{"id":46553,"date":"2015-11-12T14:20:57","date_gmt":"2015-11-12T11:20:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46553"},"modified":"2015-11-12T14:20:57","modified_gmt":"2015-11-12T11:20:57","slug":"karadeniz-holding-yeni-enerji-gemileri-insa-etmeye-devam-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/karadeniz-holding-yeni-enerji-gemileri-insa-etmeye-devam-ediyor\/","title":{"rendered":"(Turkish) Karadeniz Holding, Yeni Enerji Gemileri \u0130n\u015fa Etmeye Devam Ediyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46553\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>D\u00fcnyan\u0131n en b\u00fcy\u00fck enerji gemi filosuna sahip (Powership) Karadeniz Holding, yeni enerji gemileri in\u015fa etmek amac\u0131yla ikinci el capesize gemi almaya devam ediyor.<\/strong><span id=\"more-74141\"><\/span><\/p>\n<p>Filosunda 1500MW kurulu g\u00fcc\u00fc olan 9 powership gemisi bulunan ve in\u015fa halinde 6 enerji gemisini 2<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/karadeniz-holding-yeni-enerji-gemileri-insa-etmeye-devam-ediyor.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-46554\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/karadeniz-holding-yeni-enerji-gemileri-insa-etmeye-devam-ediyor-300x165.jpg\" alt=\"karadeniz-holding-yeni-enerji-gemileri-insa-etmeye-devam-ediyor\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/karadeniz-holding-yeni-enerji-gemileri-insa-etmeye-devam-ediyor-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/karadeniz-holding-yeni-enerji-gemileri-insa-etmeye-devam-ediyor-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/karadeniz-holding-yeni-enerji-gemileri-insa-etmeye-devam-ediyor-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/karadeniz-holding-yeni-enerji-gemileri-insa-etmeye-devam-ediyor.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>017 y\u0131l\u0131na kadar 5000MV kurulu g\u00fcce sahip filoya ula\u015ft\u0131rmay\u0131 hedefleyen Karadeniz Holding, yeni powership gemiler in\u015fa etmek amac\u0131yla ikinci el capesize gemi almaya devam ediyor.<\/p>\n<p>Ald\u0131\u011f\u0131 ikinci el capesize d\u00f6kme y\u00fck gemileri, tersanelerde enerji gemisini d\u00f6n\u00fc\u015ft\u00fcren Karadeniz Holding, ge\u00e7en hafta Japon Nisshin Shipping\u2019in m\u00fclkiyetinde bulunan, 2001 y\u0131l\u0131nda Japonya\u2019da in\u015fa edilen 289 metre boyunda, 45 metre geni\u015fli\u011finde ve 172 bin 517 DWT ta\u015f\u0131ma kapasitesine sahip M\/V NISSHIN TRADER isimli d\u00f6kme y\u00fck gemisini 9 milyon 300 bin dolara sat\u0131n alarak filosuna katt\u0131.<\/p>\n<p>Ge\u00e7en ay Enerji ve Tabii Kaynaklar Bakan\u0131 Ali R\u0131za Alaboyun\u2019un da kat\u0131ld\u0131\u011f\u0131 t\u00f6renle, Sedef Tersanesi\u2019nde powership\u2019e d\u00f6n\u00fc\u015ft\u00fcr\u00fclen AYSEGUL SULTAN ve ZEYNEP SULTAN isimli y\u00fczen enerji gemileri, Gana ve Endonezya\u2019da \u00e7al\u0131\u015ft\u0131r\u0131lmak amac\u0131yla hizmete al\u0131nm\u0131\u015ft\u0131.<\/p>\n<p><strong>H\u0130ZMET VEREN POWERSHIP\u2019LER<\/strong><\/p>\n<p>Karadeniz Powership Kaya Bey \u2013 216.4 MW, Irak<br \/>\nKaradeniz Powership Fatmag\u00fcl Sultan \u2013 203.1 MW, L\u00fcbnan<br \/>\nKaradeniz Powership Rauf Bey \u2013 179.1 MW, Irak<br \/>\nKaradeniz Powership Orhan Bey \u2013 203.1 MW, L\u00fcbnan<br \/>\nKaradeniz Powership Do\u011fan Bey \u2013 126.4 MW, Irak<br \/>\nKaradeniz Powership \u0130rem Sultan \u2013 111.6 MW, Irak<br \/>\nKaradeniz Powership Ali Can Bey \u2013 104.3 MW<br \/>\nKaradeniz Powership Zeynep Sultan \u2013 125.35 MW, Endonezya<br \/>\nKaradeniz Powership Ay\u015feg\u00fcl Sultan \u2013 235.27 MW, Gana<\/p>\n<p><strong>\u0130N\u015eA HAL\u0130NDE OLAN POWERSHIP\u2019LER<\/strong><\/p>\n<p>Karadeniz Powership Osman Khan, 486 MW<br \/>\nKaradeniz Powership G\u00f6khan Bey, 125.35 MW<br \/>\nKaradeniz Powership Yasin Bey, 125.35 MW<br \/>\nKaradeniz Powership, 467.66 MW<br \/>\nKaradeniz Powership, 486 MW<br \/>\nKaradeniz Powership, 125.35 MW<\/p>\n<p><strong>M\/V NISSHIN TRADER\u2019\u0130N \u00d6ZELL\u0130KLER\u0130<\/strong><\/p>\n<p>Name:\u00a0\u00a0 \u00a0Nisshin Trader<br \/>\nIMO:\u00a0\u00a0 \u00a09248514<br \/>\nFlag:\u00a0\u00a0 \u00a0Philippines<br \/>\nMMSI:\u00a0\u00a0 \u00a0548616000<br \/>\nCallsign:\u00a0\u00a0 \u00a0DYFV<br \/>\nFormer name(s):<br \/>\n\u2013 Lowlands Trader (Until 2005 Dec)<br \/>\nVessel type:\u00a0\u00a0 \u00a0Bulk Carrier<br \/>\nGross tonnage:\u00a0\u00a0 \u00a087,390 tons<br \/>\nSummer DWT:\u00a0\u00a0 \u00a0172,517 tons<br \/>\nLength:\u00a0\u00a0 \u00a0289 m<br \/>\nBeam:\u00a0\u00a0 \u00a045 m<br \/>\nDraught:\u00a0\u00a0 \u00a017.8 m<br \/>\nHome port:\u00a0\u00a0 \u00a0Manila<br \/>\nClass society:\u00a0\u00a0 \u00a0Bureau Veritas<br \/>\nBuild year:\u00a0\u00a0 \u00a02001<br \/>\nBuilder (*):\u00a0\u00a0 \u00a0Jmu Tsu Shipyard \u2013 Tsu, Japan<br \/>\nOwner: NISSHIN SHIPPING CO LTD \u2013 Tokyo -Japan<\/p>\n<p>Kaynak: Deniz Haber<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.D\u00fcnyan\u0131n en b\u00fcy\u00fck enerji gemi filosuna sahip (Powership) Karadeniz Holding, yeni enerji gemileri in\u015fa etmek amac\u0131yla ikinci el capesize gemi almaya devam ediyor. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46554,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[63,26847,67,1009,2698,165,26844,3624,26848,26845,26846],"views":2253,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46553"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46553"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46553\/revisions"}],"predecessor-version":[{"id":46555,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46553\/revisions\/46555"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46554"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46553"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46553"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}