{"id":44243,"date":"2015-09-15T09:27:50","date_gmt":"2015-09-15T06:27:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=44243"},"modified":"2015-09-15T10:44:42","modified_gmt":"2015-09-15T07:44:42","slug":"zorlu-enerjinin-alasehir-i-jeotermal-santrali-elektrik-satisina-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-enerjinin-alasehir-i-jeotermal-santrali-elektrik-satisina-basladi\/","title":{"rendered":"(Turkish) Zorlu Enerji\u2019nin Ala\u015fehir I Jeotermal Santrali Elektrik Sat\u0131\u015f\u0131na Ba\u015flad\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/44243\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #222222;\"><strong>Zorlu Enerji\u2019nin y\u00fczde 100 oran\u0131nda hissedar\u0131 oldu\u011fu Zorlu Jeotermal Enerji\u2019nin 45 MW kurulu g\u00fcce sahip Ala\u015fehir I projesi kapsam\u0131ndaki jeotermal santralinin 33,73 MW\u2019l\u0131k ilk faz\u0131n\u0131n performans ve g\u00fcvenilirlik testleri ba\u015far\u0131yla tamamland\u0131.<\/strong><span id=\"more-73475\"><\/span><\/p>\n<p style=\"color: #222222;\"><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-jeotermal-238933-696x385.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-44244\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-jeotermal-238933-696x385-300x165.jpg\" alt=\"zorlu-jeotermal-238933-696x385\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-jeotermal-238933-696x385-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-jeotermal-238933-696x385-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-jeotermal-238933-696x385-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-jeotermal-238933-696x385.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p style=\"color: #222222;\">Zorlu Enerji\u2019den yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, tesisten ticari elektrik sat\u0131\u015f\u0131na ba\u015fland\u0131.<\/p>\n<p style=\"color: #222222;\">\u015eirket\u2019in a\u00e7\u0131klamas\u0131nda \u015fu bilgiler verildi:<\/p>\n<p style=\"color: #222222;\">\u201c\u015eirketimizin % 100 oran\u0131nda hissedar\u0131 oldu\u011fu Zorlu Jeotermal Enerji Elektrik \u00dcretimi A\u015e taraf\u0131ndan Manisa\u2019n\u0131n Ala\u015fehir il\u00e7esinde yap\u0131m\u0131 devam eden 45 MW kurulu g\u00fcce sahip Ala\u015fehir I projesi kapsam\u0131ndaki jeotermal santralinin 33,73 MW\u2019l\u0131k ilk faz\u0131n\u0131n performans ve g\u00fcvenilirlik testleri ba\u015far\u0131yla tamamlanm\u0131\u015f olup, Bakanl\u0131k resmi kab\u00fcl\u00fcn\u00fcn yap\u0131lmas\u0131n\u0131n ard\u0131ndan, santral 12.09.2015 tarihi itibar\u0131yla ticari elektrik sat\u0131\u015f\u0131na ba\u015flam\u0131\u015ft\u0131r. Geri kalan 11,27 MW\u2019l\u0131k kapasitenin Ekim ay\u0131 i\u00e7inde i\u015fletmeye al\u0131nmas\u0131 hedeflenmektedir.\u201d<\/p>\n<p style=\"color: #222222;\">Kaynak: EnerjiEnstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Zorlu Enerji\u2019nin y\u00fczde 100 oran\u0131nda hissedar\u0131 oldu\u011fu Zorlu Jeotermal Enerji\u2019nin 45 MW kurulu g\u00fcce sahip Ala\u015fehir I projesi kapsam\u0131ndaki jeotermal santralinin 33,73 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44244,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[25670,25671,1462,19,56,4136,6322,2191,344,25672],"views":1184,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44243"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=44243"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44243\/revisions"}],"predecessor-version":[{"id":44245,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44243\/revisions\/44245"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/44244"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=44243"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=44243"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=44243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}