{"id":45035,"date":"2015-10-06T10:44:05","date_gmt":"2015-10-06T07:44:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=45035"},"modified":"2015-10-06T11:25:39","modified_gmt":"2015-10-06T08:25:39","slug":"mahkemeden-calik-holdingin-karaburundaki-reslerine-durdurma","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mahkemeden-calik-holdingin-karaburundaki-reslerine-durdurma\/","title":{"rendered":"(Turkish) Mahkemeden \u00c7al\u0131k Holding\u2019in Karaburun\u2019daki RES\u2019lerine Durdurma&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/45035\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #222222;\"><a style=\"color: #1e73be;\" href=\"http:\/\/statik3.enerjienstitusu.com\/wp-content\/uploads\/karaburun-RES-2893.jpg\" target=\"_blank\"><img loading=\"lazy\" class=\" wp-image-73713 aligncenter\" src=\"http:\/\/statik3.enerjienstitusu.com\/wp-content\/uploads\/karaburun-RES-2893.jpg\" alt=\"karaburun RES 2893\" width=\"532\" height=\"353\" \/><\/a><\/p>\n<p style=\"color: #222222;\">\u00c7al\u0131k Holding\u2019in, b\u00fcy\u00fck tart\u0131\u015fmalara yol a\u00e7an r\u00fczgar enerjisi santrallerine (RES) mahkemeden durdurma karar\u0131 \u00e7\u0131kt\u0131.<span id=\"more-73711\"><\/span><\/p>\n<p style=\"color: #222222;\">\u0130zmir\u2019in do\u011fal yap\u0131s\u0131yla dikkat \u00e7eken b\u00f6lgelerinden Karaburun il\u00e7esinde, \u00e7evre \u00f6rg\u00fctleri ve y\u00f6re halk\u0131n\u0131n a\u00e7t\u0131\u011f\u0131 davada karar \u00e7\u0131kt\u0131. B\u00f6lgedeki di\u011fer tesislere de emsal te\u015fkil edebilecek iptal davas\u0131nda vatanda\u015flar\u0131n taleplerini ve itirazlar\u0131n\u0131 inceleyen \u0130zmir 5. \u0130dare Mahkemesi, \u00c7al\u0131k Holding\u2019in tart\u0131\u015fmalara yol a\u00e7an enerji projelerini durdurdu. \u00c7evre ve Ekoloji Hareketi Avukatlar\u0131 (\u00c7EHAV) deste\u011fiyle ba\u015flat\u0131lan hukuk m\u00fccadelesinde, \u00c7al\u0131k Enerji taraf\u0131ndan Karaburun\u2019un Hasseki ve Sarp\u0131nc\u0131k k\u00f6yleri b\u00f6lgesinde yap\u0131lmas\u0131 planlanan \u201cSarp\u0131nc\u0131k RES\u201d projesi, \u00c7evresel Etki De\u011ferlendirmesi (\u00c7ED) olumlu karar\u0131n\u0131n y\u00fcr\u00fctmesinin durdurularak iptali talebiyle a\u00e7\u0131lan davada mahkeme, \u00c7ED raporunun iptaline karar verdi. Mahkeme, karar\u0131nda \u015fu ifadelere yer verdi:<\/p>\n<p style=\"color: #222222;\">\u201c\u00c7ED olumlu karar\u0131na konu projenin yer ald\u0131\u011f\u0131 yar\u0131madan\u0131n do\u011fal yap\u0131s\u0131, co\u011frafi konumu, projenin yer ald\u0131\u011f\u0131 yar\u0131madada bulunan r\u00fczgar t\u00fcrbinlerinin k\u00fcm\u00fclatif olarak \u00e7evre etki de\u011ferleri dikkate al\u0131nd\u0131\u011f\u0131nda, yeni bir projenin daha bu alanda faaliyete ge\u00e7mesinin, zengin bir biyo \u00e7e\u015fitlili\u011fi bar\u0131nd\u0131ran yar\u0131madada ya\u015fayan canl\u0131lar\u0131n s\u0131\u011f\u0131naca\u011f\u0131 ba\u015fka bir ya\u015fam alan\u0131 b\u0131rakmayaca\u011f\u0131 sonucuna var\u0131ld\u0131\u011f\u0131ndan, dava konusu kararda hukuka uygunluk bulunmam\u0131\u015ft\u0131r. A\u00e7\u0131klanan nedenlerle hukuka ayk\u0131r\u0131l\u0131\u011f\u0131 a\u00e7\u0131k olan dava konusu i\u015flemin, uygulanmas\u0131 halinde telafisi g\u00fc\u00e7 zararlar do\u011fabilece\u011finden y\u00fcr\u00fct\u00fclmesinin durdurulmas\u0131na, itiraz yolu kapal\u0131 olmak \u00fczere oybirli\u011fiyle karar verildi.\u201d<\/p>\n<p style=\"color: #222222;\">Kaynak: EnerjiEnstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7al\u0131k Holding\u2019in, b\u00fcy\u00fck tart\u0131\u015fmalara yol a\u00e7an r\u00fczgar enerjisi santrallerine (RES) mahkemeden durdurma karar\u0131 \u00e7\u0131kt\u0131. \u0130zmir\u2019in do\u011fal yap\u0131s\u0131yla dikkat \u00e7eken b\u00f6lgelerinden Karaburun il\u00e7esinde, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":45036,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[1051,2878,8055,2689,24152,5132,26146],"views":1134,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/45035"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=45035"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/45035\/revisions"}],"predecessor-version":[{"id":45044,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/45035\/revisions\/45044"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/45036"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=45035"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=45035"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=45035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}