{"id":44391,"date":"2015-09-18T20:53:14","date_gmt":"2015-09-18T17:53:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=44391"},"modified":"2015-09-18T20:53:14","modified_gmt":"2015-09-18T17:53:14","slug":"istanbula-50-mwlik-ruzgar-enerjisi-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/istanbula-50-mwlik-ruzgar-enerjisi-santrali\/","title":{"rendered":"(Turkish) \u0130stanbul`a 50 MW`l\u0131k R\u00fczgar Enerjisi Santrali!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/44391\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130STRES Elektrik, \u0130stanbul ili, \u00c7atalca ve Silivri il\u00e7eleri s\u0131n\u0131rlar\u0131 i\u00e7erisinde 50 MW`l\u0131k Tayakad\u0131n RES kuracak.<\/strong><\/p>\n<p>\u0130STRES Elektrik \u00dcretim A.\u015e. taraf\u0131ndan \u0130stanbul ili, \u00c7atalca ve Silivri il\u00e7eleri s\u0131n\u0131rlar\u0131 i\u00e7erisinde Ayd\u0131nlar k\u00f6y\u00fc, Yaylac\u0131k k\u00f6y\u00fc ve Bink\u0131l\u0131\u00e7 Atat\u00fcrk Ma<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/istanbula-50-mwlik-ruzgar-enerjisi-santrali.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-44392\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/istanbula-50-mwlik-ruzgar-enerjisi-santrali-300x144.jpg\" alt=\"istanbula-50-mwlik-ruzgar-enerjisi-santrali\" width=\"300\" height=\"144\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/istanbula-50-mwlik-ruzgar-enerjisi-santrali-300x144.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/istanbula-50-mwlik-ruzgar-enerjisi-santrali-500x241.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/istanbula-50-mwlik-ruzgar-enerjisi-santrali-80x38.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/istanbula-50-mwlik-ruzgar-enerjisi-santrali.jpg 564w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>hallesi k\u00f6y\u00fc civarlar\u0131nda yer alan \u00c7ad\u0131ralan mevkii, Uzuntarla, \u00c7atalsakal s\u0131rt\u0131, Sekiztepe mevkii, Kocatarla, Sar\u0131yer s\u0131rt\u0131, Armuttarla, Metealan s\u0131rt\u0131, Dayama s\u0131rt\u0131, Tum tepe, K\u0131z\u0131lc\u0131k tepe, Akyar s\u0131rt\u0131, Barut\u00e7ualan mevkiilerinde konumland\u0131r\u0131lacak 30 adet r\u00fczgar t\u00fcrbini ile 50 MW`l\u0131k Tayakad\u0131n RES kurulmas\u0131 planlan\u0131yor.<\/p>\n<p>200.000.000 TL bedelli projede Santralden y\u0131lda 175.200.000 kWh elektrik \u00fcretilmesi \u00f6ng\u00f6r\u00fcl\u00fcyor. \u00dcretilecek enerjinin, 154 kV \u00c7atalca-Havza TM ba\u011flant\u0131 noktas\u0131na ba\u011flanmas\u0131 planlan\u0131yor.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler \u0130stanbul Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: B\u00fcltenler<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130STRES Elektrik, \u0130stanbul ili, \u00c7atalca ve Silivri il\u00e7eleri s\u0131n\u0131rlar\u0131 i\u00e7erisinde 50 MW`l\u0131k Tayakad\u0131n RES kuracak. \u0130STRES Elektrik \u00dcretim A.\u015e. taraf\u0131ndan \u0130stanbul ili, \u00c7atalca [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44392,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[3808,5927,63,67,1009,2698,165,1967,25753,474,22653,69,16,231,22631,23318,22615,4784,2619,25754],"views":1478,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44391"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=44391"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44391\/revisions"}],"predecessor-version":[{"id":44393,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44391\/revisions\/44393"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/44392"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=44391"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=44391"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=44391"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}