{"id":46460,"date":"2015-11-10T22:29:37","date_gmt":"2015-11-10T19:29:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46460"},"modified":"2015-11-10T22:29:37","modified_gmt":"2015-11-10T19:29:37","slug":"metan-gazindan-uretilecek-enerji-ile-dicle-nehri-temizlenecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/metan-gazindan-uretilecek-enerji-ile-dicle-nehri-temizlenecek\/","title":{"rendered":"(Turkish) Metan Gaz\u0131ndan \u00dcretilecek Enerji \u0130le Dicle Nehri Temizlenecek&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46460\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Diyarbak\u0131r B\u00fcy\u00fck\u015fehir Belediyesi, s\u00f6zle\u015fme bedeli 23 milyon Euro olan \u0130leri Biyolojik Ar\u0131tma Tesisi\u2019nin y\u00fczde 97\u2019ini tamamlad\u0131.<\/strong><span id=\"more-74111\"><\/span><\/p>\n<p>Deneme testlerine ba\u015flanan proje ile Dicle Nehri \u00fczerindeki kirlilik y\u00fck\u00fcn\u00fc \u00f6nemli \u00f6l\u00e7\u00fcde azalt\u0131lmas\u0131 hed<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/metan-gazindan-uretilecek-enerji-ile-dicle-nehri-temizlenecek.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-46461\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/metan-gazindan-uretilecek-enerji-ile-dicle-nehri-temizlenecek-300x165.jpg\" alt=\"metan-gazindan-uretilecek-enerji-ile-dicle-nehri-temizlenecek\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/metan-gazindan-uretilecek-enerji-ile-dicle-nehri-temizlenecek-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/metan-gazindan-uretilecek-enerji-ile-dicle-nehri-temizlenecek-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/metan-gazindan-uretilecek-enerji-ile-dicle-nehri-temizlenecek-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/metan-gazindan-uretilecek-enerji-ile-dicle-nehri-temizlenecek.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>efleniyor. Tesisin enerji ihtiyac\u0131 da yine at\u0131ksu ar\u0131tma \u00e7amurlar\u0131ndan \u00e7\u0131kan metan gaz\u0131n\u0131n elektrik enerjisine d\u00f6n\u00fc\u015ft\u00fcr\u00fclmesiyle kar\u015f\u0131lanacak.<\/p>\n<p>Diyarbak\u0131r B\u00fcy\u00fck\u015fehir Belediyesi D\u0130SK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019n\u00fcn Dicle Nehri\u2019ni kirlilikten koruyacak ekolojik ve tarihsel \u00e7al\u0131\u015fma niteli\u011findeki \u0130leri Biyolojik At\u0131ksu Ar\u0131tma Tesisi Projesi\u2019nde ad\u0131m ad\u0131m sona geliniyor. Tesisin pek \u00e7ok \u00fcnitesinde deneme testleri ba\u015flarken, projenin hayata ge\u00e7mesiyle birlikte Dicle Nehri \u00fczerindeki kirlilik y\u00fck\u00fc \u00f6nemli \u00f6l\u00e7\u00fcde azalacak. Kent merkezinde 998 kilometreye tekab\u00fcl eden kanalizasyon hatt\u0131 arac\u0131l\u0131\u011f\u0131yla Ar\u0131tma Tesisi\u2019ne gelecek pis su, tesiste kurulan \u00fcnitelerde ar\u0131nd\u0131r\u0131ld\u0131ktan sonra Dicle Nehri\u2019ne b\u0131rak\u0131lacak, b\u00f6ylece Dicle Nehri daha temiz akacak.<\/p>\n<p>20 hektarl\u0131k alan \u00fczerine kurulan \u0130leri Biyolojik At\u0131ksu Ar\u0131tma Tesisi, AB Kat\u0131l\u0131m \u00d6ncesi Mali Yard\u0131m Arac\u0131\u2019n\u0131n (IPA) y\u00fczde 85 deste\u011fi, \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019n\u0131n y\u00fczde 6 katk\u0131s\u0131 ve D\u0130SK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019n\u00fcn y\u00fczde 9\u2019luk \u00f6z kayna\u011f\u0131 ile in\u015fa edildi. S\u00f6zle\u015fme bedeli 23 milyon Euro olan \u0130leri Biyolojik Ar\u0131tma Tesisi\u2019nin y\u00fczde 97\u2019sini tamamlayan, ger\u00e7ekle\u015fen k\u0131s\u0131m i\u00e7in 15.5 milyon Euro harcayan D\u0130SK\u0130, tesisi 1 milyon 245 bin ki\u015fiye g\u00f6re g\u00fcnl\u00fck 175 bin m3 at\u0131k suyu ar\u0131tabilecek \u015fekilde in\u015fa etti.