{"id":44066,"date":"2015-09-09T22:25:34","date_gmt":"2015-09-09T19:25:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=44066"},"modified":"2015-09-09T22:25:34","modified_gmt":"2015-09-09T19:25:34","slug":"yeni-yonetmelikle-guneste-kucuk-ureticinin-engelleri-kaldiriliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeni-yonetmelikle-guneste-kucuk-ureticinin-engelleri-kaldiriliyor\/","title":{"rendered":"(Turkish) Yeni Y\u00f6netmelikle G\u00fcne\u015fte K\u00fc\u00e7\u00fck \u00dcreticinin Engelleri Kald\u0131r\u0131l\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/44066\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ufak g\u00fcne\u015f enerji santrallerinin yayg\u0131nla\u015fmas\u0131na Lisanss\u0131z Elektrik \u00dcretim Y\u00f6netmeli\u011fi (L\u00dcY) kapsam\u0131nda yay\u0131nlanan 50 kw\u2019e kadar G\u00fcne\u015f Enerjisine Dayal\u0131 Elektrik \u00dcretim Tesislerinin Tip \u015eartnamesi\u2019yle bir ad\u0131m daha at\u0131ld\u0131.<span id=\"more-73421\"><\/span> Yeni y\u00f6netmelikte getirilen de\u011fi\u015fiklikle kurulu g\u00fc\u00e7 art\u0131r\u0131l\u0131yor ve k\u00fc\u00e7\u00fck \u00fcreticinin \u00f6n\u00fcndeki b\u00fcrokratik engeller azalt\u0131l\u0131yor.<\/strong><\/p>\n<p>Uzun s\u00fcredir beklenen 50 kW g\u00fcc\u00fcndeki ufak g\u00fcne\u015f enerjisi santralleri (GES) ile ilgili y\u00f6netmelik ge\u00e7en hafta y\u00fcr\u00fcrl\u00fc\u011fe girdi. G\u00fcne\u015f Enerjisi Santralleri\u2019nin (GES) son 15 y\u0131lda ilgi g\u00f6rd\u00fc\u011f\u00fcn\u00fc belirten Hali\u00e7 \u00dcniversitesi Elektrik Elektronik M\u00fchendisli\u011fi \u00d6\u011fretim \u00dcyesi Prof. Dr<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/yeni-yonetmelikle-guneste-kucuk-ureticinin-onundeki-engeller-kaldiriliyor.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-44067\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/yeni-yonetmelikle-guneste-kucuk-ureticinin-onundeki-engeller-kaldiriliyor-300x165.jpg\" alt=\"yeni-yonetmelikle-guneste-kucuk-ureticinin-onundeki-engeller-kaldiriliyor\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/yeni-yonetmelikle-guneste-kucuk-ureticinin-onundeki-engeller-kaldiriliyor-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/yeni-yonetmelikle-guneste-kucuk-ureticinin-onundeki-engeller-kaldiriliyor-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/yeni-yonetmelikle-guneste-kucuk-ureticinin-onundeki-engeller-kaldiriliyor-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/yeni-yonetmelikle-guneste-kucuk-ureticinin-onundeki-engeller-kaldiriliyor.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>. Koray Tun\u00e7alp, 2014\u2019te \u00e7\u0131kan 30 kW kurulu g\u00fc\u00e7 hakk\u0131nda \u00e7\u0131kan y\u00f6netmeli\u011fe g\u00f6re 20 kW daha avantaj sa\u011fland\u0131\u011f\u0131n\u0131 belirtti.<\/p>\n<p>50 kw\u2019e \u00e7\u0131kar\u0131lmas\u0131yla k\u00fc\u00e7\u00fck \u00fcreticilerin ilgisinin artabilece\u011fini ifade eden Prof. Dr. Koray Tun\u00e7alp, GES panellerinin T\u00fcrkiye\u2019de yayg\u0131nla\u015fmas\u0131 i\u00e7in panellere uygun \u00e7at\u0131 yap\u0131lmas\u0131 gerekti\u011fini ifade etti: \u201c\u0130stanbul gibi kar alan b\u00f6lgelerde g\u00fcne\u015f santralinin konulaca\u011f\u0131 \u00e7at\u0131da 300-500 kiloya yak\u0131n kar y\u00fck\u00fc ciddi hasarlar yaratabilir. T\u00fcrkiye\u2019de yap\u0131lan in\u015faatlar\u0131n g\u00fcne\u015f panellerine uygunlu\u011fu bu anlamda incelenmesi gereken bir konudur. Benim bildi\u011fim bir iki b\u00fcy\u00fck projede solar sistemler ya da fotovoltaik sistemlerle ilgili \u00e7al\u0131\u015fma yap\u0131ld\u0131 ve ciddi verim al\u0131nd\u0131. Solarkent gibi baz\u0131 konut projelerinde de g\u00fcne\u015f panelleri kullan\u0131ld\u0131.