{"id":41481,"date":"2015-07-17T16:04:38","date_gmt":"2015-07-17T13:04:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=41481"},"modified":"2015-07-17T16:04:38","modified_gmt":"2015-07-17T13:04:38","slug":"karaburun-rese-uretim-lisansi-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/karaburun-rese-uretim-lisansi-verildi\/","title":{"rendered":"(Turkish) Karaburun RES`e \u00dcretim Lisans\u0131 Verildi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/41481\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>EPDK, \u0130zmir`in Karaburun il\u00e7esinde bulunan Karaburun RES i\u00e7in 42 y\u0131ll\u0131k \u00fcretim lisans\u0131 verdi. Enerji Piyasas\u0131 D\u00fczenleme Kurulu (EPDK)`n\u0131n konu ile ilgili ilan\u0131 Resmi Gazete`de yay\u0131mland\u0131.<\/strong><\/p>\n<p>Buna g\u00f6re, EPDK, iki g\u00fcn \u00f6nce y\u00f6re halk\u0131n\u0131n yo\u011fun protestolar\u0131 nedeniyle halk toplant\u0131s\u0131 yap\u0131lamayan K<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/karaburun-rese-uretim-lisansi-verildi.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-41482 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/karaburun-rese-uretim-lisansi-verildi-300x225.jpg\" alt=\"karaburun-rese-uretim-lisansi-verildi\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/karaburun-rese-uretim-lisansi-verildi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/karaburun-rese-uretim-lisansi-verildi-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/karaburun-rese-uretim-lisansi-verildi.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>araburun R\u00fczgar Enerji Santrali i\u00e7in Lodos Karaburun Elektrik \u00dcretim Anonim \u015eirketi`neeskisinin devam\u0131 mahiyetinde 41 (k\u0131rkbir) y\u0131l 11 (onbir) ay 18 (onsekiz) g\u00fcn s\u00fcreli \u00fcretim lisans\u0131 verdi. Lisans 11 Haziran 2015 tarihli kurul karar\u0131 ile verildi.<\/p>\n<p><strong>PROJEYE \u00c7EVREC\u0130LER VE K\u00d6YL\u00dcLER TEPK\u0130 G\u00d6STERD\u0130<\/strong><\/p>\n<p>Karaburun \u0130l\u00e7esi\u2019nde, 166 t\u00fcrbin direkli RES (r\u00fczgar enerjisi santrali) projesine ba\u015flayan Lodos \u015firketi 47 t\u00fcrbini dikip, elektrik \u00fcretimine ge\u00e7ti. Ancak gerek Yayla K\u00f6y\u00fc sakinlerinin gerekse \u00e7evrecilerin davalar\u0131 sonras\u0131nda mahkeme, firman\u0131n proje lisans\u0131n\u0131 iptal etti, 47 t\u00fcrbinin de \u00e7al\u0131\u015fmas\u0131n\u0131n durdurulmas\u0131na karar verdi.<\/p>\n<p>\u0130n\u015faat\u0131 tamamlanan t\u00fcrbinlerden elektrik \u00fcretimine mahkeme karar\u0131na ra\u011fmen EPDK\u2019dan al\u0131nan izinle yeniden ba\u015flayan firma, projenin kalan b\u00f6l\u00fcm\u00fcn\u00fc tamamlayabilmek i\u00e7in, yeniden giri\u015fimlerde bulundu. Bunun \u00fczerine \u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019nden gelen g\u00f6revliler ile firma yetkilileri, iki g\u00fcn \u00f6nce Yayla K\u00f6y\u00fc\u2019nde, halk kat\u0131l\u0131m toplant\u0131s\u0131 d\u00fczenlemek istemi\u015f, ancak \u00e7evreciler ve k\u00f6yl\u00fcler toplant\u0131y\u0131 protestoyla \u00f6nlemi\u015fti.<\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.EPDK, \u0130zmir`in Karaburun il\u00e7esinde bulunan Karaburun RES i\u00e7in 42 y\u0131ll\u0131k \u00fcretim lisans\u0131 verdi. Enerji Piyasas\u0131 D\u00fczenleme Kurulu (EPDK)`n\u0131n konu ile ilgili ilan\u0131 Resmi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41482,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[68,63,67,1009,749,165,750,2689,24152,474,22653,69,16,231,22631,6660],"views":1248,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41481"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=41481"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41481\/revisions"}],"predecessor-version":[{"id":41483,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41481\/revisions\/41483"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41482"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=41481"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=41481"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=41481"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}