{"id":44518,"date":"2015-09-22T23:47:39","date_gmt":"2015-09-22T20:47:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=44518"},"modified":"2015-09-22T23:47:39","modified_gmt":"2015-09-22T20:47:39","slug":"en-buyuk-4-hesi-olan-ilisu-projesi-teror-nedeniyle-2-yil-gecikecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/en-buyuk-4-hesi-olan-ilisu-projesi-teror-nedeniyle-2-yil-gecikecek\/","title":{"rendered":"(Turkish) En B\u00fcy\u00fck 4. HES\u2019i Olan Il\u0131su Projesi Ter\u00f6r Nedeniyle 2 Y\u0131l Gecikecek!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/44518\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin en b\u00fcy\u00fck 4\u2019\u00fcnc\u00fc HES\u2019i olacak Il\u0131su Projesi\u2019nde ter\u00f6r olaylar\u0131 y\u00fcz\u00fcnden \u00e7al\u0131\u015fmalar durma noktas\u0131na geldi. 2 y\u0131l\u0131 bulacak gecikmenin maliyeti 2.2 milyar lira olacak.<\/strong><span id=\"more-73558\"><\/span><\/p>\n<p>B\u00f6l\u00fcc\u00fc ter\u00f6r \u00f6rg\u00fct\u00fc PKK\u2019n\u0131n sald\u0131r\u0131lar\u0131, T\u00fcrkiye\u2019nin kurulu g\u00fc\u00e7 ve y\u0131ll\u0131k enerji \u00fcretim kapasitesi bak\u0131m\u0131ndan Atat\u00fcrk, Karakaya ve Keban barajlar\u0131ndan sonra 4\u2019\u00fcnc\u00fc b\u00fcy\u00fck HES olma \u00f6zelli\u011fini kazanacak olan Il\u0131su\u2019nun yap\u0131m\u0131na darbe v<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/en-buyuk-4-hesi-olan-ilisu-projesi-teror-nedeniyle-2-yil-gecikecek.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-44519\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/en-buyuk-4-hesi-olan-ilisu-projesi-teror-nedeniyle-2-yil-gecikecek-300x165.jpg\" alt=\"I\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/en-buyuk-4-hesi-olan-ilisu-projesi-teror-nedeniyle-2-yil-gecikecek-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/en-buyuk-4-hesi-olan-ilisu-projesi-teror-nedeniyle-2-yil-gecikecek-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/en-buyuk-4-hesi-olan-ilisu-projesi-teror-nedeniyle-2-yil-gecikecek-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/en-buyuk-4-hesi-olan-ilisu-projesi-teror-nedeniyle-2-yil-gecikecek.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>urdu. Baraj \u015fantiyesindeki \u00e7al\u0131\u015fmalar durma noktas\u0131na gelirken, baraj\u0131n tamamlanmas\u0131n\u0131n 2 y\u0131l gecikece\u011fi ortaya \u00e7\u0131kt\u0131. Enerji \u00fcretimin yan\u0131 s\u0131ra Nusaybin, Cizre, \u0130dil, Silopi ovalar\u0131n\u0131n sulanmas\u0131n\u0131 da etkileyecek bu durumun devlete maliyeti 2.2 milyar lira olarak hesapland\u0131.<\/p>\n<p>Enerji Bir-Sen Genel Ba\u015fkan\u0131 Hac\u0131 Bayram Tonbul, 4 milyon d\u00f6n\u00fcme yak\u0131n araziyi suyla bulu\u015fturacak ve b\u00f6lge halk\u0131n\u0131 refaha kavu\u015fturacak sulama projelerin ter\u00f6r \u00f6rg\u00fct\u00fc PKK taraf\u0131ndan engellendi\u011fini ifade etti.<\/p>\n<p>Ter\u00f6ristlerin, barajlar\u0131n su tutmaya ba\u015flamas\u0131n\u0131n ard\u0131ndan ge\u00e7i\u015f g\u00fczergahlar\u0131yla, kulland\u0131klar\u0131 ma\u011fara ve s\u0131\u011f\u0131naklar\u0131n su alt\u0131nda kalaca\u011f\u0131ndan endi\u015felendi\u011fi vurgulayan Tonbul, \u015f\u00f6yle devam etti: \u201cTer\u00f6r \u00f6rg\u00fct\u00fc her f\u0131rsatta baraj in\u015faatlar\u0131na y\u00f6nelik sald\u0131r\u0131 ger\u00e7ekle\u015ftiriyor. Projelerin ger\u00e7ekle\u015fmesine mani olmak i\u00e7in i\u015f\u00e7i ve m\u00fchendis ka\u00e7\u0131r\u0131p, i\u015f makinelerini yak\u0131yor ve baraj yoluna patlay\u0131c\u0131 yerle\u015ftiriyor.