{"id":41460,"date":"2015-07-17T15:30:42","date_gmt":"2015-07-17T12:30:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=41460"},"modified":"2015-07-17T15:30:42","modified_gmt":"2015-07-17T12:30:42","slug":"teror-gap-yatirimlarini-geciktiriyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teror-gap-yatirimlarini-geciktiriyor\/","title":{"rendered":"(Turkish) Ter\u00f6r, GAP Yat\u0131r\u0131mlar\u0131n\u0131 Geciktiriyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/41460\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #222222;\"><strong>G\u00fcneydo\u011fu Anadolu B\u00f6lgesi\u2019nde GAP kapsam\u0131ndaki baraj ve hidroelektrik santrallerinin (HES) b\u00fcy\u00fck k\u0131sm\u0131 i\u015fletmeye a\u00e7\u0131ld\u0131, baz\u0131 barajlar\u0131n in\u015fas\u0131n\u0131n ise ter\u00f6r \u00f6rg\u00fct\u00fc PKK\u2019n\u0131n sald\u0131r\u0131lar\u0131 nedeniyle gecikece\u011fi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/strong><span id=\"more-72704\"><\/span><\/p>\n<p style=\"color: #222222;\">D\u00fcnyan\u0131n say\u0131l\u0131 b\u00f6lgesel kalk\u0131nma projelerinden GAP\u2019\u0131n tamamlanmas\u0131 i\u00e7in kamu yat\u0131r\u0131mlar\u0131ndan ayr\u0131lan pay son y\u0131llarda art\u0131r\u0131l\u0131rken, 2008\u2019de uygulanmaya ba\u015flanan GAP Eylem Plan\u0131 ile b\u00f6lgenin ekonomik ve sosyal g\u00f6stergel<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/teror-gap-yatirimlarini-geciktiriyor.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-41461\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/teror-gap-yatirimlarini-geciktiriyor-300x165.jpg\" alt=\"teror-gap-yatirimlarini-geciktiriyor\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/teror-gap-yatirimlarini-geciktiriyor-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/teror-gap-yatirimlarini-geciktiriyor-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/teror-gap-yatirimlarini-geciktiriyor-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/teror-gap-yatirimlarini-geciktiriyor.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>erinde k\u0131sa s\u00fcrede \u00f6nemli iyile\u015fmeler sa\u011fland\u0131.<\/p>\n<p style=\"color: #222222;\">GAP kapsam\u0131nda 22 baraj ve 19 HES ile sulama \u015febekelerinin yap\u0131m\u0131 planlan\u0131rken, bug\u00fcne kadar 19 baraj\u0131n\u00a0in\u015fas\u0131 tamamland\u0131.<br \/>\n2014 itibar\u0131yla 13 HES i\u015fletmeye al\u0131nd\u0131. Enerji yat\u0131r\u0131mlar\u0131nda y\u00fczde 74\u2019l\u00fck fiziki ger\u00e7ekle\u015fme kaydedildi. Y\u0131lda 27 milyar kilovat saat enerji \u00fcretimi planland\u0131, faaliyete giren HES\u2019lerle 20,6 milyar kilovat saat elektrik \u00fcretim kapasitesi olu\u015fturuldu.<br \/>\nAralar\u0131nda Karakaya, Atat\u00fcrk, Dicle, Kralk\u0131z\u0131 ve Birecik\u2019in de yer ald\u0131\u011f\u0131 barajlar\u0131n i\u015fletmeye al\u0131n\u0131\u015f\u0131ndan ge\u00e7en y\u0131l sonuna kadar 24,2 milyar dolar tutar\u0131nda 403,5 milyar kilovat saat enerji \u00fcretildi.<\/p>\n<p>Dicle Nehri \u00fczerinde yap\u0131m\u0131na ba\u015flanan Silvan ve Il\u0131su barajlar\u0131n\u0131n ise ter\u00f6r \u00f6rg\u00fct\u00fc PKK\u2019n\u0131n ger\u00e7ekle\u015ftirdi\u011fi sald\u0131r\u0131lar nedeniyle zaman\u0131nda tamamlanamayaca\u011f\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<br \/>\nSulama alan\u0131 a\u00e7\u0131s\u0131ndan Atat\u00fcrk Baraj\u0131\u2019n\u0131n ard\u0131ndan T\u00fcrkiye\u2019nin en b\u00fcy\u00fck ikinci baraj\u0131 olacak Silvan Baraj\u0131 ile enerji \u00fcretimi bak\u0131m\u0131ndan \u00fclkenin d\u00f6rd\u00fcnc\u00fcs\u00fc haline gelecek Il\u0131su Baraj\u0131\u2019n\u0131n yap\u0131m\u0131n\u0131 engellemeye \u00e7al\u0131\u015fan \u00f6rg\u00fct mensuplar\u0131, bunun i\u00e7in s\u0131k s\u0131k sald\u0131r\u0131 d\u00fczenliyor. Sald\u0131r\u0131lar nedeniyle in\u015faat \u00e7al\u0131\u015fmalar\u0131nda ya\u015fanan aksamalar, projelerin zaman\u0131nda tamamlanmas\u0131n\u0131 engelliyor.