\u201d<\/p>\n<p>GES yap\u0131m\u0131 i\u00e7in k\u00fc\u00e7\u00fck \u00fcreticinin kar\u015f\u0131lamas\u0131 gereken maliyetleri s\u0131ralayan Koray Tun\u00e7alp, \u201cGES i\u00e7in dan\u0131\u015fmanl\u0131k almak gerekiyor, bunun d\u0131\u015f\u0131nda santralin yap\u0131m\u0131 ve uygunluk belgeleri maliyet olu\u015fturuyor. Projenin \u00e7izilmesi ve onaylanmas\u0131 s\u00fcrecin di\u011fer bile\u015fenleri olarak yer al\u0131yor. Da\u011f\u0131t\u0131m firmas\u0131 \u00fcreticilere \u00e7a\u011fr\u0131 g\u00f6nderiyor, projeleri uygun olanlarla da anla\u015fma imzal\u0131yor. \u00dcreticinin anla\u015fmadan sonraki 1 y\u0131l i\u00e7inde \u00fcretim yapmas\u0131 gerekiyor\u201d dedi.<\/p>\n<p>GES\u2019lerin \u00f6n\u00fcm\u00fczdeki y\u0131llarda daha da yayg\u0131nla\u015faca\u011f\u0131ndan s\u00f6z eden Tun\u00e7alp, 50 kw\u2019nin yeterli olmayaca\u011f\u0131n\u0131 100 kw\u2019e \u00e7\u0131kar\u0131l\u0131rsa ilginin yo\u011funla\u015faca\u011f\u0131n\u0131 ifade etti: \u201c50 kw 6-7 daireli bir binan\u0131n t\u00fcketimine kar\u015f\u0131l\u0131k geliyor. \u015eah\u0131s veya t\u00fczel ki\u015fili\u011fi olan kurumlar GES yapabiliyor, belediyelerin veya kooperatiflerin ilgi g\u00f6stermesi gerekir, ancak onlar\u0131n t\u00fcketimine oranla 50 kw k\u00fc\u00e7\u00fck bir de\u011fer olarak kal\u0131yor. EPDK, TEDA\u015e bunu 100 kw\u2019a \u00e7\u0131kar\u0131rsa daha fazla ilgi olacakt\u0131r.\u201d<\/p>\n<p>K\u00fc\u00e7\u00fck \u00fcreticilerin lisanss\u0131z \u00fcretim kapsam\u0131nda oldu\u011funu belirten Tun\u00e7alp, GES imkanlar\u0131n\u0131 \u015f\u00f6yle aktard\u0131: \u201cLisanss\u0131z \u00fcreticiler ancak kendi t\u00fcketimlerini kar\u015f\u0131l\u0131yor, sat\u0131\u015f yapma imkanlar\u0131 bulunmuyor. Lisansl\u0131 \u00fcretim yapmak isteyen \u015fah\u0131slara veya t\u00fczel ki\u015filere \u00fcretim yapabileceklerine dair bir belge veriliyor. Lisansl\u0131 olan bir ticari konu iken k\u00fc\u00e7\u00fck \u00fcreticilerde ticaret d\u00fc\u015f\u00fcn\u00fclm\u00fcyor \u00e7\u00fcnk\u00fc kendi t\u00fcketimlerini kar\u015f\u0131layabilecekleri kadar elektrik enerjisi \u00fcretebiliyor. \u00dcreticiler fazla enerjiyi ak\u00fclerine depolayabiliyorlar veya \u015febekeye geri verebiliyor.\u201d<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ufak g\u00fcne\u015f enerji santrallerinin yayg\u0131nla\u015fmas\u0131na Lisanss\u0131z Elektrik \u00dcretim Y\u00f6netmeli\u011fi (L\u00dcY) kapsam\u0131nda yay\u0131nlanan 50 kw\u2019e kadar G\u00fcne\u015f Enerjisine Dayal\u0131 Elektrik \u00dcretim Tesislerinin Tip \u015eartnamesi\u2019yle [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44067,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[25556,63,67,1009,2698,165,750,2326,25555,227,13,1876,25557,4327,2282,25558,1216,105],"views":1377,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44066"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=44066"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44066\/revisions"}],"predecessor-version":[{"id":44068,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/44066\/revisions\/44068"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/44067"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=44066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=44066"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=44066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}