00fczerinden pe\u015fin olarak \u00f6denece\u011fini s\u00f6yledi. Elemesiz turda elde edilen en y\u00fcksek teklif 777 milyon TL olarak ger\u00e7ekle\u015fti.<\/p>\n<p>Birinci elemeli turda elde edilen en y\u00fcksek teklif 812 milyon TL, elenen firma Torunlar Enerji Sanayi ve Ticaret A.\u015e., ikinci turda en y\u00fcksek teklif 831 milyon TL ve elenen firma Turcas Petrol A.\u015e., \u00fc\u00e7\u00fcnc\u00fc tur en y\u00fcksek teklif 841 milyon TL ve elenen firma GAMA Enerji A.\u015e. d\u00f6rd\u00fcnc\u00fc turda en y\u00fcksek teklif 857 milyon TL oldu. Bu turda iki firma en d\u00fc\u015f\u00fck rakam\u0131 verdi\u011fi gerek\u00e7esiyle eleme yap\u0131lmad\u0131. Daha sonra yap\u0131lan fiyat art\u0131r\u0131m\u0131nda en d\u00fc\u015f\u00fck teklifi Re\u015fadiye Hamzal\u0131 Elektrik \u00dcretim Sanayi ve Ticaret A.\u015e. elendi. A\u00e7\u0131k artt\u0131rmaya alt\u0131 firma kat\u0131ld\u0131. Ba\u015fkan Aksu, taban fiyat 858 milyon 500 bin TL olarak belirlendi. Art\u0131r\u0131m anal\u0131\u011f\u0131 100 bin TL olarak a\u00e7\u0131kland\u0131. Bereket Enerji \u00dcretim A.\u015e., \u00d6zdo\u011fan Global Enerji \u00dcretim A.\u015e., Limak Yat\u0131r\u0131m Enerji \u00dcretim \u0130\u015fletme Hizmetleri ve \u0130n\u015faat A.\u015e. firmalar\u0131 a\u00e7\u0131k artt\u0131rman\u0131n ilk turunda ihaleden \u00e7ekildiler. A\u00e7\u0131k artt\u0131rman\u0131n alt\u0131nc\u0131 turunda Yap\u0131san Elektrik \u00dcretim A.\u015e. Firmas\u0131 ihaleden \u00e7ekildi. 20. turda ise Ic \u0130\u00e7ta\u015f Hidroelektrik ve Termik Enerji \u00dcretim ve Ticaret A.\u015e. f\u015firketi 864 milyon 100 bin TL teklif vererek ihaleyi kazand\u0131.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Mersin\u2019de bulunan Kad\u0131nc\u0131k 1 ve 2 Hidroelektrik Santrallerinin \u00f6zelle\u015ftirme ihalesini IC \u0130\u00e7ta\u015f kazand\u0131. \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131\u2019nda d\u00fczenlenen ihaleye, GAMA Enerji A.\u015e., Turcas Petrol [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46739,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[63,67,1009,2698,165,35370,1090,4724,16798,26922,1248,2998,2954],"views":1935,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46738"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46738"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46738\/revisions"}],"predecessor-version":[{"id":46740,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46738\/revisions\/46740"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46739"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}