<br \/>\nDaha \u00f6nce Silvan Baraj\u0131\u2019n\u0131n bu y\u0131l, Il\u0131su Baraj\u0131\u2019n\u0131n ise 2017\u2019de i\u015fletmeye a\u00e7\u0131lmas\u0131 hedeflenirken, sald\u0131r\u0131lar nedeniyle her iki baraj\u0131n da tamamlanmas\u0131n\u0131n gecikmesi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>Il\u0131su Baraj\u0131\u2019nda 4 milyar 120 milyon kilovat saat, Silvan Baraj\u0131\u2019nda da 681 milyon kilovat saat olmak \u00fczere y\u0131lda 4 milyar 801 kilovat saat ve yakla\u015f\u0131k 1 milyar 200 milyon lira tutar\u0131nda enerji \u00fcretecek iki baraj\u0131n tamamlanmas\u0131 halinde Diyarbak\u0131r ve \u015e\u0131rnak\u2019ta 3 milyon 700 bin d\u00f6n\u00fcm arazi suyla bulu\u015fturulacak.<br \/>\nDiyarbak\u0131r\u2019da 2,5 milyon d\u00f6n\u00fcm araziyi suyla bulu\u015fturacak Silvan Projesi, 200 bin ki\u015fiye i\u015f sa\u011flayacak. Il\u0131su Baraj\u0131\u2019n\u0131n tamamlanmas\u0131yla da \u015e\u0131rnak\u2019\u0131n Cizre il\u00e7esinde Cizre Baraj\u0131 ve HES Projesi yap\u0131labilir hale gelecek.<br \/>\nCizre-\u0130dil ovalar\u0131ndaki 1 milyon 200 bin d\u00f6n\u00fcm tar\u0131msal arazi modern \u015fartlarda sulanacak ve bu sayede 156 bin ki\u015fi i\u015f bulmu\u015f olacak.<br \/>\nDicle Nehri \u00fczerinde yap\u0131m\u0131 s\u00fcren Silvan ve Il\u0131su barajlar\u0131na y\u00f6nelik sald\u0131rlar, i\u015fsizli\u011fin yo\u011fun oldu\u011fu Diyarbak\u0131r ve \u015e\u0131rnak\u2019ta 356 bin ki\u015finin istihdam\u0131n\u0131 engelliyor.<\/p>\n<p>Ter\u00f6ristler olu\u015facak baraj g\u00f6llerinin ge\u00e7i\u015f g\u00fczergahlar\u0131 ile kulland\u0131klar\u0131 ma\u011faralar\u0131 su alt\u0131nda b\u0131rakmas\u0131ndan korktuklar\u0131 i\u00e7in baraj in\u015faatlar\u0131n\u0131 sabote etmeye \u00e7al\u0131\u015f\u0131yor. Bug\u00fcne kadar ger\u00e7ekle\u015ftirdikleri onlarca sald\u0131r\u0131yla i\u015f\u00e7i ve m\u00fchendisleri ka\u00e7\u0131r\u0131p, i\u015f makinelerini yakan ter\u00f6ristler, baraj yollar\u0131na yerle\u015ftirdikleri patlay\u0131c\u0131lar\u0131 infilak ettirerek, malzeme ve personel ta\u015f\u0131nmas\u0131n\u0131 engellemeye \u00e7al\u0131\u015f\u0131yor.<\/p>\n<p>Ter\u00f6r \u00f6rg\u00fct\u00fc PKK mensuplar\u0131, DS\u0130\u2019nin in\u015fa etti\u011fi barajlar\u0131n yan\u0131 s\u0131ra b\u00f6lgede \u00f6zel sekt\u00f6r taraf\u0131ndan yap\u0131lan barajlara da engel oluyor.<br \/>\nSiirt\u2019in \u015eirvan il\u00e7esindeki Kezer \u00c7ay\u0131 \u00fczerinde \u00f6zel sekt\u00f6r taraf\u0131ndan yap\u0131m\u0131na ba\u015flanan \u015eirvan Baraj\u0131 ve HES\u2019te son 2 y\u0131lda yap\u0131lan sald\u0131r\u0131lar ve firma sahibinin evine d\u00fczenlenen bombal\u0131 sald\u0131r\u0131 nedeniyle \u00e7al\u0131\u015fmalar durduruldu.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00fcneydo\u011fu Anadolu B\u00f6lgesi\u2019nde GAP kapsam\u0131ndaki baraj ve hidroelektrik santrallerinin (HES) b\u00fcy\u00fck k\u0131sm\u0131 i\u015fletmeye a\u00e7\u0131ld\u0131, baz\u0131 barajlar\u0131n in\u015fas\u0131n\u0131n ise ter\u00f6r \u00f6rg\u00fct\u00fc PKK\u2019n\u0131n sald\u0131r\u0131lar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41461,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1990,13018,63,67,1009,2698,165,532,1214,24137,35370,4724,16455,24138],"views":1109,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41460"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=41460"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41460\/revisions"}],"predecessor-version":[{"id":41462,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41460\/revisions\/41462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41461"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=41460"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=41460"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=41460"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}