{"id":43003,"date":"2015-08-17T11:55:55","date_gmt":"2015-08-17T08:55:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=43003"},"modified":"2015-08-17T14:49:45","modified_gmt":"2015-08-17T11:49:45","slug":"yerli-komur-kullanilan-270-mwlik-aksa-goynuk-termik-santrali-acildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yerli-komur-kullanilan-270-mwlik-aksa-goynuk-termik-santrali-acildi\/","title":{"rendered":"(Turkish) Yerli K\u00f6m\u00fcr Kullan\u0131lan 270 MW\u2019l\u0131k Aksa G\u00f6yn\u00fck Termik Santrali A\u00e7\u0131ld\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/43003\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<div class=\"td-a-rec td-a-rec-id-content_inlineleft \" style=\"color: #222222;\">\n<div id=\"ebDiv6386370228137821\" dir=\"ltr\">\n<div id=\"ebStdBannerDiv_29914304_6386370228137821\" dir=\"ltr\"><strong>Aksa Enerji taraf\u0131ndan temeli 2012 y\u0131l\u0131nda at\u0131lan, yerli k\u00f6m\u00fcr kullanarak enerji \u00fcretecek olan Aksa G\u00f6yn\u00fck&#8230;<\/strong><\/div>\n<div dir=\"ltr\">Enerji Termik Santrali\u2019nin a\u00e7\u0131l\u0131\u015f\u0131 Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z ve \u00c7evre ve \u015eehircilik Bakan\u0131 \u0130dris G\u00fcll\u00fcce\u2019nin kat\u0131l\u0131m\u0131yla ger\u00e7ekle\u015ftirildi.<strong>\u00a0<\/strong>T\u00fcrkiye\u2019nin \u00f6zel sekt\u00f6r taraf\u0131ndan yat\u0131r\u0131m\u0131 yap\u0131larak devreye al\u0131nan ve yerli k\u00f6m\u00fcr kullan\u0131lan iki santralinden biri olan Aksa G\u00f6yn\u00fck Enerji Termik Santrali\u2019ne 390 milyon Amerikan Dolar\u0131 yat\u0131r\u0131m yap\u0131ld\u0131. 270 megawatt (MW) kapasiteye sahip T\u00fcrkiye\u2019nin ilk r\u00f6dovansl\u0131 yat\u0131r\u0131m\u0131 olan santral, y\u0131lda 2 milyar kilowattsaatlik (kWh) \u00fcretim yapacak.<\/div>\n<div dir=\"ltr\">\n<p><a style=\"color: #1e73be;\" href=\"http:\/\/statik4.enerjienstitusu.com\/wp-content\/uploads\/AksaEnerji-Bolugoynuksantrali-21.jpg\" target=\"_blank\"><img loading=\"lazy\" class=\"  wp-image-73123 aligncenter\" src=\"http:\/\/statik4.enerjienstitusu.com\/wp-content\/uploads\/AksaEnerji-Bolugoynuksantrali-21.jpg\" alt=\"AksaEnerji-Bolugoynuksantrali-2\" width=\"511\" height=\"371\" \/><\/a><\/p>\n<p>T\u00fcrkiye\u2019nin lider serbest elektrik \u00fcreticilerinden olan Aksa Enerji, yerli k\u00f6m\u00fcrden enerji \u00fcretece\u011fi Aksa G\u00f6yn\u00fck Enerji Termik Santrali\u2019ni tamamlayarak a\u00e7\u0131l\u0131\u015f\u0131n\u0131 yapt\u0131. T\u00fcrkiye\u2019de yerli k\u00f6m\u00fcr kullanarak \u00f6zel sekt\u00f6r taraf\u0131ndan devreye al\u0131nm\u0131\u015f iki santralden biri olan Aksa G\u00f6yn\u00fck Enerji Termik Santrali, 270 MW enerji \u00fcretim kapasitesiyle T\u00fcrkiye\u2019nin elektrik ihtiyac\u0131n\u0131n y\u00fczde 1\u2019ini kar\u015f\u0131layacak. Aksa\u2019n\u0131n yak\u0131t karmas\u0131na ilk kez linyiti ekledi\u011fi santralde y\u0131lda 1 milyon 800 bin ton yerli k\u00f6m\u00fcr kullan\u0131lacak.<\/p>\n<p>Aksa Enerji\u2019nin 390 milyon Amerikan Dolar\u2019l\u0131k yat\u0131r\u0131mla faaliyete ge\u00e7irdi\u011fi Aksa G\u00f6yn\u00fck Enerji Termik Santrali, ayn\u0131 zamanda T\u00fcrkiye K\u00f6m\u00fcr \u0130\u015fletmeleri Kurumu\u2019nun (TK\u0130), linyit k\u00f6m\u00fcr\u00fc sahalar\u0131n\u0131 \u00f6zel sekt\u00f6re a\u00e7mas\u0131yla birlikte T\u00fcrkiye\u2019nin ilk r\u00f6dovansl\u0131 yat\u0131r\u0131m\u0131 olmas\u0131 nedeniyle de b\u00fcy\u00fck \u00f6nem ta\u015f\u0131yor.<br \/>\nElektrik \u00fcretiminde yerli yat\u0131r\u0131m\u0131 destekleyen santral ile ilgili Aksa Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 Cemil Kazanc\u0131 \u201cT\u00fcrkiye\u2019de bir ilk olarak r\u00f6dovans y\u00f6ntemiyle yerli linyitten \u00fcretece\u011fimiz elektrik, enerjide d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131m\u0131z\u0131 azaltarak ekonomiye \u00f6nemli \u00f6l\u00e7\u00fcde katk\u0131 sa\u011flayacak. Y\u0131ll\u0131k 2 milyar kWh elektrik \u00fcretimi yapaca\u011f\u0131m\u0131z G\u00f6yn\u00fck Termik Santrali, do\u011frudan ve dolayl\u0131 ba\u015fta b\u00f6lge halk\u0131 olmak \u00fczere bin ki\u015fiye de i\u015f imkan\u0131 sa\u011flayacak\u201d dedi. Linyit yat\u0131r\u0131mlar\u0131na devam edeceklerini a\u00e7\u0131klayan Cemil Kazanc\u0131, Afrika\u2019da Gana Cumhuriyeti ile 370 MW\u2019l\u0131k enerji santrali kurulumu ve enerji \u00fcretimi i\u00e7in imzalad\u0131klar\u0131 yeni anla\u015fmayla, enerji ve altyap\u0131 yat\u0131r\u0131m\u0131 ihtiyac\u0131 bulunan Afrika \u00fclkelerine giri\u015f yaparak, \u015firketin karl\u0131l\u0131\u011f\u0131n\u0131 ve d\u00f6viz bazl\u0131 sat\u0131\u015flar\u0131n\u0131n hacmini art\u0131rmay\u0131 hedeflediklerini belirtti.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<\/div>\n<\/div>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji taraf\u0131ndan temeli 2012 y\u0131l\u0131nda at\u0131lan, yerli k\u00f6m\u00fcr kullanarak enerji \u00fcretecek olan Aksa G\u00f6yn\u00fck&#8230; Enerji Termik Santrali\u2019nin a\u00e7\u0131l\u0131\u015f\u0131 Enerji ve Tabii [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":43004,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,24649],"tags":[1571,24983,24984,667,438,1718,1817],"views":1538,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/43003"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=43003"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/43003\/revisions"}],"predecessor-version":[{"id":43024,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/43003\/revisions\/43024"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/43004"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=43003"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=43003"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=43003"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}