{"id":46048,"date":"2015-10-31T11:36:17","date_gmt":"2015-10-31T08:36:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=46048"},"modified":"2015-10-31T18:39:25","modified_gmt":"2015-10-31T15:39:25","slug":"enerjisa-toplam-900-mwlik-3-hidroelektrik-santralini-satacak-2","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerjisa-toplam-900-mwlik-3-hidroelektrik-santralini-satacak-2\/","title":{"rendered":"(Turkish) Enerjisa, Toplam 900 MW\u2019l\u0131k 3 Hidroelektrik Santralini Satacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/46048\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div class=\"td-post-content\" style=\"color: #0a0a0a;\">\n<div class=\"pf-content\">\n<p style=\"color: #0a0a0a;\"><strong>Sabanc\u0131 ve Alman E.ON\u2019un ortakl\u0131\u011f\u0131 olan Enerjisa, \u015firketin bor\u00e7 seviyesini d\u00fc\u015f\u00fcrmek amac\u0131yla yat\u0131r\u0131m s\u00fcre\u00e7leri devam eden ve toplam 900 MW kurulu g\u00fc\u00e7te planlanan 3 hidroelektrik santralinin (HES) sat\u0131\u015f\u0131n\u0131 hedefliyor.<\/strong><span id=\"more-73980\"><\/span><br \/>\nHalka arz\u0131n\u0131 en erken 2017 y\u0131l\u0131n\u0131n \u00fc\u00e7\u00fcnc\u00fc \u00e7eyre\u011fine \u00f6teleyen Enerjisa, Siirt ve Mu\u015f\u2019taki toplam kuru<img loading=\"lazy\" class=\"alignright  wp-image-46049\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/gokcekaya-enerjisa-HES-hidro-23333-218x150.jpg\" alt=\"DIGITAL CAMERA\" width=\"291\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/gokcekaya-enerjisa-HES-hidro-23333-218x150.jpg 218w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/gokcekaya-enerjisa-HES-hidro-23333-218x150-72x50.jpg 72w\" sizes=\"(max-width: 291px) 100vw, 291px\" \/>lu g\u00fc\u00e7leri 900 MW olarak planlanan 3 hidroelektrik santralinin (HES) sat\u0131\u015f\u0131 i\u00e7in d\u00fc\u011fmeye bast\u0131. Reuters\u2019in haberine g\u00f6re, Sabanc\u0131 Holding ve Alman E.ON\u2019un y\u00fczde 50-50 ortakl\u0131\u011f\u0131 olan Enerjisa\u2019n\u0131n, portf\u00f6y\u00fcn\u00fc konsolide etmek ve \u015firketin bor\u00e7 seviyesini d\u00fc\u015f\u00fcrmek amac\u0131yla yat\u0131r\u0131m s\u00fcre\u00e7leri devam eden 3 hidroelektrik santralinin sat\u0131\u015f\u0131n\u0131 hedefledi\u011fi bildirildi. Bilgi sahibi \u00fc\u00e7 kayna\u011f\u0131n verdi\u011fi bilgiye g\u00f6re, s\u00f6z konusu santraller 400 MW kurulu g\u00fcce sahip olmas\u0131 planlanan Siirt\u2019teki Botan \u00c7ay\u0131 \u00fczerindeki Pervari HES, Mu\u015f\u2019ta Murat nehri \u00fczerinde bulunan 280 MW\u2019l\u0131k Alpaslan II HES ve Siirt il s\u0131n\u0131rlar\u0131nda yer alan 168.4 MW\u2019l\u0131k \u0130ncir HES. Bir kaynak, \u201cEnerjisa\u2019n\u0131n 3 HES\u2019i i\u00e7in ba\u015flat\u0131lan s\u00fcre\u00e7 devam ediyor. Enerji sekt\u00f6r\u00fcnde hedefler istendi\u011fi gibi gitmiyor. Bu sat\u0131\u015f\u0131 \u015firketin bir portf\u00f6y optimizasyonu olarak g\u00f6rmek laz\u0131m\u201d dedi. Enerjisa ise yorum yapmad\u0131.<\/p>\n<p style=\"color: #0a0a0a;\">Sabanc\u0131 Holding Enerji Grup Ba\u015fkan\u0131 Mehmet G\u00f6\u00e7men, 22 Ekim\u2019de d\u00fczenledikleri bas\u0131n toplant\u0131s\u0131nda, enerji sekt\u00f6r\u00fcnde fiyatlar\u0131n d\u00fc\u015ft\u00fc\u011f\u00fcn\u00fc, arz fazlas\u0131 oldu\u011funu belirterek, \u201cT\u00fcrkiye elektrik sekt\u00f6r\u00fcnde yat\u0131r\u0131mlar\u0131n s\u00fcrd\u00fcr\u00fclebilir olmas\u0131 i\u00e7in, sekt\u00f6r\u00fcn finansal s\u00fcrd\u00fcr\u00fclebilirli\u011finin g\u00fcvence alt\u0131na al\u0131nmas\u0131; sekt\u00f6rde bulunan \u015firketlerin sermaye yap\u0131lar\u0131 ve bilan\u00e7olar\u0131n\u0131n iyile\u015ftirilmesi gerekiyor\u201d demi\u015fti. Enerjisa\u2019n\u0131n mevcut durumda 2.500 MW olan kurulu g\u00fcc\u00fc, devam eden yat\u0131r\u0131mlar\u0131n\u0131n Nisan 2016\u2019da devreye girmesi ile 3.500 MW\u2019a \u00e7\u0131kacak. Enerjisa, 2020 y\u0131l\u0131nda enerjide ula\u015fmak istedi\u011fi toplam kapasite hedefini 7.500 MW\u2019den 5.000 MW\u2019ye d\u00fc\u015f\u00fcrm\u00fc\u015f ard\u0131ndan yapt\u0131\u011f\u0131 a\u00e7\u0131klamalarda kurulu g\u00fc\u00e7 hedefleri olmad\u0131\u011f\u0131n\u0131, stratejilerinin verimlilik ve k\u00e2r odakl\u0131 oldu\u011funu vurgulam\u0131\u015ft\u0131.<\/p>\n<p style=\"color: #0a0a0a;\">Kaynak: EnerjiEnstit\u00fcs\u00fc<\/p>\n<\/div>\n<\/div>\n<footer style=\"color: #000000;\"><\/footer>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sabanc\u0131 ve Alman E.ON\u2019un ortakl\u0131\u011f\u0131 olan Enerjisa, \u015firketin bor\u00e7 seviyesini d\u00fc\u015f\u00fcrmek amac\u0131yla yat\u0131r\u0131m s\u00fcre\u00e7leri devam eden ve toplam 900 MW kurulu g\u00fc\u00e7te [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46049,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[3557,26605,422,26606,3239,26607,26608,1048],"views":1016,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46048"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=46048"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46048\/revisions"}],"predecessor-version":[{"id":46063,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/46048\/revisions\/46063"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/46049"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=46048"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=46048"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=46048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}