{"id":46057,"date":"2015-10-31T18:34:06","date_gmt":"2015-10-31T15:34:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46057"},"modified":"2015-10-31T18:34:06","modified_gmt":"2015-10-31T15:34:06","slug":"norvecli-statoil-7-milyar-dolarlik-enerji-projesini-erteledi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/norvecli-statoil-7-milyar-dolarlik-enerji-projesini-erteledi\/","title":{"rendered":"(Turkish) Norve\u00e7\u2019li Statoil 7 Milyar Dolarl\u0131k Enerji Projesini Erteledi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46057\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Norve\u00e7 \u015firketi Statoil\u2019in, \u0130ngiltere\u2019de Kuzey Denizi\u2019ndeki 7 milyar dolarl\u0131k enerji yat\u0131r\u0131m\u0131n\u0131n \u00fcretime ge\u00e7me tarihini 2018 y\u0131l\u0131n\u0131n ikinci yar\u0131s\u0131na erteledi\u011fi bildirildi.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/norvecli-statoil-7-milyar-dolarlik-enerji-projesini-erteledi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-46058\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/norvecli-statoil-7-milyar-dolarlik-enerji-projesini-erteledi-300x165.jpg\" alt=\"norvecli-statoil-7-milyar-dolarlik-enerji-projesini-erteledi\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/norvecli-statoil-7-milyar-dolarlik-enerji-projesini-erteledi-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/norvecli-statoil-7-milyar-dolarlik-enerji-projesini-erteledi-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/norvecli-statoil-7-milyar-dolarlik-enerji-projesini-erteledi-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/norvecli-statoil-7-milyar-dolarlik-enerji-projesini-erteledi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><span id=\"more-73995\"><\/span><\/p>\n<p>Statoil\u2019den yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamada, \u015firketin ortaklar\u0131 ile \u0130ngiltere\u2019nin Kuzey Denizi\u2019ndeki Mariner yata\u011f\u0131nda bulunan enerji yat\u0131r\u0131m\u0131n\u0131n, 2018 y\u0131l\u0131n\u0131n ikinci yars\u0131nda \u00fcretime ge\u00e7mesinin planland\u0131\u011f\u0131 belirtildi. Daha \u00f6nce, 7 milyar dolar de\u011ferinde yat\u0131r\u0131m yap\u0131larak, projenin 2017 y\u0131l\u0131nda tamamlanmas\u0131 ve \u00fcretime ge\u00e7ilmesi planlan\u0131yordu.<\/p>\n<p>\u015eirket, projenin \u00fcretime ge\u00e7me tarihinin ertelenmesine gerek\u00e7e olarak, yakla\u015f\u0131k y\u00fczde 10 seviyesinde artan \u00fcretim maliyetlerini g\u00f6sterdi.<\/p>\n<p>Statoil a\u00e7\u0131klamas\u0131nda, Kuzey Kutup Dairesi\u2019nde Norve\u00e7 k\u0131ta sahanl\u0131\u011f\u0131nda kalan \u201cAasta Hanteen\u201d projesinin \u00fcretime ge\u00e7me tarihinin de 2018\u2019e ertelendi\u011fi kaydedildi.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Norve\u00e7 \u015firketi Statoil\u2019in, \u0130ngiltere\u2019de Kuzey Denizi\u2019ndeki 7 milyar dolarl\u0131k enerji yat\u0131r\u0131m\u0131n\u0131n \u00fcretime ge\u00e7me tarihini 2018 y\u0131l\u0131n\u0131n ikinci yar\u0131s\u0131na erteledi\u011fi bildirildi. Statoil\u2019den yap\u0131lan yaz\u0131l\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46058,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[26647,63,67,1009,2698,26648,165,117,1092,7590,2113,26649,6331,5540],"views":555,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46057"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46057"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46057\/revisions"}],"predecessor-version":[{"id":46059,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46057\/revisions\/46059"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46058"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46057"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46057"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46057"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}