{"id":46635,"date":"2015-11-15T22:25:45","date_gmt":"2015-11-15T19:25:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46635"},"modified":"2015-11-15T22:26:03","modified_gmt":"2015-11-15T19:26:03","slug":"galata-windden-bursaya-60-mwlik-ruzgar-enerjisi-santrali-res","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/galata-windden-bursaya-60-mwlik-ruzgar-enerjisi-santrali-res\/","title":{"rendered":"(Turkish) Galata Wind&#8217;den Bursa&#8217;ya 60 MW`l\u0131k R\u00fczgar Enerjisi Santrali ( RES )&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46635\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Galata Wind Enerji, Bursa`da 60 MW`l\u0131k Ta\u015fp\u0131nar R\u00fczgar Enerji Santrali kurmay\u0131 planl\u0131yor.<\/strong><\/p>\n<p>Galata Wind Enerji A<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/galata-windden-bursaya-60-mwlik-ruzgar-enerjisi-santrali-res.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-46636\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/galata-windden-bursaya-60-mwlik-ruzgar-enerjisi-santrali-res-300x225.jpg\" alt=\"galata-windden-bursaya-60-mwlik-ruzgar-enerjisi-santrali-res\" width=\"276\" height=\"207\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/galata-windden-bursaya-60-mwlik-ruzgar-enerjisi-santrali-res-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/galata-windden-bursaya-60-mwlik-ruzgar-enerjisi-santrali-res-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/galata-windden-bursaya-60-mwlik-ruzgar-enerjisi-santrali-res-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/galata-windden-bursaya-60-mwlik-ruzgar-enerjisi-santrali-res.jpg 900w\" sizes=\"(max-width: 276px) 100vw, 276px\" \/><\/a>.\u015e. taraf\u0131ndan Bursa \u0130li, Mustafakemalpa\u015fa \u0130l\u00e7esi, Ta\u015fp\u0131nar mevkiinde, 60 MW kurulu g\u00fcc\u00fcnde \u201cTa\u015fp\u0131nar RES\u201d projesinin kurulmas\u0131 ve i\u015fletilmesi planlan\u0131yor.<\/p>\n<p>Adedi 1,5 MW kurulu g\u00fcc\u00fcnde 40 adet Vestas t\u00fcrbin kurulmas\u0131 planlanan projenin bedeli 200 milyon TL olarak belirlendi. Santralin toplamda 210.000.000 kWh elektrik \u00fcretmesi planlan\u0131yor.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, proje ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler Bursa Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019na g\u00f6nderilebilecek.<br \/>\n<!-- \u0130\u00e7erik 300 x 250 Haber Detay --><\/p>\n<p>Kaynak: B\u00fcltenler<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Galata Wind Enerji, Bursa`da 60 MW`l\u0131k Ta\u015fp\u0131nar R\u00fczgar Enerji Santrali kurmay\u0131 planl\u0131yor. Galata Wind Enerji A.\u015e. taraf\u0131ndan Bursa \u0130li, Mustafakemalpa\u015fa \u0130l\u00e7esi, Ta\u015fp\u0131nar mevkiinde, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46636,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[958,5927,63,67,1009,2698,165,26880,474,69,16,231,23318,26879,26881],"views":1462,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46635"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46635"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46635\/revisions"}],"predecessor-version":[{"id":46637,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46635\/revisions\/46637"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46636"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}