{"id":41883,"date":"2015-07-27T19:14:17","date_gmt":"2015-07-27T16:14:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=41883"},"modified":"2015-07-27T19:14:17","modified_gmt":"2015-07-27T16:14:17","slug":"aksa-tuncelide-85-mwlik-hes-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-tuncelide-85-mwlik-hes-kuracak\/","title":{"rendered":"(Turkish) Aksa, Tunceli`de 85 MW`l\u0131k HES Kuracak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/41883\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Aksa Enerji, Tunceli`nin P\u00fcl\u00fcm\u00fcr il\u00e7esinde 85 MW`l\u0131k Sansa Reg\u00fclat\u00f6r\u00fc ve HES in\u015faa etmeyi planl\u0131yor.<\/strong><\/p>\n<p>Bedeli 530 806 307 TL olarak belirlenen projenin kurulu g\u00fcc\u00fc 85 MW, y\u0131ll\u0131k toplam elektrik \u00fcretimi ise 335<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/aksa-tuncelide-85-mwlik-hes-kuracak.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-41884\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/aksa-tuncelide-85-mwlik-hes-kuracak-300x225.jpg\" alt=\"aksa-tuncelide-85-mwlik-hes-kuracak\" width=\"300\" height=\"212\" \/><\/a>.774 GWh olacak.<\/p>\n<p>Tesislerin tamamlanma s\u00fcresinin (toplam in\u015faat s\u00fcresi) yakla\u015f\u0131k 3 y\u0131l, projenin \u00f6mr\u00fcn\u00fcn ise santral tamamland\u0131ktan sonra yakla\u015f\u0131k 50 y\u0131l olmas\u0131 planlan\u0131yor.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>Erzincan \u0130li Merkez \u0130l\u00e7esi ile Tunceli \u0130li, P\u00fcl\u00fcm\u00fcr \u0130l\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisinde Karasu Nehri \u00fczerinde Aksa Enerji \u00dcretim A.\u015e. taraf\u0131ndan yap\u0131lmas\u0131 planlanan \u201cSansa Reg\u00fclat\u00f6r\u00fc ve HES Revize Projesi\u201d projesi ile ilgili 02.01.2008 tarihinde \u201cCED Olumlu\u201d karar\u0131 verilmi\u015fti. Proje ile ilgili baz\u0131 de\u011fi\u015fikliklerle yeniden \u00c7ED Ba\u015fvuru Dosyas\u0131 haz\u0131rlan\u0131p Bakanl\u0131\u011fa sunuldu.<\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, revize projesi ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler Tunceli Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: B\u00fcltenler<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Aksa Enerji, Tunceli`nin P\u00fcl\u00fcm\u00fcr il\u00e7esinde 85 MW`l\u0131k Sansa Reg\u00fclat\u00f6r\u00fc ve HES in\u015faa etmeyi planl\u0131yor. Bedeli 530 806 307 TL olarak belirlenen projenin kurulu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41884,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1571,5927,19,63,67,1009,2698,165,35370,1090,24391,1171,24392,16449],"views":1855,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41883"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=41883"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41883\/revisions"}],"predecessor-version":[{"id":41885,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41883\/revisions\/41885"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41884"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=41883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=41883"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=41883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}