\u201d<\/p>\n<p>G\u00fcc\u00fc: 6X200 = 1200MW<br \/>\nG\u00f6l Hacmi : 10.6 Milyar M3<br \/>\n\u0130n\u015faat tahmini yap\u0131m bedeli : 875.000.000 euro<\/p>\n<p><a href=\"http:\/\/statik3.enerjienstitusu.com\/wp-content\/uploads\/%C4%B1l%C4%B1su-hes-2783.jpg\" target=\"_blank\"><img loading=\"lazy\" class=\" wp-image-73560 aligncenter\" src=\"http:\/\/statik3.enerjienstitusu.com\/wp-content\/uploads\/%C4%B1l%C4%B1su-hes-2783.jpg\" alt=\"Il\u0131su Baraj\u0131 ve HES\" width=\"565\" height=\"312\" \/><\/a><\/p>\n<p>Enerji Bir-Sen Genel Ba\u015fkan\u0131 Tonbul, Il\u0131su projesinin bu y\u0131l tamamlanmas\u0131 gerekti\u011fine i\u015faret ederek, \u015funlar\u0131 kaydetti: \u201cTer\u00f6r olaylar nedeniyle baraj \u015fantiyesindeki \u00e7al\u0131\u015fmalar durma noktas\u0131na geldi. Il\u0131su projesi, planlanan s\u00fcresinden 2 y\u0131l daha ge\u00e7 tamamlanacak. 2 y\u0131ll\u0131k gecikmenin devlete maliyeti, 2 milyar 190 milyon liray\u0131 buluyor. Kamu g\u00f6revlileri ya\u015fanan ter\u00f6r olaylar\u0131 nedeniyle istifa ediyor. 34 kamu g\u00f6revlisi memuriyetten istifa etti. Buralarda \u00e7al\u0131\u015fan personelin can g\u00fcvenli\u011fi yok. Personele s\u00fcrekli tehdit mektuplar\u0131 geliyor.\u201d<\/p>\n<p>Cengiz \u0130n\u015faat ve Nurol \u0130n\u015faat taraf\u0131ndan y\u00fczde 50 ortakl\u0131kla yap\u0131m\u0131 s\u00fcren projenin mukavelesi A\u011fustos 2007\u2019de imzaland\u0131. \u015eirket sitesindeki bilgilere g\u00f6re, T\u00fcrkiye\u2019nin dolgu hacmi olarak Atat\u00fcrk Baraj\u0131\u2019\u0131ndan sonra 2\u2019nci, g\u00fc\u00e7 olarak 4\u2019\u00fcnc\u00fc b\u00fcy\u00fck baraj\u0131 olan Il\u0131su\u2019da \u00e7e\u015fitli nedenlerle durmalar ya\u015fand\u0131 ve y\u00fczde 75\u2019i tamamlanamad\u0131. Dicle Nehri \u00fczerinde, Mardin ve \u015e\u0131rnak il s\u0131n\u0131rlar\u0131 aras\u0131nda yer alan Il\u0131su Baraj\u0131\u2019n\u0131n tahmini in\u015faat yap\u0131m bedeli 875 milyon euro olarak bildirildi. Il\u0131su, d\u00fcnya s\u0131ralamas\u0131nda, en uzun krete ve en b\u00fcy\u00fck \u00f6n y\u00fcz\u00fc beton kaplama alan\u0131na sahip barajlar aras\u0131nda 1\u2019inci s\u0131rada yer al\u0131yor.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin en b\u00fcy\u00fck 4\u2019\u00fcnc\u00fc HES\u2019i olacak Il\u0131su Projesi\u2019nde ter\u00f6r olaylar\u0131 y\u00fcz\u00fcnden \u00e7al\u0131\u015fmalar durma noktas\u0131na geldi. 2 y\u0131l\u0131 bulacak gecikmenin maliyeti 2.2 milyar lira [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44519,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[2952,17360,63,25819,67,1009,2698,165,1445,25820,25821,71,21,3767,5751,25822,25823,25824,25825],"views":1580,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44518"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=44518"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44518\/revisions"}],"predecessor-version":[{"id":44520,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44518\/revisions\/44520"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/44519"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=44518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=44518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=44518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}