{"id":43059,"date":"2015-08-18T15:33:46","date_gmt":"2015-08-18T12:33:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=43059"},"modified":"2015-08-18T15:33:46","modified_gmt":"2015-08-18T12:33:46","slug":"tseden-yenilenebilir-enerjide-kamu-kurumlari-arasinda-bir-ilk","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tseden-yenilenebilir-enerjide-kamu-kurumlari-arasinda-bir-ilk\/","title":{"rendered":"(Turkish) TSE&#8217;den Yenilenebilir Enerjide Kamu Kurumlar\u0131 Aras\u0131nda Bir \u0130lk&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/43059\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrk Standardlar\u0131 Enstit\u00fcs\u00fc (TSE), kamu kurumlar\u0131 aras\u0131nda bir ilki ger\u00e7ekle\u015ftirerek, Gebze Kalite Kamp\u00fcs\u00fc\u2019n\u00fcn enerji ihtiyac\u0131n\u0131n y\u00fczde 40\u2019\u0131n\u0131 kar\u015f\u0131layacak olan lisanss\u0131z, \u015febekeye elektrik veren G\u00fcne\u015f Enerjisi Santrali (GES) kurdu.<\/strong><\/p>\n<p>TSE Ba\u015fkan\u0131 Sebahittin Korkmaz konuya ili\u015fkin yapt\u0131\u011f\u0131 yaz\u0131l\u0131 a\u00e7\u0131klamada, \u201c\u00dclkemizde ve d\u00fcnyada enerji t\u00fcketimi giderek artmaktad\u0131r. Enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamada kullan\u0131lan fosil yak\u0131tlar ise do\u011fay\u0131 geri d\u00f6n\u00fc\u015f\u00fc kolay olmayan bir<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/tseden-yenilenebilir-enerjide-kamu-kurumlari-arasinda-bir-ilk.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-43060\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/tseden-yenilenebilir-enerjide-kamu-kurumlari-arasinda-bir-ilk-300x165.jpg\" alt=\"tseden-yenilenebilir-enerjide-kamu-kurumlari-arasinda-bir-ilk\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/tseden-yenilenebilir-enerjide-kamu-kurumlari-arasinda-bir-ilk-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/tseden-yenilenebilir-enerjide-kamu-kurumlari-arasinda-bir-ilk-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/tseden-yenilenebilir-enerjide-kamu-kurumlari-arasinda-bir-ilk-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/tseden-yenilenebilir-enerjide-kamu-kurumlari-arasinda-bir-ilk.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> \u015fekilde kirletmekte ve sa\u011fl\u0131\u011f\u0131m\u0131z\u0131 tehdit etmektedir. Yenilenebilir enerji kaynaklar\u0131, s\u00fcrd\u00fcr\u00fclebilir kalk\u0131nma sa\u011flanmas\u0131 ve fosil yak\u0131tlardan kaynaklanan sera gaz\u0131 emisyonunun ve partik\u00fcl madde, siyah duman, karbon monoksit, hidrokarbon gibi havay\u0131 kirleten gazlar\u0131n azalt\u0131lmas\u0131 i\u00e7in \u00f6nemli bir enerji kayna\u011f\u0131d\u0131r\u201d dedi.<\/p>\n<p>TSE Ba\u015fkan\u0131 Korkmaz, \u201cT\u00fcrk Standardlar\u0131 Enstit\u00fcs\u00fc, Gebze\u2019deki Kalite Kamp\u00fcs\u00fc\u2019nde 1 MegaWatt\u2019l\u0131k G\u00fcne\u015f Enerjisi Santrali kurdu. TEDA\u015e\u2019\u0131n kabul a\u015famas\u0131nda olan santral y\u0131lda 1milyon 280 bin Wh elektrik \u00fcretecek. Kalite Kamp\u00fcs\u00fc\u2019n\u00fcn y\u0131ll\u0131k elektrik t\u00fcketiminin yakla\u015f\u0131k y\u00fczde 40\u2019\u0131n\u0131 kar\u015f\u0131lamas\u0131 \u00f6ng\u00f6r\u00fclen santral SEDA\u015e da\u011f\u0131t\u0131m \u015firketinin alan\u0131 i\u00e7erisindeki en y\u00fcksek kapasiteli, lisanss\u0131z, \u015febekeye elektrik veren ilk ve tek g\u00fcne\u015f enerjisi santralidir. 18 d\u00f6n\u00fcml\u00fck bir alana kurulan santralde, her biri 250 Wp g\u00fcc\u00fcnde 4 bin Multikristal PV Mod\u00fcl ve 31 Inverter kullan\u0131lm\u0131\u015ft\u0131r.<\/p>\n<p>TSE, yenilenebilir enerji alan\u0131nda ilk olarak 2011 y\u0131l\u0131nda \u0130stanbul Tuzla Kamp\u00fcs\u00fcm\u00fczde deneysel \u00e7al\u0131\u015fmalar i\u00e7in kurulan toplam 8 kilowattl\u0131k Hibrit (r\u00fczgar ve g\u00fcne\u015f) yenilenebilir enerji santrali ile pilot uygulama ba\u015flatm\u0131\u015f, santralin kuruldu\u011fu b\u00f6lgeye ait r\u00fczgar, g\u00fcne\u015f, meteorolojik veriler toplanarak ilgili kurum ve kurulu\u015flarla payla\u015f\u0131lm\u0131\u015f, r\u00fczgar t\u00fcrbinleri ve fotovoltaik mod\u00fcl deney laboratuvarlar\u0131 i\u00e7in gerekli \u00f6n \u00e7al\u0131\u015fmalar yap\u0131lm\u0131\u015f, sistemin zay\u0131f ve g\u00fc\u00e7l\u00fc y\u00f6nleri tespit edilerek kurulmas\u0131 planlanan deney laboratuvarlar\u0131 i\u00e7in yol haritas\u0131 \u00e7\u0131kar\u0131lm\u0131\u015ft\u0131r. B\u00f6ylece yenilenebilir enerji alan\u0131nda ilk olarak 2014 y\u0131l\u0131nda Ankara Ostim\u2019de G\u00fcne\u015f Enerjisi (Solar) Laboratuvar\u0131m\u0131z hizmete al\u0131nm\u0131\u015ft\u0131r. Deney sistemi hibrit g\u00fcne\u015f panellerini de test edecek \u015fekilde tasarlanm\u0131\u015ft\u0131r\u201d ifadelerini kulland\u0131.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrk Standardlar\u0131 Enstit\u00fcs\u00fc (TSE), kamu kurumlar\u0131 aras\u0131nda bir ilki ger\u00e7ekle\u015ftirerek, Gebze Kalite Kamp\u00fcs\u00fc\u2019n\u00fcn enerji ihtiyac\u0131n\u0131n y\u00fczde 40\u2019\u0131n\u0131 kar\u015f\u0131layacak olan lisanss\u0131z, \u015febekeye elektrik veren [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":43060,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,93,2698,165,25009,25010,2326,2569,25011,2062,2444,1216,4162,105],"views":1170,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/43059"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=43059"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/43059\/revisions"}],"predecessor-version":[{"id":43061,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/43059\/revisions\/43061"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/43060"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=43059"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=43059"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=43059"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}