{"id":42957,"date":"2015-08-15T21:21:36","date_gmt":"2015-08-15T18:21:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=42957"},"modified":"2015-08-15T21:21:36","modified_gmt":"2015-08-15T18:21:36","slug":"aksa-goynuk-santrali-acildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-goynuk-santrali-acildi\/","title":{"rendered":"(Turkish) Aksa G\u00f6yn\u00fck Santrali A\u00e7\u0131ld\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/42957\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Yerli k\u00f6m\u00fcrden y\u0131lda 2 milyar kWh elektrik \u00fcretmek \u00fczere kurulan Aksa G\u00f6yn\u00fck Enerji Termik Santrali a\u00e7\u0131ld\u0131.<\/strong><\/p>\n<p>Aksa Enerji taraf\u0131ndan 2012 y\u0131l\u0131nda temeli at\u0131lan ve yerli k\u00f6m\u00fcrden elektrik \u00fcretmek \u00fczere in\u015fa edilen Aksa G\u00f6yn\u00fck Enerji Termik Santrali\u2019nin a\u00e7\u0131l\u0131\u015f\u0131 Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z ile \u00c7evre ve \u015eehircilik Bakan\u0131 \u0130dris G\u00fcll\u00fcce\u2019nin de kat\u0131l\u0131m\u0131yla ger\u00e7ekle\u015ftirildi.<\/p>\n<p><strong>YILDA 2 M\u0130LYAR k<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/aksa-goynuk-santrali-acildi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-42958\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/aksa-goynuk-santrali-acildi-300x208.jpg\" alt=\"aksa-goynuk-santrali-acildi\" width=\"300\" height=\"208\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/aksa-goynuk-santrali-acildi-300x208.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/aksa-goynuk-santrali-acildi-500x346.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/aksa-goynuk-santrali-acildi-72x50.jpg 72w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/aksa-goynuk-santrali-acildi.jpg 699w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Wh ELEKTR\u0130K<\/strong><\/p>\n<p>T\u00fcrkiye\u2019nin \u00f6zel sekt\u00f6r taraf\u0131ndan yat\u0131r\u0131m\u0131 yap\u0131larak devreye al\u0131nan ve yerli k\u00f6m\u00fcr kullan\u0131lan iki santralinden biri olan Aksa G\u00f6yn\u00fck Enerji Termik Santrali\u2019ne 390 milyon dolarl\u0131k harcama yap\u0131ld\u0131. 270 megawatt (MW) kapasiteye sahip T\u00fcrkiye\u2019nin ilk r\u00f6dovansl\u0131 yat\u0131r\u0131m\u0131 olan santral,y\u0131lda 2 milyar kilowattsaatlik (kWh) \u00fcretim yapacak. Bu rakam, T\u00fcrkiye\u2019nin elektrik ihtiyac\u0131n\u0131n y\u00fczde 1\u2019ine kar\u015f\u0131l\u0131k geliyor.<\/p>\n<p><strong>YILDA 1.8 M\u0130LYON TON L\u0130NY\u0130T<\/strong><\/p>\n<p>T\u00fcrkiye`nin \u00f6nde gelen enerji oyuncular\u0131ndan Aksa, G\u00f6yn\u00fck Termik Santrali ile birlikte portf\u00f6y\u00fcne ilk kez linyiti de eklemi\u015f oldu. Santralde y\u0131lda 1 milyon 800 bin ton yerli k\u00f6m\u00fcr kullan\u0131lacak. Aksa G\u00f6yn\u00fck Enerji Termik Santrali,ayn\u0131 zamanda T\u00fcrkiye K\u00f6m\u00fcr \u0130\u015fletmeleri Kurumu\u2019nun(TK\u0130), linyit k\u00f6m\u00fcr\u00fc sahalar\u0131n\u0131 \u00f6zel sekt\u00f6re a\u00e7mas\u0131yla birlikte T\u00fcrkiye\u2019nin ilk r\u00f6dovansl\u0131 yat\u0131r\u0131m\u0131 olmas\u0131 nedeniyle de b\u00fcy\u00fck \u00f6nem ta\u015f\u0131yor.<\/p>\n<p><strong>DI\u015eA BA\u011eIMLILIK A\u015eA\u011eI \u0130ST\u0130HDAM YUKARI<\/strong><\/p>\n<p>Aksa Enerji Y\u00f6netim Kurulu Ba\u015fkan\u0131 Cemil Kazanc\u0131, santralin a\u00e7\u0131l\u0131\u015f\u0131yla ilgili yapt\u0131\u011f\u0131 de\u011ferlendirmede, &#8220;T\u00fcrkiye\u2019de bir ilk olarak r\u00f6dovans y\u00f6ntemiyle yerli linyitten \u00fcretece\u011fimiz elektrik, enerjide d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131m\u0131z\u0131 azaltarak ekonomiye \u00f6nemli \u00f6l\u00e7\u00fcde katk\u0131 sa\u011flayacak&#8221; dedi. Cemil Kazanc\u0131, G\u00f6yn\u00fck Termik Santrali`nin ba\u015fta b\u00f6lge halk\u0131 olmak \u00fczere do\u011frudan ve dolayl\u0131 olarak yakla\u015f\u0131k bin ki\u015fiye i\u015f imkan\u0131 sa\u011flayaca\u011f\u0131n\u0131 vurgulad\u0131.<\/p>\n<p><strong>AKSA, YEN\u0130LER\u0130N\u0130 DE YAPACAK<\/strong><\/p>\n<p>Cemil Kazanc\u0131, G\u00f6yn\u00fck`teki gibi linyite dayal\u0131 elektrik \u00fcretimi yat\u0131r\u0131mlar\u0131na devam edeceklerini de a\u00e7\u0131klad\u0131. Kazanc\u0131, Afrika\u2019da Gana Cumhuriyeti ile 370 MW\u2019l\u0131k enerji santrali kurulumu ve enerji \u00fcretimi i\u00e7in imzalad\u0131klar\u0131 yeni anla\u015fmayla, enerji ve altyap\u0131 yat\u0131r\u0131m\u0131 ihtiyac\u0131 bulunan Afrika \u00fclkelerine giri\u015f yaparak, \u015firketin karl\u0131l\u0131\u011f\u0131n\u0131 ve d\u00f6viz bazl\u0131 sat\u0131\u015flar\u0131n\u0131n hacmini art\u0131rmay\u0131 hedeflediklerini de vurgulad\u0131.<\/p>\n<p>Kaynak: B\u00fcltenleri<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Yerli k\u00f6m\u00fcrden y\u0131lda 2 milyar kWh elektrik \u00fcretmek \u00fczere kurulan Aksa G\u00f6yn\u00fck Enerji Termik Santrali a\u00e7\u0131ld\u0131. Aksa Enerji taraf\u0131ndan 2012 y\u0131l\u0131nda temeli at\u0131lan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":42958,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,24649],"tags":[1571,24953,24952,68,63,67,1009,2698,165,17221,227,35370,1677,69,99,15554],"views":1341,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42957"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=42957"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42957\/revisions"}],"predecessor-version":[{"id":42959,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42957\/revisions\/42959"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/42958"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=42957"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=42957"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=42957"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}