{"id":41406,"date":"2015-07-16T00:37:10","date_gmt":"2015-07-15T21:37:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=41406"},"modified":"2015-07-16T00:37:10","modified_gmt":"2015-07-15T21:37:10","slug":"balres-elektrik-denizlide-10-mwlik-ges-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/balres-elektrik-denizlide-10-mwlik-ges-kuracak\/","title":{"rendered":"(Turkish) Balres Elektrik Denizli`de 10 MW`l\u0131k GES Kuracak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/41406\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Balres Elektrik, Denizli`nin Pamukkale il\u00e7esinde 9,9 MW`l\u0131k G\u00fcne\u015f Enerjisi Santrali kuracak.<\/strong><\/p>\n<p>Balres Elektrik \u00dcretim A.\u015e. ta<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/balres-elektrik-denizlide-10-mwlik-ges-kuracak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-41407\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/balres-elektrik-denizlide-10-mwlik-ges-kuracak-300x184.jpg\" alt=\"balres-elektrik-denizlide-10-mwlik-ges-kuracak\" width=\"300\" height=\"184\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/balres-elektrik-denizlide-10-mwlik-ges-kuracak-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/balres-elektrik-denizlide-10-mwlik-ges-kuracak-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/balres-elektrik-denizlide-10-mwlik-ges-kuracak.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>raf\u0131ndan Denizli \u0130li, Pamukkale \u0130l\u00e7esi, Kocadere Mah., Eskidombadan Mevkiinde, toplam 157709,34 m2\u2019lik alanda 9,9 MW`l\u0131k G\u00fcne\u015f Enerjisi Santrali kurulacak.<\/p>\n<p>Sahada kurulacak 4000 adet d\u00fcz y\u00fczeyli ve sabit g\u00fcne\u015f panelinden \u00fcretilecek elektrik izin alan\u0131 kuzeyinden ge\u00e7en ana \u015febekeye verilecek.<\/p>\n<p>Proje maliyeti 27.800.000,00 TL olan santral tesiste \u00fcretilecek elektrik do\u011frudan \u015febekeye verilece\u011finden acil durumlar i\u00e7in gerekli pil (ak\u00fc) h\u00fccreleri kurulmayacak.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED S\u00dcREC\u0130 BA\u015eLADI<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili \u00c7evresel Etki De\u011ferlendirmesi s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 duyuruldu. \u00c7ED S\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler Denizli Valili\u011fi`ne (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/balres-elektrik-denizlide-10-mwlik-ges-kuracak_14500.html#.VabW_KTtmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Balres Elektrik, Denizli`nin Pamukkale il\u00e7esinde 9,9 MW`l\u0131k G\u00fcne\u015f Enerjisi Santrali kuracak. Balres Elektrik \u00dcretim A.\u015e. taraf\u0131ndan Denizli \u0130li, Pamukkale \u0130l\u00e7esi, Kocadere Mah., Eskidombadan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41407,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[24111,5927,845,63,67,1009,2698,165,2326,227,13,2569],"views":1523,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41406"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=41406"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41406\/revisions"}],"predecessor-version":[{"id":41408,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41406\/revisions\/41408"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41407"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=41406"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=41406"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=41406"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}