{"id":46622,"date":"2015-11-14T16:07:18","date_gmt":"2015-11-14T13:07:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46622"},"modified":"2015-11-14T16:07:18","modified_gmt":"2015-11-14T13:07:18","slug":"rusyadan-turk-akimi-aciklamasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rusyadan-turk-akimi-aciklamasi\/","title":{"rendered":"(Turkish) Rusya\u2019dan \u2018T\u00fcrk Ak\u0131m\u0131\u2019 A\u00e7\u0131klamas\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46622\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #363636;\"><strong>Rusya Devlet Ba\u015fkan\u0131 Vladimir Putin, \u2018T\u00fcrk Ak\u0131m\u2019 do\u011falgaz boru hatt\u0131 projesinin ivme kaybetmedi\u011fini, projenin Rusya ve T\u00fcrkiye\u2019nin \u00e7\u0131karlar\u0131n\u0131 kar\u015f\u0131lad\u0131\u011f\u0131n\u0131 belirtirken, dikkatli de\u011ferlendirme ihtiyac\u0131 oldu\u011funu vurgulad\u0131.<\/strong><\/p>\n<p style=\"color: #363636;\">Interfax\u2019a konu\u015fan P<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/rusyadan-turk-akimi-aciklamasi.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-46623\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/rusyadan-turk-akimi-aciklamasi.jpg\" alt=\"rusyadan-turk-akimi-aciklamasi\" width=\"300\" height=\"216\" \/><\/a>utin, \u201cT\u00fcrk Ak\u0131m\u2019n\u0131n ivme kaybetti\u011fi g\u00f6r\u00fc\u015f\u00fcne kat\u0131lm\u0131yorum. Bu kadar b\u00fcy\u00fck \u00f6l\u00e7ekte bir proje hemen \u00fczerinde anla\u015fma sa\u011flanamaz ve geli\u015ftirilemez. T\u00fcrk muhataplar\u0131m\u0131z ile birlikte \u00e7\u00f6zmemiz gereken \u00e7ok fazla yasal, teknik, ekonomik, organizasyonel konu var\u201d dedi.<\/p>\n<p style=\"color: #363636;\">Putin ayr\u0131ca \u201cRusya, Suriye\u2019deki hava operasyonlar\u0131n\u0131 suriye ordusu ihtiya\u00e7 duydu\u011fu s\u00fcrece devam ettirecek\u201d \u015feklinde konu\u015farak \u00fclkesinin Suriye politikas\u0131n\u0131n alt\u0131n\u0131 \u00e7izdi.<\/p>\n<p style=\"color: #363636;\">\u00d6te yandan Kremlin y\u00f6netimi Rusya Devlet Ba\u015fkan\u0131 Putin\u2019in Antalya\u2019daki G20 zirvesi s\u0131ras\u0131nda Cumhurba\u015fkan\u0131 Edo\u011fan ve \u00c7in Devlet Ba\u015fkan\u0131 \u015ei Cinping ile g\u00f6r\u00fc\u015fece\u011fini duyurdu.<\/p>\n<p style=\"color: #363636;\">Kaynak: D\u00fcnya<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet Ba\u015fkan\u0131 Vladimir Putin, \u2018T\u00fcrk Ak\u0131m\u2019 do\u011falgaz boru hatt\u0131 projesinin ivme kaybetmedi\u011fini, projenin Rusya ve T\u00fcrkiye\u2019nin \u00e7\u0131karlar\u0131n\u0131 kar\u015f\u0131lad\u0131\u011f\u0131n\u0131 belirtirken, dikkatli de\u011ferlendirme [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46623,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[5145,92,876,226,19761,2092,2677,63,67,1009,2698,165,24782,1190,6619,885,20076,6622],"views":1119,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46622"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46622"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46622\/revisions"}],"predecessor-version":[{"id":46624,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46622\/revisions\/46624"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46623"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}