<br \/>\nGiri\u015f Pompa \u0130stasyonu, Izgara Tesisleri, Kum ve Ya\u011f Tutucular, \u00d6n \u00c7\u00f6keltme Havuzlar\u0131, Anaerobik Kar\u0131\u015ft\u0131rma Tank\u0131, Aktif \u00c7amur Tanklar\u0131, Son \u00c7\u00f6keltme Havuzlar\u0131, \u00c7amur Yo\u011funla\u015ft\u0131r\u0131c\u0131lar, \u00c7amur Kar\u0131\u015ft\u0131rma Tanklar\u0131, Anaerobik \u00c7amur \u00c7\u00fcr\u00fct\u00fcc\u00fcler, Gaz Kullan\u0131m Tesisleri ve \u00c7amur Susuzla\u015ft\u0131rma gibi pek \u00e7ok \u00fcnitenin yer alaca\u011f\u0131 \u0130leri Biyolojik At\u0131ksu Ar\u0131tma Tesisi\u2019nde, deneme testleri de ba\u015flad\u0131. Deneme testleri, uzun havaland\u0131rmal\u0131 aktif \u00e7amur sistemi (Aerobik tanklar), anaerobik tanklar, 6 adet son \u00e7\u00f6keltim havuzu, yeni eklenen \u00e7amur \u00e7\u00fcr\u00fctme tanklar\u0131, \u00e7amursuzla\u015ft\u0131rma amac\u0131yla kullan\u0131lacak dekant\u00f6rlerde, mekanik ayr\u0131\u015ft\u0131r\u0131c\u0131larda, yeni yap\u0131lan \u00e7amur yo\u011funla\u015ft\u0131r\u0131c\u0131da, gaz depolama tanklar\u0131nda, des\u00fclf\u00fcrizasyon \u00fcnitesinde ve elektrik enerjisi \u00fcretecek jenerat\u00f6rlerde uyguland\u0131.<\/p>\n<p>Projenin tamamen hayata ge\u00e7mesiyle birlikte Diyarbak\u0131r\u2019dan Basra K\u00f6rfezi\u2019ne kadar olan 1900 kilometre kat eden Dicle Nehri, ilk kez \u0130leri Biyolojik At\u0131ksu Ar\u0131tma Tesisi\u2019ne kavu\u015fmu\u015f olacak. Tesis ile nehir \u00fczerindeki kirlilik y\u00fck\u00fc azalt\u0131lacak. Tesisin \u00e7al\u0131\u015fmas\u0131 i\u00e7in gerekli olan b\u00fct\u00fcn enerji ihtiyac\u0131 ise yine at\u0131ksu ar\u0131tma \u00e7amurlar\u0131ndan \u00e7\u0131kan metan gaz\u0131n\u0131n elektrik enerjisine d\u00f6n\u00fc\u015ft\u00fcr\u00fclmesiyle kar\u015f\u0131lanacak. Tesis, bu \u00f6zelli\u011fi ile ekolojik \u00e7al\u0131\u015fman\u0131n felsefesine uygun bir \u015fekilde do\u011fadan gelen enerjiyi \u00e7evreye herhangi bir zarar vermeden kendisi \u00fcretmi\u015f olacak.<\/p>\n<p>D\u0130SK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc yetkilileri, \u0130leri Biyolojik At\u0131ksu Ar\u0131tma Tesisi\u2019ni, Dicle Nehri k\u0131y\u0131s\u0131nda bulunan t\u00fcm kentler ve \u00fclkelerin koruyucu tedbirler almas\u0131 i\u00e7in b\u00fcy\u00fck bir f\u0131rsat olarak de\u011ferlendiriyor.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Diyarbak\u0131r B\u00fcy\u00fck\u015fehir Belediyesi, s\u00f6zle\u015fme bedeli 23 milyon Euro olan \u0130leri Biyolojik Ar\u0131tma Tesisi\u2019nin y\u00fczde 97\u2019ini tamamlad\u0131. Deneme testlerine ba\u015flanan proje ile Dicle Nehri [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46461,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[640,1678,17360,20945,21016,63,67,1009,2698,165,26805,4906],"views":1011,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46460"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46460"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46460\/revisions"}],"predecessor-version":[{"id":46462,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46460\/revisions\/46462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46461"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46460"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46460"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46460"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}