{"id":44211,"date":"2015-09-14T09:50:08","date_gmt":"2015-09-14T06:50:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=44211"},"modified":"2015-09-14T10:24:05","modified_gmt":"2015-09-14T07:24:05","slug":"tuprasta-modernizasyon","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tuprasta-modernizasyon\/","title":{"rendered":"(Turkish) T\u00fcpra\u015f&#8217;ta Modernizasyon&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/44211\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div><strong>T\u00fcrkiye Petrol Rafinerileri A\u015e (T\u00fcpra\u015f) \u0130zmir rafinerisi 220 milyon liral\u0131k yat\u0131r\u0131mla modernize edilecek.\u00a0<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/HaberResmi-20150912135742_Manset_mansettyildiz.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-44212\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/HaberResmi-20150912135742_Manset_mansettyildiz-300x158.jpg\" alt=\"-HaberResmi-20150912135742_Manset_mansettyildiz\" width=\"300\" height=\"196\" \/><\/a><\/strong><\/div>\n<div><\/div>\n<div>T\u00fcpra\u015f, \u0130zmir&#8217;deki rafinerisine y\u00f6nelik modernizasyon yat\u0131r\u0131m\u0131 yapacak. Modernizasyon \u00e7al\u0131\u015fmalar\u0131 i\u00e7in 220 milyon liral\u0131k kaynak kullan\u0131lacak. Bu yat\u0131r\u0131m kapsam\u0131nda 28 milyon 710 bin 384 dolarl\u0131k da makine ve te\u00e7hizat ithal edilecek.<\/div>\n<div><\/div>\n<div>Modernizasyon \u00e7al\u0131\u015fmalar\u0131 sonunda tesisin LPG i\u015fleme kapasitesi y\u0131ll\u0131k 567 bin 989 ton, benzin i\u015fleme kapasitesi 1 milyon 777 bin 57 ton, jet yak\u0131t\u0131 i\u015fleme kapasitesi 1 milyon 466 bin 954 ton, NAFTA i\u015fleme kapasitesi 500 bin 454, motorin i\u015fleme kapasitesi 3 milyon 381 bin 998 ton, fuel oil i\u015fleme kapasitesi 2 milyon 459 bin 598 ton, di\u011fer rafine edilmi\u015f petrol \u00fcr\u00fcnleri i\u015fleme kapasitesi 1 milyon 976 bin 319 ton olacak.<\/div>\n<div><\/div>\n<div>B\u00f6ylece tesisin toplam i\u015fleme kapasitesi 11 milyon tondan 12 milyon 130 bin 369 tona ula\u015facak.<\/div>\n<div><\/div>\n<div><strong>Te\u015fvik kapsam\u0131na al\u0131nd\u0131\u00a0<\/strong><\/div>\n<div>Ekonomi Bakanl\u0131\u011f\u0131, s\u00f6z konusu modernizasyon \u00e7al\u0131\u015fmas\u0131n\u0131 yat\u0131r\u0131m te\u015fviki kapsam\u0131nda de\u011ferlendirdi. Buna g\u00f6re, yat\u0131r\u0131m\u0131n y\u00fczde 50 vergi indirimi, y\u00fczde 15 yat\u0131r\u0131m katk\u0131s\u0131, KDV istisnas\u0131, G\u00fcmr\u00fck Vergisi muafiyeti gibi te\u015fvik mekanizmalar\u0131ndan yararland\u0131r\u0131lmas\u0131 kararla\u015ft\u0131r\u0131ld\u0131.<\/div>\n<div><\/div>\n<div>T\u00fcpra\u015f b\u00fcnyesinde \u0130zmit, \u0130zmir, K\u0131r\u0131kkale ve Batman rafinerileri faaliyet g\u00f6steriyor. Rafinerilerin toplam i\u015fleme kapasitesi y\u0131ll\u0131k 28,1 milyon tonu buluyor.<\/div>\n<div><\/div>\n<div>Rafinerilerde ge\u00e7en y\u0131l 20 milyon ton ham petrol i\u015flendi.<\/div>\n<div><\/div>\n<div>T\u00fcpra\u015f, son 9 y\u0131lda toplam 5,2 milyar dolar yat\u0131r\u0131m harcamas\u0131 ger\u00e7ekle\u015ftirdi.<\/div>\n<p>Kaynak: PetroT\u00fcrk<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Petrol Rafinerileri A\u015e (T\u00fcpra\u015f) \u0130zmir rafinerisi 220 milyon liral\u0131k yat\u0131r\u0131mla modernize edilecek.\u00a0 T\u00fcpra\u015f, \u0130zmir&#8217;deki rafinerisine y\u00f6nelik modernizasyon yat\u0131r\u0131m\u0131 yapacak. Modernizasyon \u00e7al\u0131\u015fmalar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44212,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[2289,92,68,35369,4631,59,22132],"views":1193,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44211"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=44211"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44211\/revisions"}],"predecessor-version":[{"id":44213,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44211\/revisions\/44213"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/44212"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=44211"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=44211"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=44211"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}