{"id":45568,"date":"2015-10-19T12:18:30","date_gmt":"2015-10-19T09:18:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=45568"},"modified":"2015-10-19T12:18:30","modified_gmt":"2015-10-19T09:18:30","slug":"alaboyun-3-havalimaninin-enerji-altyapisi-icin-42-milyon-lira-ayrildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/alaboyun-3-havalimaninin-enerji-altyapisi-icin-42-milyon-lira-ayrildi\/","title":{"rendered":"(Turkish) Alaboyun: \u201c3. Havaliman\u0131n\u0131n Enerji Altyap\u0131s\u0131 \u0130\u00e7in 42 Milyon Lira Ayr\u0131ld\u0131!\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/45568\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji ve Tabii Kaynaklar Bakan\u0131 Ali R\u0131za Alaboyun, 3. havaliman\u0131 i\u00e7in enerji altyap\u0131s\u0131 ile ilgili, \u201cHavaliman\u0131na enerji temin edecek Ta\u015foluk Tali Merkezi\u2019nin 2017 sonuna kadar tamamlanmas\u0131n\u0131 \u00f6ng\u00f6r\u00fcyoruz. Bu yat\u0131r\u0131m i\u00e7in 42 milyon lira b\u00fct\u00e7e ayr\u0131ld\u0131\u201d dedi.<\/strong><span id=\"more-73849\"><\/span><\/p>\n<p>Alaboyun, \u015f\u00f6yle devam ett<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/alaboyun-3-havalimaninin-enerji-altyapisi-icin-42-milyon-lira-ayrildi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-45569\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/alaboyun-3-havalimaninin-enerji-altyapisi-icin-42-milyon-lira-ayrildi-300x165.jpg\" alt=\"alaboyun-3-havalimaninin-enerji-altyapisi-icin-42-milyon-lira-ayrildi\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/alaboyun-3-havalimaninin-enerji-altyapisi-icin-42-milyon-lira-ayrildi-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/alaboyun-3-havalimaninin-enerji-altyapisi-icin-42-milyon-lira-ayrildi-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/alaboyun-3-havalimaninin-enerji-altyapisi-icin-42-milyon-lira-ayrildi-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/alaboyun-3-havalimaninin-enerji-altyapisi-icin-42-milyon-lira-ayrildi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>i: \u201cT\u00fcrkiye Elektrik \u0130letim A\u015e\u2019nin (TE\u0130A\u015e) yat\u0131r\u0131m program\u0131 kapsam\u0131na al\u0131nan 380\/54 kV g\u00fcc\u00fcndeki Ta\u015foluk Tali Merkezi 3. havaliman\u0131na enerji temin edecek. Yer tespiti yap\u0131ld\u0131. Hazineye ait sahan\u0131n TE\u0130A\u015e\u2019a devri de yak\u0131n bir tarihte tamamlanacak.\u201d<\/p>\n<p>Alaboyun, yeni havaliman\u0131n\u0131n enerji temini i\u00e7in ayr\u0131ca 4\u00d7100 megavolt amper (MVA) kurulu g\u00fcc\u00fcnde 154\/33 kV\u2019lik gaz izole transformat\u00f6r merkezinin de y\u00fcklenici firma taraf\u0131ndan tesis edilece\u011fini ve i\u015fletilece\u011fini belirterek \u201c3. havaliman\u0131n\u0131n d\u0131\u015f\u0131nda olu\u015facak tesislerin enerji temini i\u00e7in de Gaz \u0130zole Transformat\u00f6r Merkezinin hemen yan\u0131nda 2\u00d7100 MVA kurulu g\u00fcc\u00fcnde bir trafo merkezinin de yap\u0131laca\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji ve Tabii Kaynaklar Bakan\u0131 Ali R\u0131za Alaboyun, 3. havaliman\u0131 i\u00e7in enerji altyap\u0131s\u0131 ile ilgili, \u201cHavaliman\u0131na enerji temin edecek Ta\u015foluk Tali Merkezi\u2019nin 2017 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":45569,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[26406,25276,63,67,1009,2698,165,26407,26408,1582,3479],"views":653,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/45568"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=45568"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/45568\/revisions"}],"predecessor-version":[{"id":45570,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/45568\/revisions\/45570"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/45569"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=45568"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=45568"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=45568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}