{"id":42408,"date":"2015-08-05T19:42:29","date_gmt":"2015-08-05T16:42:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=42408"},"modified":"2015-08-05T19:42:29","modified_gmt":"2015-08-05T16:42:29","slug":"daglica-enerji-hakkaride-hes-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/daglica-enerji-hakkaride-hes-kuracak\/","title":{"rendered":"(Turkish) Da\u011fl\u0131ca Enerji Hakkari`de HES Kuracak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/42408\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Da\u011fl\u0131ca Enerji, Hakkari`de 15,14 MW kurulu g\u00fcc\u00fcnde \u00fc\u00e7 Hidroelektrik Santrali kurmay\u0131 planl\u0131yor.<\/strong><\/p>\n<p>Da\u011fl\u0131ca Enerji \u00dcretim ve Tic. Ltd. \u015eti. taraf\u0131ndan26 no\u2019lu Dicle Havzas\u0131`nda, Hakkari \u0130li merkez il\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisinde, il\u00e7enin g\u00fcneyinde ve Dicle Nehri\u2019nin \u00f6nemli kollar\u0131ndan biri olan Zap (\u00c7\u0131\u011fl\u0131) Suyuna mansaplanan Gehi, Bak ve K\u00f6yi\u00e7i dereleri \u00fczerinde \u201cOrta Z<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/daglica-enerji-hakkaride-hes-kuracak.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-42409\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/daglica-enerji-hakkaride-hes-kuracak-300x225.jpg\" alt=\"daglica-enerji-hakkaride-hes-kuracak\" width=\"293\" height=\"221\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/daglica-enerji-hakkaride-hes-kuracak-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/daglica-enerji-hakkaride-hes-kuracak-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/daglica-enerji-hakkaride-hes-kuracak-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/08\/daglica-enerji-hakkaride-hes-kuracak.jpg 640w\" sizes=\"(max-width: 293px) 100vw, 293px\" \/><\/a>ap HES Projesi\u201d i\u015fletilmesi planlan\u0131yor.<\/p>\n<p>66.947.969 TL bedelli proje, toplamda 4 adet reg\u00fclat\u00f6r ve 3 adet hidroelektrik santralinden (HES) olu\u015fuyor.Bunlar:<\/p>\n<p>A\u011fa\u00e7dibi Reg\u00fclat\u00f6r\u00fc ve HES (Toplam 4.44 MWm \/ 4.26 MWe kurulu g\u00fcc\u00fcnde 2 adet yatay eksenli Pelton t\u00fcrbin bar\u0131nd\u0131ran bir santral binas\u0131ndan meydana gelmekte)<br \/>\n\u00c7anakl\u0131 1 Reg\u00fclat\u00f6r\u00fc ve HES (Toplam 1.81 MWm \/ 1.74 MWe kurulu g\u00fcc\u00fcnde 2adet yatay eksenli Pelton t\u00fcrbin bar\u0131nd\u0131ran bir santral binas\u0131ndan meydanagelmekte)<br \/>\n\u00c7anakl\u0131 2 Reg\u00fclat\u00f6r\u00fc ve HES (Toplam 9.52 MWm \/ 9.14 MWe kurulu g\u00fcc\u00fcnde 2 adet yatay eksenli Pelton t\u00fcrbin bar\u0131nd\u0131ran bir santral binas\u0131ndan meydana gelmekte)<br \/>\nK\u00f6yi\u00e7i Reg\u00fclat\u00f6r\u00fc Yap\u0131l\u0131\u015f amac\u0131 toplad\u0131\u011f\u0131 K\u00f6yi\u00e7i Deresi sular\u0131n\u0131 \u00c7anakl\u0131 2 Reg\u00fclat\u00f6r\u00fc\u2019ne derive etmek.<\/p>\n<p>Projede \u00fcretilen y\u0131ll\u0131k toplam 53,75 GWh elektri\u011finenterkonnekte sisteme ba\u011flanmas\u0131 i\u00e7in proje kapsam\u0131nda bir Enerji Nakil Hatt\u0131 da yap\u0131lmas\u0131 planlan\u0131yor. Proje in\u015faat\u0131n\u0131n 2 y\u0131l s\u00fcrmesi planlan\u0131yor.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler Hakkari Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/daglica-enerji-hakkaride-hes-kuracak_14707.html#.VcJBWfPtmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Da\u011fl\u0131ca Enerji, Hakkari`de 15,14 MW kurulu g\u00fcc\u00fcnde \u00fc\u00e7 Hidroelektrik Santrali kurmay\u0131 planl\u0131yor. Da\u011fl\u0131ca Enerji \u00dcretim ve Tic. Ltd. \u015eti. taraf\u0131ndan26 no\u2019lu Dicle Havzas\u0131`nda, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":42409,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[5927,24669,19,63,67,1009,2698,165,7104,35370,1090,24670],"views":1675,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42408"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=42408"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42408\/revisions"}],"predecessor-version":[{"id":42410,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42408\/revisions\/42410"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/42409"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=42408"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=42408"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=42408"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}