{"id":42069,"date":"2015-07-31T14:17:28","date_gmt":"2015-07-31T11:17:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=42069"},"modified":"2015-07-31T14:21:28","modified_gmt":"2015-07-31T11:21:28","slug":"enel-dunyanin-ilk-biyokutle-ve-jeotermal-hibrid-santralini-kurdu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enel-dunyanin-ilk-biyokutle-ve-jeotermal-hibrid-santralini-kurdu\/","title":{"rendered":"(Turkish) Enel, D\u00fcnyan\u0131n \u0130lk Biyok\u00fctle ve Jeotermal Hibrid Santralini Kurdu&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/42069\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #666666;\"><span style=\"color: #000000;\"><strong>D\u00fcnyan\u0131n en b\u00fcy\u00fck enerji \u015firketlerinden olan ve \u00fclkemizde de enerji yat\u0131r\u0131mlar\u0131 bulunan \u0130talyan\u00a0Enel Green Power\u00a0\u015firketi, Toskana\u2019n\u0131n\u00a0Castelnuovo Val di Cecina b\u00f6lgesinde bulunan Cornia 2 tesisinde\u00a0d\u00fcnyan\u0131n ilk jeotermal ve biyok\u00fctle hibrid enerji sistemini kurdu.<\/strong><\/span><\/p>\n<p style=\"color: #666666;\">Projede, jeotermal buhar\u0131n \u0131s\u0131t\u0131lmas\u0131 i\u00e7in biyok\u00fctle enerjisinden yararlan\u0131l\u0131yor.<\/p>\n<p style=\"color: #666666;\">Sistemde, tesisin 70km \u00e7ap\u0131ndaki b\u00f6lgeden elde edilen\u00a0<strong style=\"font-weight: bold; color: #222222;\">ormansal biyok\u00fctle<\/strong>\u00a0(at\u0131k), yak\u0131t olarak kullan\u0131larak mevcut jeotermal santraldeki buhar<img loading=\"lazy\" class=\"alignleft  wp-image-42070\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/enel-300x181.jpg\" alt=\"-\" width=\"297\" height=\"212\" \/>\u0131n 150-160 derece civar\u0131nda olan ilk \u0131s\u0131s\u0131, 370-380 derece aras\u0131na y\u00fckseltiliyor. Bu sayede hem\u00a0<strong style=\"font-weight: bold; color: #222222;\">buhar\u0131n entalpisi<\/strong>\u00a0hem de\u00a0<strong style=\"font-weight: bold; color: #222222;\">d\u00f6ng\u00fcn\u00fcn\u00a0verimlili\u011fi<\/strong>\u00a0artt\u0131r\u0131lm\u0131\u015f oluyor.<\/p>\n<p style=\"color: #666666;\">\u201cFarkl\u0131 teknolojiler aras\u0131ndaki entegrasyon, temiz enerjilerin gelece\u011fi a\u00e7\u0131s\u0131ndan \u00e7ok \u00f6nemli bir ad\u0131md\u0131r\u201d diyen Enel Green Power CEO \u2018su\u00a0<strong style=\"font-weight: bold; color: #222222;\">Francesco Venturini,<\/strong>\u00a0\u201cBu tesis ABD\u2019deki solar termodinamik ve jeotermal teknolojiyi birle\u015ftiren\u00a0<strong style=\"font-weight: bold; color: #222222;\">Stillwater<\/strong>\u00a0tesisimiz, Brezilya\u2019daki<strong style=\"font-weight: bold; color: #222222;\">Fontes<\/strong>\u00a0r\u00fczgar-g\u00fcne\u015f hibrid santralimizde oldu\u011fu gibi sonu\u00e7lar\u0131n optimize edildi\u011fi bir tesistir\u201d a\u00e7\u0131klamas\u0131n\u0131 yapt\u0131.<\/p>\n<p style=\"color: #666666;\">15 milyon Euro yat\u0131r\u0131mla kurulan bu proje, \u00e7evreye s\u0131f\u0131r etkisi olmas\u0131, mevcut bir end\u00fcstriyel tesisi iyile\u015ftirmesi ve hem kayna\u011f\u0131n hem de d\u00f6ng\u00fcn\u00fcn yenilenebilir olmas\u0131n\u0131 sa\u011flamas\u0131 a\u00e7\u0131s\u0131ndan teknolojik olarak hayli yenilik\u00e7i olma \u00f6zelli\u011fi de ta\u015f\u0131yor. 5 MW kapasiteli bu ek biyok\u00fctle tesisi, jeotermal santralin toplam y\u0131ll\u0131k \u00fcretim kapasitesini 30 GW artt\u0131rmas\u0131 hedefleniyor. Bu da 13.000 ton CO2 emisyonunu engellemesi demek oluyor.<\/p>\n<p style=\"color: #666666;\"><strong style=\"font-weight: bold; color: #222222;\">Enel Green Power<\/strong>, Enel Gruba ba\u011fl\u0131, tamamen Avrupa, Amerika ve Afrika\u2019daki uluslararas\u0131 yenilenebilir enerji projelerine odaklanm\u0131\u015f bir \u015firkettir. 2014 y\u0131l\u0131nda g\u00fcne\u015f, hidro, r\u00fczgar ve jeotermal enerjilere yapt\u0131\u011f\u0131 yat\u0131r\u0131mlar sonucunda 32 milyar kWh toplam \u00fcretim kapasitesine sahip, \u00a09.800 MW kurulu g\u00fcc\u00fc, 15 \u00fclkede\u00a0faaliyet g\u00f6steren\u00a0740 santrali ile, konusunda sekt\u00f6r ortalamalar\u0131n\u0131n \u00e7ok \u00fcst\u00fcnde bir hacime sahip d\u00fcnya lideri bir \u015firket olmakla gurur duymaktad\u0131r.<\/p>\n<p style=\"color: #666666;\"><span style=\"color: #99cc00;\"><a style=\"color: #fc8d8d;\" href=\"https:\/\/www.enelgreenpower.com\/en-GB\/media_investor\/press_releases\/release.aspx?iddoc=1664165\" target=\"_blank\"><span style=\"color: #99cc00;\">Enel Green Power\u00a0<\/span><\/a><\/span>bas\u0131n b\u00fclteninden \u00e7evirilmi\u015f ve \u00f6zetlenmi\u015ftir.<\/p>\n<p style=\"color: #666666;\">Kaynak: Alternatif Enerji<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. D\u00fcnyan\u0131n en b\u00fcy\u00fck enerji \u015firketlerinden olan ve \u00fclkemizde de enerji yat\u0131r\u0131mlar\u0131 bulunan \u0130talyan\u00a0Enel Green Power\u00a0\u015firketi, Toskana\u2019n\u0131n\u00a0Castelnuovo Val di Cecina b\u00f6lgesinde bulunan Cornia [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":42071,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53,48],"tags":[1678,6053,24510,22242,63,67,1009,2698,165,58,56],"views":1605,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42069"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=42069"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42069\/revisions"}],"predecessor-version":[{"id":42077,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/42069\/revisions\/42077"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/42071"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=42069"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=42069"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=42069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}