{"id":41232,"date":"2015-07-11T19:26:14","date_gmt":"2015-07-11T16:26:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=41232"},"modified":"2015-07-11T19:26:14","modified_gmt":"2015-07-11T16:26:14","slug":"2-yilda-10-milyonluk-elektrik-uretti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2-yilda-10-milyonluk-elektrik-uretti\/","title":{"rendered":"(Turkish) 2 Y\u0131lda 10 Milyonluk Elektrik \u00dcretti!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/41232\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #363636;\"><strong>Yakla\u015f\u0131k 2 y\u0131ld\u0131r faaliyette olan Sakarya B\u00fcy\u00fck\u015fehir Belediyesi Hidroelektrik Santralinde 56 milyon kilovat elektrik \u00fcretildi.<\/strong><\/p>\n<p style=\"color: #363636;\">Sakarya B\u00fcy\u00fck\u015fehir Belediye Ba\u015fkan\u0131 Zeki To\u00e7o\u011flu, yerel y\u00f6netimler taraf\u0131ndan in\u015fa edilen ilk hidroelektrik santrali olan ADASU HES\u2019te elektrik \u00fcretiminin devam etti\u011fini belirtti<img loading=\"lazy\" class=\"alignleft  wp-image-41234\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/2-yilda-10-milyonluk-elektrik-uretti.jpg\" alt=\"2-yilda-10-milyonluk-elektrik-uretti\" width=\"300\" height=\"209\" \/>. Yakla\u015f\u0131k iki y\u0131ld\u0131r faaliyette olan tesislerde 56 milyon kilovat enerji \u00fcretildi\u011fini belirten To\u00e7o\u011flu, \u201cT\u00fcrkiye\u2019ye \u00f6rnek olan nehir tipi hidroelektrik santralimiz yakla\u015f\u0131k 2 y\u0131ld\u0131r \u015fehrimiz i\u00e7in enerji \u00fcretmeye devam ediyor. Bu s\u00fcre\u00e7te santralimizde 56 milyon kilovat elektrik \u00fcretimi ger\u00e7ekle\u015fti. Bu \u00fcretimin toplan de\u011feri 10 milyon. ADASU HES ile \u015fehrimiz iki y\u0131lda 10 milyon kazand\u0131\u201d diye konu\u015ftu.<\/p>\n<p style=\"color: #363636;\">Yakla\u015f\u0131k iki y\u0131ld\u0131r ADASU HES ile d\u00fc\u015fen enerji maliyetlerinin yat\u0131r\u0131mlara aktar\u0131ld\u0131\u011f\u0131n\u0131 da a\u00e7\u0131klamalar\u0131na ekleyen To\u00e7o\u011flu, \u201c\u015eehrimiz b\u00fcy\u00fck bir enerji t\u00fcketicisiyken hamdolsun enerji \u00fcretimi konusunda da \u00f6nemli bir mesafe kat etti. Hayata ge\u00e7irdi\u011fimiz yat\u0131r\u0131mla art\u0131k enerji \u00fcreten bir Sakarya var. Enerji maliyetinde ger\u00e7ekle\u015ftirdi\u011fimiz tasarrufu yat\u0131r\u0131mlar\u0131m\u0131za aktar\u0131yoruz. Tamamen \u00e7evreci ADASU HES ile Sakarya kazan\u0131yor\u201d ifadelerini kulland\u0131.<\/p>\n<p style=\"color: #363636;\">Kaynak: \u0130HA<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Yakla\u015f\u0131k 2 y\u0131ld\u0131r faaliyette olan Sakarya B\u00fcy\u00fck\u015fehir Belediyesi Hidroelektrik Santralinde 56 milyon kilovat elektrik \u00fcretildi. Sakarya B\u00fcy\u00fck\u015fehir Belediye Ba\u015fkan\u0131 Zeki To\u00e7o\u011flu, yerel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41234,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[24015,24016,68,19,63,67,1009,2698,165,35370,70,1090],"views":804,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41232"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=41232"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41232\/revisions"}],"predecessor-version":[{"id":41235,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41232\/revisions\/41235"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41234"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=41232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=41232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=41232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}