{"id":46270,"date":"2015-11-05T23:34:18","date_gmt":"2015-11-05T20:34:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46270"},"modified":"2015-11-05T23:34:34","modified_gmt":"2015-11-05T20:34:34","slug":"cinden-guneydoguya-60-mwlik-gunes-santrali-ges-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cinden-guneydoguya-60-mwlik-gunes-santrali-ges-yatirimi\/","title":{"rendered":"(Turkish) \u00c7in\u2019den G\u00fcneydo\u011fu\u2019ya 60 MW\u2019l\u0131k G\u00fcne\u015f Santrali (GES) Yat\u0131r\u0131m\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46270\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00c7in N\u00fckleer Enerji \u015eirketi (CGN) ile Else Enerji, \u015eanl\u0131urfa\u2019da 60 milyon dolara mal olmas\u0131 beklenen 60 megavatl\u0131k g\u00fcne\u015f enerjisi santrali kuracak.<\/strong><span id=\"more-74069\"><\/span><\/p>\n<p>CGN Uluslararas\u0131 \u0130\u015f Geli\u015ftirme Direkt\u00f6r\u00fc Xing Liu ile Else Enerji Genel M\u00fcd\u00fcr\u00fc Mustafa Herdem, T\u00fcrkiye\u2019nin g\u00fcneydo\u011fusunda g\u00fcne\u015f enerji santrali kurmak i\u00e7in imzalanan iyi niyet anla\u015fmas\u0131ndan sonra sorular\u0131 yan\u0131tlad\u0131.<\/p>\n<p>Yenilenebilir enerji yat\u0131r\u0131m<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/cinden-guneydoguya-60-mwlik-gunes-santrali-ges-yatirimi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-46271\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/cinden-guneydoguya-60-mwlik-gunes-santrali-ges-yatirimi-300x165.jpg\" alt=\"cinden-guneydoguya-60-mwlik-gunes-santrali-ges-yatirimi\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/cinden-guneydoguya-60-mwlik-gunes-santrali-ges-yatirimi-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/cinden-guneydoguya-60-mwlik-gunes-santrali-ges-yatirimi-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/cinden-guneydoguya-60-mwlik-gunes-santrali-ges-yatirimi-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/cinden-guneydoguya-60-mwlik-gunes-santrali-ges-yatirimi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>lar\u0131nda \u00c7in\u2019deki \u00f6nc\u00fc firmalar\u0131ndan biri olduklar\u0131n\u0131 belirten Liu, \u201cFirmam\u0131z n\u00fckleer enerjinin d\u0131\u015f\u0131nda ye\u015fil enerji kaynaklar\u0131na da y\u00f6neliyor. Yenilenebilir enerji kaynaklar\u0131 konusunda \u015firketimiz s\u00fcrekli yat\u0131r\u0131m halinde\u201d dedi.<\/p>\n<p>Liu, \u00c7in\u2019in ekonomik i\u015fbirli\u011fi hedefi do\u011frultusunda, T\u00fcrkiye\u2019nin de yer ald\u0131\u011f\u0131 bir yakla\u015f\u0131m izledi\u011fini belirterek, CGN\u2019in Else Enerji ile imzalanan anla\u015fma \u00e7er\u00e7evesinde, ortak \u00e7al\u0131\u015fma alanlar\u0131n\u0131n belirlenmesini hedeflediklerini s\u00f6yledi. Liu, g\u00fcne\u015f enerjisiyle ba\u015flayacak ortakl\u0131\u011f\u0131n di\u011fer enerji alanlar\u0131nda da devam etmesini beklediklerini dile getirdi.