{"id":42445,"date":"2015-08-06T09:44:20","date_gmt":"2015-08-06T06:44:20","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=42445"},"modified":"2015-08-06T13:52:09","modified_gmt":"2015-08-06T10:52:09","slug":"hirvatlar-corumdaki-ruzgar-enerji-santraline-talip-oldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hirvatlar-corumdaki-ruzgar-enerji-santraline-talip-oldu\/","title":{"rendered":"(Turkish) H\u0131rvatlar \u00c7orum\u2019daki R\u00fczg\u00e2r Enerji Santrali\u2019ne Talip Oldu&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/42445\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #222222;\"><strong>\u00c7orum\u2019da R\u00fczgar Enerjisi Santrali i\u00e7in \u00e7al\u0131\u015fmalar t\u00fcm h\u0131z\u0131yla s\u00fcr\u00fcyor. H\u0131rvatistan\u2019dan gelen bir heyet R\u00fczg\u00e2r Enerji Santrali Projesi\u2019ni incelemek \u00fczere \u00c7orum\u2019a geldi.<\/strong><span id=\"more-73015\"><\/span><\/p>\n<p style=\"color: #222222;\">\u00c7orum Belediyesi\u2019nin en b\u00fcy\u00fck yat\u0131r\u0131mlar\u0131 aras\u0131nda yer alacak olan R\u00fczgar Enerjisi Santrali i\u00e7in \u00e7al\u0131\u015fmalar t\u00fcm h\u0131z\u0131yla s\u00fcr\u00fcyor.<img loading=\"lazy\" class=\"alignright  wp-image-42446\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/39-300x165.jpg\" alt=\",3\" width=\"312\" height=\"212\" \/><br \/>\n15 milyon euroya mal olacak proje ile birlikte \u00c7orum Belediyesi, y\u0131lda yakla\u015f\u0131k 14 milyon Kwh elektrik \u00fcretimi ger\u00e7ekle\u015ftirecek. R\u00fczg\u00e2r Enerji Santrali Projesi\u2019ni incelemek \u00fczere H\u0131rvatistan\u2019dan gelen bir heyet \u00c7orum Belediyesi\u2019ni ziyaret etti. Belediye Ba\u015fkan\u0131 Muzaffer K\u00fclc\u00fc ile bir araya gelen konuk heyet proje hakk\u0131nda kar\u015f\u0131l\u0131kl\u0131 g\u00f6r\u00fc\u015f al\u0131\u015fveri\u015finde bulundu.<br \/>\nEnerji alan\u0131nda b\u00f6yle bir projeyi hayata ge\u00e7irecek ilk belediyenin \u00c7orum Belediyesi olaca\u011f\u0131n\u0131 dile getiren Ba\u015fkan K\u00fclc\u00fc, R\u00fczgar Enerjisi Santrali Projesinin hem \u00c7orum Belediyesi hem de T\u00fcrkiye\u2019deki belediyeler a\u00e7\u0131s\u0131ndan farkl\u0131 bir tecr\u00fcbe olaca\u011f\u0131n\u0131n alt\u0131n\u0131 \u00e7izdi.<br \/>\nK\u00fclc\u00fc, \u201cBu projenin ekonomik taraf\u0131 oldu\u011fu gibi belediyeler a\u00e7\u0131s\u0131ndan birde prestij taraf\u0131 var. \u0130\u015fin bu k\u0131sm\u0131n\u0131 da \u00f6nemseyerek \u00e7al\u0131\u015fmalar\u0131m\u0131z\u0131 y\u00fcr\u00fct\u00fcyoruz. R\u00fczg\u00e2r Enerjisi Santrali Projesi\u2019nin ihalesini y\u0131l sonuna yapmay\u0131 planl\u0131yoruz. Bu projede beraber \u00e7al\u0131\u015faca\u011f\u0131m\u0131z partnerimiz sadece bir yat\u0131r\u0131m yapm\u0131\u015f olmayacak, bu anlamda T\u00fcrkiye\u2019de ciddi bir referansa da sahip olmu\u015f olacak.\u201d dedi.<br \/>\nD\u00fcnyadaki geli\u015fmeleri ve yenilikleri yak\u0131ndan takip ettiklerini vurgulayan Ba\u015fkan K\u00fclc\u00fc, belediyenin enerji ihtiyac\u0131n\u0131 bu santralden kar\u015f\u0131layacaklar\u0131n\u0131, ihtiya\u00e7 fazlas\u0131 enerjiyi de satarak belediyeye yeni bir gelir kayna\u011f\u0131 olu\u015fturacaklar\u0131n\u0131 a\u00e7\u0131klad\u0131.<br \/>\n\u00c7evreye ve do\u011faya duyarl\u0131 bir belediyecilik anlay\u0131\u015f\u0131 ile do\u011faya zarar vermeden, \u00e7evreyi kirletmeden elektrik \u00fcreteceklerini anlatan Ba\u015fkan K\u00fclc\u00fc, proje \u00e7al\u0131\u015fmalar\u0131n\u0131 en h\u0131zl\u0131 \u015fekilde tamamlay\u0131p bir an \u00f6nce elektrik \u00fcretimine ba\u015flamak istediklerini s\u00f6zlerine ekledi..<br \/>\nKoncar Firmas\u0131 Y\u00f6netim Kurulu \u00dcyesi Stjepan Dragicevicde, T\u00fcrkiye\u2019de daha \u00f6nce hidroelektrik santralleri \u00fczerine \u00e7al\u0131\u015fmalar yapt\u0131klar\u0131n\u0131 belirterek, \u201cT\u00fcrkiye\u2019de de R\u00fczgar Enerjisi sekt\u00f6r\u00fcnde de var olmak ve i\u015f yapmak istiyoruz. \u0130\u015f yapt\u0131\u011f\u0131m\u0131z \u00fclkelerde lokal bir partnerle \u00e7al\u0131\u015fmay\u0131 tercih ediyoruz. B\u00f6ylece yerel sanayiye de destek veriyoruz. Bu projede de \u00c7orum\u2019da i\u00e7inde imal edilecek olan par\u00e7alar\u0131 de\u011ferlendirece\u011fiz ve \u00e7al\u0131\u015faca\u011f\u0131z\u201d \u015feklinde konu\u015ftu.<\/p>\n<div class=\"entry\" style=\"color: #000000;\">\n<p>Kaynak: EnerjiEnstit\u00fcs\u00fc<\/p>\n<\/div>\n<div class=\"paylas\" style=\"color: #000000;\"><\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00c7orum\u2019da R\u00fczgar Enerjisi Santrali i\u00e7in \u00e7al\u0131\u015fmalar t\u00fcm h\u0131z\u0131yla s\u00fcr\u00fcyor. H\u0131rvatistan\u2019dan gelen bir heyet R\u00fczg\u00e2r Enerji Santrali Projesi\u2019ni incelemek \u00fczere \u00c7orum\u2019a geldi. \u00c7orum [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":42446,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[24013,24680,165,24681,233,16],"views":1274,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42445"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=42445"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42445\/revisions"}],"predecessor-version":[{"id":42457,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42445\/revisions\/42457"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/42446"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=42445"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=42445"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=42445"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}