{"id":46570,"date":"2015-11-13T14:52:59","date_gmt":"2015-11-13T11:52:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46570"},"modified":"2015-11-13T14:52:59","modified_gmt":"2015-11-13T11:52:59","slug":"botas-iki-milyar-dolarlik-finansman-icin-gorusuyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/botas-iki-milyar-dolarlik-finansman-icin-gorusuyor\/","title":{"rendered":"(Turkish) Bota\u015f \u0130ki Milyar Dolarl\u0131k Finansman \u0130\u00e7in G\u00f6r\u00fc\u015f\u00fcyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46570\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bota\u015f, 2 milyar dolar kredi almak i\u00e7in Avrupa Yat\u0131r\u0131m Bankas\u0131 (AYB) ve D\u00fcnya Bankas\u0131 ile g\u00f6r\u00fc\u015fmelerini s\u00fcrd\u00fcr\u00fcyor.<\/strong><\/p>\n<p><span id=\"more-74144\"><\/span> Konuya yak\u0131n kayn<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/botas-iki-milyar-dolarlik-finansman-icin-gorusuyor.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-46571\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/botas-iki-milyar-dolarlik-finansman-icin-gorusuyor-300x165.jpg\" alt=\"botas-iki-milyar-dolarlik-finansman-icin-gorusuyor\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/botas-iki-milyar-dolarlik-finansman-icin-gorusuyor-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/botas-iki-milyar-dolarlik-finansman-icin-gorusuyor-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/botas-iki-milyar-dolarlik-finansman-icin-gorusuyor-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/botas-iki-milyar-dolarlik-finansman-icin-gorusuyor.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>aklara g\u00f6re L\u00fcksemburg\u2019da, Avrupa Birli\u011fi\u2019nin bor\u00e7 verme mekanizmas\u0131 AYB yakla\u015f\u0131k 1 milyar euroluk (1.07 milyar dolar) kredi anla\u015fmas\u0131 imzalayabilir ve Washington merkezli D\u00fcnya Bankas\u0131 da 1 milyar dolar kredi sa\u011flayabilir.<\/p>\n<p>Bota\u015f, finansmandan elde edece\u011fi kayna\u011f\u0131 Tanap boru hatt\u0131 projesinin kendi pay\u0131na d\u00fc\u015fen 1,850 km\u2019lik b\u00f6l\u00fcm\u00fcn\u00fc in\u015fa etmek i\u00e7in kullanacak. 2018 y\u0131l\u0131 ortalar\u0131nda, in\u015fa edilen hattan T\u00fcrkiye\u2019ye 6 milyar metre k\u00fcp gaz pompalanmas\u0131 planlan\u0131yor. Tanap projesi, 2020 y\u0131l\u0131ndan itibaren Avrupa\u2019ya y\u0131ll\u0131k 10 milyar metre k\u00fcp gaz deste\u011fi sa\u011flayacak.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bota\u015f, 2 milyar dolar kredi almak i\u00e7in Avrupa Yat\u0131r\u0131m Bankas\u0131 (AYB) ve D\u00fcnya Bankas\u0131 ile g\u00f6r\u00fc\u015fmelerini s\u00fcrd\u00fcr\u00fcyor. Konuya yak\u0131n kaynaklara g\u00f6re L\u00fcksemburg\u2019da, Avrupa [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46571,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[7350,531,26856,92,226,19761,2092,2677,6966,63,67,1009,2698,165,7782,26857,26858],"views":827,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46570"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46570"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46570\/revisions"}],"predecessor-version":[{"id":46572,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46570\/revisions\/46572"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46571"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46570"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46570"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46570"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}