{"id":41433,"date":"2015-07-16T13:57:23","date_gmt":"2015-07-16T10:57:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=41433"},"modified":"2015-07-16T13:57:23","modified_gmt":"2015-07-16T10:57:23","slug":"hindistanin-gunes-elektrigi-gucu-4-gwi-asti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hindistanin-gunes-elektrigi-gucu-4-gwi-asti\/","title":{"rendered":"(Turkish) Hindistan&#8217;\u0131n G\u00fcne\u015f Elektri\u011fi G\u00fcc\u00fc 4 GW\u2019\u0131 A\u015ft\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/41433\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Hindistan\u2019\u0131n g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcn\u00fcn 4 GW\u2019\u0131 a\u015ft\u0131\u011f\u0131 bildirildi.<\/strong><\/p>\n<p>Hindistan Yeni ve Yenilenebilir Enerji Bakanl\u0131\u011f\u0131 taraf\u0131ndan yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamaya g\u00f6re \u00fclkede devrede olan g\u00fcne\u015f elektri\u011fi sistemlerinin toplam g\u00fcc\u00fc May\u0131s ay\u0131 sonu itibari ile 4.010,6 MW\u2019a ula\u015ft\u0131.<\/p>\n<p>Bakanl\u0131k taraf\u0131ndan a\u00e7\u0131klanan<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/hindistanin-gunes-elektrigi-gucu-4-gwi-asti.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-41434\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/hindistanin-gunes-elektrigi-gucu-4-gwi-asti-300x163.jpg\" alt=\"hindistanin-gunes-elektrigi-gucu-4-gwi-asti\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/hindistanin-gunes-elektrigi-gucu-4-gwi-asti-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/hindistanin-gunes-elektrigi-gucu-4-gwi-asti-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/hindistanin-gunes-elektrigi-gucu-4-gwi-asti.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> verilere g\u00f6re bu g\u00fcc\u00fcn 1.353,5 MW\u2019l\u0131k b\u00f6l\u00fcm\u00fcn\u00fc do\u011frudan bakanl\u0131k taraf\u0131ndan geli\u015ftirilen projeler olu\u015ftururken, 2.056,4 MW\u2019l\u0131k b\u00f6l\u00fcm\u00fc ise federal te\u015fvik sisteminden yararlanarak devreye giren yat\u0131r\u0131mlardan olu\u015fmakta. 600,7 MW g\u00fcc\u00fcndeki yat\u0131r\u0131m ise \u00fclkenin Yenilenebilir Enerji Sertifikas\u0131 Program\u0131 ile hayata ge\u00e7irilmi\u015f durumda.<\/p>\n<p>A\u00e7\u0131klaman\u0131n detaylar\u0131na g\u00f6re \u00fclkenin Racestan eyaleti 1.163,7 MW, Gujarat eyaleti ise 1.000,05 MW\u2019l\u0131k kurulu g\u00fcne\u015f elektri\u011fi g\u00fcc\u00fcne ula\u015farak \u00fclkenin bu alandaki en y\u00fcksek kapasitesine sahip \u00fclkeleri oldu.<\/p>\n<p>\u00dclkede faaliyet g\u00f6steren Bridge to India adl\u0131 dan\u0131\u015fmanl\u0131k \u015firketine g\u00f6re Hindistan 2019 y\u0131l\u0131nda, 27 GW\u2019l\u0131k b\u00f6l\u00fcm\u00fc b\u00fcy\u00fck \u00f6l\u00e7ekli 4 GW\u2019l\u0131k b\u00f6l\u00fcm\u00fc de \u00e7at\u0131 \u00fcst\u00fc sistemlerden olu\u015fmak \u00fczere 31 GW\u2019l\u0131k g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcne ula\u015fabilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/yesilekonomi.com\/yenilenebilir-enerji\/hindistan-gunes-elektrigi-gucu-4-gwi-asti\" target=\"_blank\" rel=\"nofollow\">Ye\u015fil Ekonomi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Hindistan\u2019\u0131n g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcn\u00fcn 4 GW\u2019\u0131 a\u015ft\u0131\u011f\u0131 bildirildi. Hindistan Yeni ve Yenilenebilir Enerji Bakanl\u0131\u011f\u0131 taraf\u0131ndan yap\u0131lan yaz\u0131l\u0131 a\u00e7\u0131klamaya g\u00f6re \u00fclkede devrede olan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41434,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[63,67,1009,2698,165,2326,227,1169,13,2569,4034],"views":1001,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41433"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=41433"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41433\/revisions"}],"predecessor-version":[{"id":41435,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41433\/revisions\/41435"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41434"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=41433"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=41433"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=41433"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}