{"id":46086,"date":"2015-11-01T22:51:48","date_gmt":"2015-11-01T19:51:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46086"},"modified":"2015-11-01T22:51:48","modified_gmt":"2015-11-01T19:51:48","slug":"en-buyuk-deniz-ustu-ruzgar-yatirimini-baslatiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/en-buyuk-deniz-ustu-ruzgar-yatirimini-baslatiyor\/","title":{"rendered":"(Turkish) En B\u00fcy\u00fck Deniz \u00dcst\u00fc R\u00fczgar Yat\u0131r\u0131m\u0131n\u0131 Ba\u015flat\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46086\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Dong Energy d\u00fcnyan\u0131n en b\u00fcy\u00fck deniz \u00fcst\u00fc r\u00fczgar enerjisi projesi olacak olan Walney 3 projesi i\u00e7in nihai yat\u0131r\u0131m karar\u0131n\u0131n verildi\u011fini a\u00e7\u0131klad\u0131.<\/strong><\/p>\n<p>Danimarkal\u0131 \u015firket taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada 660 MW g\u00fcc\u00fcnde olacak projenin iki faz olarak geli\u015ftirilece\u011fi ve 2018 y\u0131l\u0131nda tamamlanarak <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/en-buyuk-deniz-ustu-ruzgar-yatirimini-baslatiyor.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-46087\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/11\/en-buyuk-deniz-ustu-ruzgar-yatirimini-baslatiyor.jpg\" alt=\"en-buyuk-deniz-ustu-ruzgar-yatirimini-baslatiyor\" width=\"300\" height=\"238\" \/><\/a>devreye al\u0131nmas\u0131n\u0131n planland\u0131\u011f\u0131 bildirildi.<\/p>\n<p>Projenin ilk faz\u0131nda MHI Vestas taraf\u0131ndan \u00fcretilen 8 MW g\u00fcc\u00fcnde 40 adet V164-8.0 MW modelli r\u00fczgar t\u00fcrbini kullan\u0131lacak iken, ikinci fazda ise Siemens taraf\u0131ndan \u00fcretilen 7 MW g\u00fcc\u00fcndeki 47 adet SWT-7.0-154 t\u00fcrbinleri kullan\u0131lacak.<\/p>\n<p>\u0130rlanda denizi \u00fczerinde Cumbria kenti k\u0131y\u0131lar\u0131na 19 kilometre uzakl\u0131kta yer alacak projenin Birle\u015fik Krall\u0131k\u2019taki 460 binden fazla evin elektrik t\u00fcketimine denk \u00fcretim ger\u00e7ekle\u015ftirmesi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>DONG Energy santralde \u00fcretti\u011fi elektrik i\u00e7in megavat-saat ba\u015f\u0131na 15 y\u0131l boyunca 150 Poundluk al\u0131m garantisi sa\u011flam\u0131\u015f durumda. \u015eirket deniz \u00fcst\u00fc r\u00fczgar enerjisi alan\u0131ndaki seviyelendirilmi\u015f enerji maliyeti megavat saat ba\u015f\u0131na 100 Avro d\u00fczeyine d\u00fc\u015f\u00fcrmeyi hedefliyor.<\/p>\n<p>DONG Energy\u2019nin Walney 1 ve Walney 2 santralleri ile birlikte b\u00f6lgedeki deniz \u00fcst\u00fc r\u00fczgar enerjisi g\u00fcc\u00fc 1.027 MW\u2019a ula\u015fm\u0131\u015f olacak.<\/p>\n<p>Kaynak: Ye\u015fil Ekonomi<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Dong Energy d\u00fcnyan\u0131n en b\u00fcy\u00fck deniz \u00fcst\u00fc r\u00fczgar enerjisi projesi olacak olan Walney 3 projesi i\u00e7in nihai yat\u0131r\u0131m karar\u0131n\u0131n verildi\u011fini a\u00e7\u0131klad\u0131. Danimarkal\u0131 \u015firket [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46087,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[9630,10626,68,63,67,1009,2698,165,474,22653,69,16,231,22631,23318,22615,324,5484,4130,1854,1286],"views":933,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46086"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46086"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46086\/revisions"}],"predecessor-version":[{"id":46088,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46086\/revisions\/46088"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46087"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46086"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46086"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46086"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}