{"id":41286,"date":"2015-07-13T03:31:39","date_gmt":"2015-07-13T00:31:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=41286"},"modified":"2015-07-13T03:31:39","modified_gmt":"2015-07-13T00:31:39","slug":"tasdemir-gunes-enerjisine-hizli-bir-giris-yaptik","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tasdemir-gunes-enerjisine-hizli-bir-giris-yaptik\/","title":{"rendered":"(Turkish) Ta\u015fdemir: G\u00fcne\u015f Enerjisine H\u0131zl\u0131 Bir Giri\u015f Yapt\u0131k&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/41286\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>TEDA\u015e Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Mustafa Ta\u015fdemir, \u015fu ana kadar \u00fc\u00e7 bine yak\u0131n g\u00fcne\u015f projesi ba\u015fvurusu yap\u0131ld\u0131\u011f\u0131n\u0131 belirterek g\u00fcne\u015f enerjisine h\u0131zl\u0131 bir giri\u015f yap\u0131ld\u0131\u011f\u0131n\u0131 s\u00f6yledi.<\/strong><\/p>\n<p>Uluslararas\u0131 G\u00fcne\u015f Enerjisi Toplulu\u011fu \u2013 T\u00fcrkiye B\u00f6l\u00fcm\u00fc (G\u00dcNDER) taraf\u0131ndan organize edilen ve ilk kez ger\u00e7ekle\u015ftirilen TEDA\u015e ile g\u00fcne\u015f enerjisi firma tem<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/tasdemir-gunes-enerjisine-hizli-bir-giris-yaptik.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-41287\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/tasdemir-gunes-enerjisine-hizli-bir-giris-yaptik-300x144.jpg\" alt=\"tasdemir-gunes-enerjisine-hizli-bir-giris-yaptik\" width=\"300\" height=\"144\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/tasdemir-gunes-enerjisine-hizli-bir-giris-yaptik-300x144.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/tasdemir-gunes-enerjisine-hizli-bir-giris-yaptik-500x241.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/tasdemir-gunes-enerjisine-hizli-bir-giris-yaptik-80x38.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/tasdemir-gunes-enerjisine-hizli-bir-giris-yaptik.jpg 564w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>silcilerinin bulu\u015ftu\u011fu Proje Koordinasyon Toplant\u0131s\u0131nda konu\u015fan T\u00fcrkiye Elektrik Da\u011f\u0131t\u0131m Anonim \u015eirketi (TEDA\u015e) Y\u00f6netim Kurulu \u00dcyesi ve Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Mustafa Ta\u015fdemir, g\u00fcne\u015f enerjisi proje say\u0131s\u0131n\u0131n her ge\u00e7en g\u00fcn art\u0131\u015f g\u00f6sterdi\u011fini belirterek, \u201c\u015eu ana kadar g\u00fcne\u015f enerjisinden elektrik \u00fcretimi i\u00e7in yakla\u015f\u0131k 3 bin proje ba\u015fvurusu oldu ve 211 g\u00fcne\u015f santrali devreye girdi, bu say\u0131 g\u00fcne\u015f enerjisine h\u0131zl\u0131 bir giri\u015f yapt\u0131\u011f\u0131m\u0131z\u0131n g\u00f6stergesidir\u201d dedi.<\/p>\n<p>G\u00fcne\u015fin T\u00fcrkiye enerji \u00fcretiminde 2 y\u0131ll\u0131k bir ge\u00e7mi\u015fi oldu\u011funu belirten Ta\u015fdemir, &#8221; \u0130ngiltere ve Almanya\u2019daki d\u00fczenleyici kurumlar mevzuatlar\u0131n\u0131 5 ile 7 y\u0131lda olu\u015fturdu. T\u00fcrkiye ise 2 y\u0131ldan bu yana sorunlar\u0131 g\u00f6zlemleyip \u00e7\u00f6z\u00fcm \u00f6nerisi sunmaya gayret ediyor\u201d dedi.<\/p>\n<p><strong>G\u00dcNE\u015e YATIRIMLARINDA ENGELLER KALKACAK<\/strong><\/p>\n<p>Ta\u015fdemir, T\u00fcrkiye\u2019de yat\u0131r\u0131mc\u0131n\u0131n kar\u015f\u0131s\u0131na s\u00fcrekli engeller \u00e7\u0131kt\u0131\u011f\u0131n\u0131 belirterek, engellerin kald\u0131r\u0131lmas\u0131 i\u00e7in bu toplant\u0131n\u0131n ilk kez yap\u0131ld\u0131\u011f\u0131n\u0131 ve b\u00f6ylelikle g\u00fcne\u015f enerjisi yat\u0131r\u0131mc\u0131lar\u0131n\u0131n sorunlar\u0131n\u0131 dinleyip ona g\u00f6re \u00e7\u00f6z\u00fcm \u00f6nerileri \u00fczerinde \u00e7al\u0131\u015facaklar\u0131n\u0131 s\u00f6yledi. TEDA\u015e\u2019ta 850 projenin de\u011ferlendirildi\u011fini belirten Ta\u015fdemir, bunun h\u0131zla ger\u00e7ekle\u015fmesi i\u00e7in ilgili birimlerin hafta sonu da \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Toplant\u0131da yat\u0131r\u0131mc\u0131lar\u0131n\u0131n sorunlar\u0131, proje teknik de\u011ferlendirme,proje onay s\u00fcresinin uzunlu\u011fu, proje tadilat s\u00fcrecinde ya\u015fanan sorunlar, projelerin onay bedelleri ve maliyet sorunlar\u0131 olmak \u00fczere d\u00f6rt ba\u015fl\u0131k alt\u0131nda topland\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/tasdemir-gunes-enerjisine-hizli-bir-giris-yaptik_14422.html#.VaMLRF_tmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.TEDA\u015e Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Mustafa Ta\u015fdemir, \u015fu ana kadar \u00fc\u00e7 bine yak\u0131n g\u00fcne\u015f projesi ba\u015fvurusu yap\u0131ld\u0131\u011f\u0131n\u0131 belirterek g\u00fcne\u015f enerjisine h\u0131zl\u0131 bir giri\u015f yap\u0131ld\u0131\u011f\u0131n\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41287,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,2698,165,1382,227,13,6907,24034,17300,24035,1216],"views":1272,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41286"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=41286"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41286\/revisions"}],"predecessor-version":[{"id":41288,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41286\/revisions\/41288"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41287"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=41286"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=41286"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=41286"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}