<\/p>\n<p>Herdem de Else Enerji\u2019nin T\u00fcrkiye\u2019deki g\u00fcne\u015f enerjisi pazar\u0131n\u0131n \u00fc\u00e7te bir pazar pay\u0131na sahip oldu\u011funu savunarak, \u201cCGN ile G\u00fcneydo\u011fu\u2019da 60 megavatl\u0131k g\u00fcne\u015f santrali kuraca\u011f\u0131z. Her biri bir megavatl\u0131k toplam 60 g\u00fcne\u015f enerji santrali, da\u011f\u0131t\u0131m \u015firketinden gerekli onaylar al\u0131nd\u0131\u011f\u0131 takdirde 2016\u2019n\u0131n ilk yar\u0131s\u0131nda devreye al\u0131nacak ve proje i\u00e7in yakla\u015f\u0131k 60 milyon dolarl\u0131k yat\u0131r\u0131m yap\u0131lacak\u201d dedi.<\/p>\n<p>G\u00fcneydo\u011fu Anadolu\u2019da ilk etapta \u015eanl\u0131urfa\u2019da santrallerin yap\u0131laca\u011f\u0131n\u0131 kaydeden Herdem, \u201cBu anla\u015fma bir ba\u015flang\u0131\u00e7 ve ortakl\u0131\u011f\u0131n ne kadar b\u00fcy\u00fcyece\u011fini zaman g\u00f6sterecek. Benzer \u00fc\u00e7 d\u00f6rt tane daha proje geli\u015ftirdi\u011fimiz iller var, onlar da neticelendi\u011finde bu s\u00f6zle\u015fmenin arkas\u0131na ekleyece\u011fiz\u201d diye konu\u015ftu.<\/p>\n<p>Herdem, d\u00fcnyan\u0131n en b\u00fcy\u00fck n\u00fckleer enerji firmas\u0131 CGN\u2019nin, T\u00fcrkiye\u2019ye g\u00fcne\u015f enerji santrali kurmak i\u00e7in gelmesinin \u00f6nemine dikkati \u00e7ekerek, \u201cBiz bunu \u00e7ok \u00f6nemsiyoruz. Bir n\u00fckleer firmas\u0131na T\u00fcrkiye\u2019de g\u00fcne\u015f santrali yapt\u0131rmay\u0131 manidar buluyoruz. \u015eirket de bunun \u00f6nemini fark etmi\u015f ki \u00c7in\u2019de g\u00fcne\u015f enerjisi alan\u0131nda 3. b\u00fcy\u00fck oyuncu konumuna gelmi\u015f\u201d ifadelerini kulland\u0131.<\/p>\n<p>Herdem, i\u015fbirli\u011finin sadece T\u00fcrkiye\u2019yi kapsamad\u0131\u011f\u0131n\u0131 vurgulayarak, hem T\u00fcrkiye\u2019de hem de 3. \u00fclkelerde daha b\u00fcy\u00fck hacimdeki projelere birlikte imza atarak b\u00fcy\u00fcmeyi hedeflediklerinin alt\u0131n\u0131 \u00e7izdi.<\/p>\n<p>Else\u2019nin T\u00fcrkiye d\u0131\u015f\u0131nda Ortado\u011fu pazar\u0131nda da rol almak istedi\u011fini s\u00f6yleyen Herdem, \u201c\u0130ran, Kazakistan ve \u00dcrd\u00fcn\u2019de \u00e7al\u0131\u015fmalar ve g\u00f6r\u00fc\u015fmeler yap\u0131yoruz. Bu \u00fclkelerde yapaca\u011f\u0131m\u0131z \u00e7al\u0131\u015fmalar\u0131 CGN ile birlikte kuracag\u0131m\u0131z ortak \u015firket \u00fczerinden yapaca\u011f\u0131z\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7in N\u00fckleer Enerji \u015eirketi (CGN) ile Else Enerji, \u015eanl\u0131urfa\u2019da 60 milyon dolara mal olmas\u0131 beklenen 60 megavatl\u0131k g\u00fcne\u015f enerjisi santrali kuracak. CGN Uluslararas\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46271,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[20846,26728,6653,63,67,1009,2698,165,2326,21886,227,13,2569,21768,23133,2401,26729,4269,13556,2097,26730,358,218],"views":1617,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46270"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46270"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46270\/revisions"}],"predecessor-version":[{"id":46273,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46270\/revisions\/46273"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46271"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}