{"id":44864,"date":"2015-10-01T14:03:21","date_gmt":"2015-10-01T11:03:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=44864"},"modified":"2015-10-01T14:03:21","modified_gmt":"2015-10-01T11:03:21","slug":"akenerji-akocak-hidroelektrik-santralini-95-milyon-dolara-satacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akenerji-akocak-hidroelektrik-santralini-95-milyon-dolara-satacak\/","title":{"rendered":"(Turkish) Akenerji, Akocak Hidroelektrik Santrali\u2019ni 95 Milyon Dolara Satacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/44864\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Akenerji, Akocak Hidroelektrik Santrali\u2019ni 95 milyon dolara sataca\u011f\u0131n\u0131 bildirdi.<\/strong><span id=\"more-73661\"><\/span><\/p>\n<p>Akenerji\u2019den Kamuyu Ayd\u0131nlatma Platformu\u2019na yap\u0131lan a\u00e7\u0131klamada, \u201d18.09.2015 tarihli \u00f6zel durum a\u00e7\u0131klamam\u0131zla Akocak Hidroelektik Santralimiz ve<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/akenerji-akocak-hidroelektrik-santralini-95-milyon-dolara-satacak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-44865\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/akenerji-akocak-hidroelektrik-santralini-95-milyon-dolara-satacak-300x165.jpg\" alt=\"akenerji-akocak-hidroelektrik-santralini-95-milyon-dolara-satacak\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/akenerji-akocak-hidroelektrik-santralini-95-milyon-dolara-satacak-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/akenerji-akocak-hidroelektrik-santralini-95-milyon-dolara-satacak-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/akenerji-akocak-hidroelektrik-santralini-95-milyon-dolara-satacak-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/10\/akenerji-akocak-hidroelektrik-santralini-95-milyon-dolara-satacak.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> ekipman\u0131n\u0131n bir \u015firkete sat\u0131\u015f\u0131 konusunda taraflar aras\u0131nda s\u00f6zle\u015fme h\u00fck\u00fcmleri ile ilgili olarak mutabakat sa\u011fland\u0131\u011f\u0131 ve sat\u0131\u015f\u0131n tamamlanmas\u0131na ili\u015fkin i\u015f ve i\u015flemlere ba\u015fland\u0131\u011f\u0131n\u0131 bildirmi\u015f, Sat\u0131\u015f i\u015fleminin tamamlanmas\u0131n\u0131n hem sat\u0131c\u0131 ve hem de al\u0131c\u0131 taraf\u00e7a baz\u0131 vecibelerin yerine getirilmesi \u00f6n \u015fart\u0131na ba\u011flanm\u0131\u015f olmas\u0131 sebebiyle, daha detayl\u0131 a\u00e7\u0131klaman\u0131n s\u00fcrecin ilerleyen safhalar\u0131nda payla\u015f\u0131laca\u011f\u0131n\u0131 a\u00e7\u0131klam\u0131\u015ft\u0131k.<\/p>\n<p>Baz\u0131 Akenerji yat\u0131r\u0131mc\u0131lar\u0131ndan gelen sorulara istinaden, yukar\u0131da belirtildi\u011fi \u015fekilde hem \u015eirketimiz hem de al\u0131c\u0131 taraf\u00e7a yerine getirilmesi gereken vecibelerin ifas\u0131n\u0131 takiben elde edilecek s\u00f6zle\u015fme bedelinin KDV dahil 95 milyon ABD Dolar\u0131 olaca\u011f\u0131n\u0131 bilgilerinize sunar\u0131z.\u201d denildi.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Akenerji, Akocak Hidroelektrik Santrali\u2019ni 95 milyon dolara sataca\u011f\u0131n\u0131 bildirdi. Akenerji\u2019den Kamuyu Ayd\u0131nlatma Platformu\u2019na yap\u0131lan a\u00e7\u0131klamada, \u201d18.09.2015 tarihli \u00f6zel durum a\u00e7\u0131klamam\u0131zla Akocak Hidroelektik Santralimiz [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44865,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[3762,26048,63,67,1009,2698,165,35370,26045,26043,26046,26047,1210,1090,26044,16538],"views":1309,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44864"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=44864"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44864\/revisions"}],"predecessor-version":[{"id":44866,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44864\/revisions\/44866"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/44865"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=44864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=44864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=44864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}