{"id":42084,"date":"2015-07-31T17:14:17","date_gmt":"2015-07-31T14:14:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=42084"},"modified":"2015-07-31T17:16:40","modified_gmt":"2015-07-31T14:16:40","slug":"belcikadan-nukleere-devam-karari","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/belcikadan-nukleere-devam-karari\/","title":{"rendered":"(Turkish) Bel\u00e7ika\u2019dan \u2018N\u00fckleere Devam\u2019 Karar\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/42084\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #222222;\"><strong>Bel\u00e7ika, iki n\u00fckleer reakt\u00f6r\u00fcn\u00fc 10 y\u0131l daha faaliyette tutmaya karar verdi.<\/strong><\/p>\n<p style=\"color: #222222;\">GDF Suez \u015firketinin sahip oldu\u011fu elektrik \u00fcretim firmas\u0131 Electrabel, Bel\u00e7ika\u2019daki Doel 1 ve Doel <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/24.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-42085\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/24-300x165.jpg\" alt=\"A windmill is seen near the Doel's nuclear plant in northern Belgium\" width=\"340\" height=\"212\" \/><\/a>2 reakt\u00f6rlerinin h\u00fck\u00fcmetle yap\u0131lan anla\u015fmayla 10 y\u0131l daha devrede kalaca\u011f\u0131n\u0131 duyurdu.<span id=\"more-72964\"><\/span><\/p>\n<p style=\"color: #222222;\">40 y\u0131ll\u0131k \u00f6mr\u00fcn\u00fc tamamlad\u0131\u011f\u0131 i\u00e7in kapat\u0131lmas\u0131 \u00f6ng\u00f6r\u00fclen ve toplamda yakla\u015f\u0131k 1000 megavat \u00fcretim kapasiteli iki reakt\u00f6r 1974 ve 1975 y\u0131llar\u0131nda devreye al\u0131nm\u0131\u015ft\u0131.<\/p>\n<p style=\"color: #222222;\">Konuyla ilgili a\u00e7\u0131klama yapan Bel\u00e7ika Enerji Bakan\u0131 Christine Marghem, n\u00fckleer reakt\u00f6rlerin 10 y\u0131l daha \u00e7al\u0131\u015fmaya devam etmesinin \u00fclkenin elektrik arz g\u00fcvenli\u011fi i\u00e7in gerekli oldu\u011funu belirtti.<\/p>\n<p style=\"color: #222222;\">Bel\u00e7ika\u2019da \u00f6nceki h\u00fck\u00fcmet d\u00f6neminde n\u00fckleer santrallerin kapat\u0131laca\u011f\u0131 s\u00f6ylenmi\u015fti. Ge\u00e7en y\u0131l k\u0131\u015f aylar\u0131nda \u00fclkedeki 3 n\u00fckleer reakt\u00f6r\u00fcn bak\u0131m ve onar\u0131m i\u015flemleri nedeniyle devre d\u0131\u015f\u0131 kalmas\u0131, elektrik s\u0131k\u0131nt\u0131s\u0131 ya\u015fanabilece\u011fi endi\u015felerine neden olmu\u015ftu.<\/p>\n<p style=\"color: #222222;\">S\u00f6z konusu iki reakt\u00f6r\u00fcn \u00f6mr\u00fcn\u00fcn 10 y\u0131l uzat\u0131lmas\u0131yla birlikte bas\u0131n\u00e7 sistemindeki \u00e7atlaklar nedeniyle onar\u0131m \u00e7al\u0131\u015fmas\u0131n\u0131n devam etti\u011fi 2 bin megavat kapasiteli Doel 3 ve Tihangle 2 reakt\u00f6rlerinin ekim ay\u0131nda tekrar devreye al\u0131nmas\u0131 Bel\u00e7ika\u2019da elektrik arz fazlas\u0131n\u0131 sa\u011flam\u0131\u015f olacak.<\/p>\n<p style=\"color: #222222;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Bel\u00e7ika, iki n\u00fckleer reakt\u00f6r\u00fcn\u00fc 10 y\u0131l daha faaliyette tutmaya karar verdi. GDF Suez \u015firketinin sahip oldu\u011fu elektrik \u00fcretim firmas\u0131 Electrabel, Bel\u00e7ika\u2019daki Doel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":42085,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[6687,24513,24514,71,21,3020,1597,24515],"views":1029,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42084"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=42084"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42084\/revisions"}],"predecessor-version":[{"id":42089,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42084\/revisions\/42089"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/42085"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=42084"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=42084"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=42084"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}