{"id":43914,"date":"2015-09-06T22:50:22","date_gmt":"2015-09-06T19:50:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=43914"},"modified":"2015-09-06T22:50:22","modified_gmt":"2015-09-06T19:50:22","slug":"zorlu-kizildere-jesin-dorduncusune-basliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-kizildere-jesin-dorduncusune-basliyor\/","title":{"rendered":"(Turkish) Zorlu, K\u0131z\u0131ldere JES`in D\u00f6rd\u00fcnc\u00fcs\u00fcne Ba\u015fl\u0131yor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/43914\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Zorlu Do\u011fal Elektrik \u00dcretim, 60 MW`l\u0131k K\u0131z\u0131ldere-IV Jeotermal Enerji Santrali projesini hayata ge\u00e7irecek.<\/strong><\/p>\n<p>Zorlu Do\u011fal Elektrik \u00dcretim A.\u0121. taraf\u0131ndan Ayd\u0131n \u0120li, Buharkent il\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisinde 60 MW kurulu g\u00fcc\u00fcnde K\u0131z\u0131ldere IV Jeotermal Enerji Santrali (JES)\u2019nin yat\u0131r\u0131m\u0131 planlan\u0131yor.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-kizildere-jesin-dorduncusune-basliyor.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-43915\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-kizildere-jesin-dorduncusune-basliyor-300x187.jpg\" alt=\"zorlu-kizildere-jesin-dorduncusune-basliyor\" width=\"300\" height=\"187\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-kizildere-jesin-dorduncusune-basliyor-300x187.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-kizildere-jesin-dorduncusune-basliyor-500x312.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-kizildere-jesin-dorduncusune-basliyor-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/09\/zorlu-kizildere-jesin-dorduncusune-basliyor.jpg 681w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>K\u0131z\u0131ldere-IV Jeotermal Enerji Santrali kapsam\u0131nda double flash teknolojisi ile 40 MW ve binary sistem teknolojisi ile 20 MWe elde edilmesi planlan\u0131yor. B\u00f6ylelikle toplamda 60 MW elde edilecek santralden y\u0131lda 550 GWh enerji \u00fcretilecek.<\/p>\n<p>K\u0131z\u0131ldere-IV jeotermal enerji santralinde \u00fcretilecek enerji, yakla\u015f\u0131k 1,7 km uzunlu\u011fundaki 154 kV gerilime sahip enerji iletim hatt\u0131 ile K\u0131z\u0131ldere 3 JES Trafo Merkezine ba\u011flanarak enterkonnekte sisteme verilecek.<\/p>\n<p>Bedeli 520.000.000 TL olarak belirlenen proje kapsam\u0131nda 10 adet \u00fcretim kuyusu ve 11 adet re-enjeksiyon kuyusunun i\u015fletilmesi planlan\u0131yor.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>Haziran ay\u0131nda \u00f6nlisans al\u0131nan proje i\u00e7in \u015fimdi de \u00c7ED S\u00fcreci ba\u015flad\u0131. \u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler Ayd\u0131n Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: B\u00fcltenler<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Zorlu Do\u011fal Elektrik \u00dcretim, 60 MW`l\u0131k K\u0131z\u0131ldere-IV Jeotermal Enerji Santrali projesini hayata ge\u00e7irecek. Zorlu Do\u011fal Elektrik \u00dcretim A.\u0121. taraf\u0131ndan Ayd\u0131n \u0120li, Buharkent il\u00e7esi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":43915,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[5927,63,67,1009,2698,165,58,56,6322,25465,25464,25463,344],"views":1732,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/43914"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=43914"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/43914\/revisions"}],"predecessor-version":[{"id":43916,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/43914\/revisions\/43916"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/43915"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=43914"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=43914"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=43914"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}