{"id":41497,"date":"2015-07-18T16:14:44","date_gmt":"2015-07-18T13:14:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=41497"},"modified":"2015-07-18T16:14:44","modified_gmt":"2015-07-18T13:14:44","slug":"kenyada-elektrige-esekli-cozum","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kenyada-elektrige-esekli-cozum\/","title":{"rendered":"(Turkish) Kenya`da Elektri\u011fe E\u015fekli \u00c7\u00f6z\u00fcm!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/41497\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kenya\u2019n\u0131n Magadi kasabas\u0131nda yakla\u015f\u0131k 200 kad\u0131n, e\u015feklerin \u00fczerine ast\u0131klar\u0131 g\u00fcne\u015f panelleriyle 2000 haneli kasaban\u0131n elektrik ihtiyac\u0131n\u0131 sa\u011fl\u0131yor.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/kenyada-elektrige-esekli-cozum.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-41498\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/kenyada-elektrige-esekli-cozum-300x197.jpg\" alt=\"kenyada-elektrige-esekli-cozum\" width=\"300\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/kenyada-elektrige-esekli-cozum-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/kenyada-elektrige-esekli-cozum-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/kenyada-elektrige-esekli-cozum.jpg 446w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Green Enerji Afrika\u2019n\u0131n yenilenebilir enerji projesi kapsam\u0131nda Masaili kad\u0131nlar ya\u015fad\u0131klar\u0131 Magadi kasabas\u0131n\u0131n elektrik ihtiyac\u0131n\u0131 e\u015feklere y\u00fckledikleri g\u00fcne\u015f panelleri ile sa\u011fl\u0131yorlar.<\/p>\n<p>G\u00fcney Afrika\u2019da yoksul bir kasaba olan Magadi`de halk, genellikle vah\u015fi hayvanlardan korunmak ve gece \u00e7ocuklar\u0131n\u0131n ders \u00e7al\u0131\u015fmas\u0131n\u0131 sa\u011flamak i\u00e7in, ormandan kestikleri odunlar\u0131 yakarak bu sorunu \u00e7\u00f6zmeye \u00e7al\u0131\u015f\u0131yorlard\u0131 ve telefonlar\u0131n\u0131 \u015farj edebilmek i\u00e7in dahi 10 km y\u00fcr\u00fcmek zorunda kal\u0131yorlard\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/kenyada-elektrige-esekli-cozum_14497.html#.VapVyqTtmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kenya\u2019n\u0131n Magadi kasabas\u0131nda yakla\u015f\u0131k 200 kad\u0131n, e\u015feklerin \u00fczerine ast\u0131klar\u0131 g\u00fcne\u015f panelleriyle 2000 haneli kasaban\u0131n elektrik ihtiyac\u0131n\u0131 sa\u011fl\u0131yor. Green Enerji Afrika\u2019n\u0131n yenilenebilir enerji projesi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41498,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[68,61,19,63,67,1009,2698,165,24157,227,142,108,11909,24156],"views":1130,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41497"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=41497"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41497\/revisions"}],"predecessor-version":[{"id":41499,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41497\/revisions\/41499"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41498"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=41497"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=41497"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=41497"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}