{"id":41181,"date":"2015-07-09T16:22:51","date_gmt":"2015-07-09T13:22:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=41181"},"modified":"2015-07-09T16:22:51","modified_gmt":"2015-07-09T13:22:51","slug":"borusan-enbw-enerjiden-2-bin-megavatlik-yenilenebilir-enerji-hedefi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/borusan-enbw-enerjiden-2-bin-megavatlik-yenilenebilir-enerji-hedefi\/","title":{"rendered":"(Turkish) Borusan EnBw Enerjiden 2 Bin Megavatl\u0131k Yenilenebilir Enerji Hedefi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/41181\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #222222;\"><strong>Borusan Holding \u00dcst Y\u00f6neticisi (CEO) Agah U\u011fur, \u201c2020 y\u0131l\u0131nda 2 bin megavatl\u0131k yenilenebilir enerji portf\u00f6y hedefimizi korumaktay\u0131z ve bu hedefe ula\u015fabilmek i\u00e7in yakla\u015f\u0131k 4 milyar dolar d\u00fczeyinde bir yat\u0131r\u0131m\u0131 ad\u0131m ad\u0131m yapmaktay\u0131z\u201d dedi.<\/strong><span id=\"more-72581\"><\/span><\/p>\n<p style=\"color: #222222;\">Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z\u2019\u0131n kat\u0131l\u0131m\u0131yla, Borusan EnBW Enerji\u2019nin Koru R\u00fczgar Enerji Santrali (RES) ile Mut RES yat\u0131r\u0131mlar\u0131n\u0131 devreye almas\u0131, Band\u0131rma RES\u2019in ise kapasite art\u0131\u015f\u0131n\u0131 tamamlamas\u0131 nedeniyle d\u00fczenlenen bas\u0131n toplant\u0131s\u0131nda konu\u015fan U\u011fur, Borusan EnBW Enerji\u2019nin ana misyonunun T\u00fcrkiye\u2019nin s\u00fcrd\u00fcr\u00fclebilir kalk\u0131<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/borusan-enbw-enerjiden-2-bin-megavatlik-yenilenebilir-enerji-hedefi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-41182\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/borusan-enbw-enerjiden-2-bin-megavatlik-yenilenebilir-enerji-hedefi-300x165.jpg\" alt=\"borusan-enbw-enerjiden-2-bin-megavatlik-yenilenebilir-enerji-hedefi\" width=\"300\" height=\"165\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/borusan-enbw-enerjiden-2-bin-megavatlik-yenilenebilir-enerji-hedefi-300x165.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/borusan-enbw-enerjiden-2-bin-megavatlik-yenilenebilir-enerji-hedefi-500x276.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/borusan-enbw-enerjiden-2-bin-megavatlik-yenilenebilir-enerji-hedefi-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/borusan-enbw-enerjiden-2-bin-megavatlik-yenilenebilir-enerji-hedefi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>nmas\u0131na katk\u0131da bulunacak yenilenebilir enerji santrallerinin ekonomiye kazand\u0131r\u0131lmas\u0131 oldu\u011funu s\u00f6yledi.<\/p>\n<p>Enerji portf\u00f6ylerinin tamam\u0131n\u0131n yenilenebilir enerji kaynaklar\u0131na dayal\u0131 santral ve projelerden olu\u015ftu\u011funu aktaran U\u011fur, \u201cHalen bu portf\u00f6y\u00fcm\u00fcz\u00fcn y\u00fczde 60\u2019\u0131n\u0131 470 megavat g\u00fcc\u00fcnde r\u00fczgar enerjisi projeleri, y\u00fczde 40\u2019\u0131n\u0131 ise 295 megavat g\u00fcc\u00fcnde hidroelektrik santrali projeleri olu\u015fturmaktad\u0131r. 2020 y\u0131l\u0131nda 2 bin megavatl\u0131k yenilenebilir enerji portf\u00f6y hedefimizi korumaktay\u0131z ve bu hedefe ula\u015fabilmek i\u00e7in yakla\u015f\u0131k 4 milyar dolar d\u00fczeyinde bir yat\u0131r\u0131m\u0131 ad\u0131m ad\u0131m yapmaktay\u0131z\u201d \u015feklinde konu\u015ftu.<\/p>\n<p>\u00c7ok iyi projeleri oldu\u011funu bildiren U\u011fur, \u201cUmar\u0131m politik ortam bu ihalelerin gecikmesine sebep olmaz. \u00c7\u00fcnk\u00fc T\u00fcrkiye\u2019nin, bu ihalelerin bir an \u00f6nce yap\u0131l\u0131p, tesislerin bir an \u00f6nce hayata ge\u00e7irilmesine ihtiyac\u0131 var\u201d ifadelerini kulland\u0131.<\/p>\n<p>G\u00fcne\u015f ihaleleri i\u00e7in de haz\u0131rland\u0131klar\u0131n\u0131 anlatan U\u011fur, bu alan yeni bir segment oldu\u011fu i\u00e7in rasyonel yat\u0131r\u0131mc\u0131lara ihtiya\u00e7 oldu\u011funu, bu rasyonellik konusunda da T\u00fcrkiye\u2019nin risk ta\u015f\u0131yaca\u011f\u0131n\u0131 tahmin ettiklerini dile getirdi.<\/p>\n<p>Borusan EnBW Enerji Genel M\u00fcd\u00fcr\u00fc Mehmet Acarla da ge\u00e7en sene ba\u015flatt\u0131klar\u0131 r\u00fczgar paketi projelerinden olu\u015fan yat\u0131r\u0131m hamlesinin hayata ge\u00e7irilmesinde sona yakla\u015ft\u0131klar\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Acarla, \u201cHarmanl\u0131k RES, Koru RES, Mut RES ve Fuatres RES\u2019in yap\u0131m\u0131n\u0131 ve Band\u0131rma RES\u2019te ise kapasite art\u0131r\u0131m\u0131n\u0131 hedefleyen, toplam maliyeti yakla\u015f\u0131k 330 milyon dolar olan, devam eden yat\u0131r\u0131mlar\u0131m\u0131z\u0131n t\u00fcm\u00fc tamamland\u0131\u011f\u0131nda Borusan EnBW Enerji\u2019nin toplam r\u00fczgar enerjisi kurulu g\u00fcc\u00fc 332 megavata ula\u015facak\u201d dedi.<\/p>\n<p>Her biri 53 megavat g\u00fcc\u00fcnde olan Koru RES (\u00c7anakkale) ve Mut RES (Mersin\/Karaman) ile faaliyetteki Band\u0131rma RES\u2019in 30 megavat kapasite art\u0131\u015f\u0131 hizmete girdi.<\/p>\n<p>B\u00f6ylelikle Borusan EnBW Enerji\u2019nin toplam r\u00fczgar enerjisi kurulu g\u00fcc\u00fc 246 megavata ula\u015fm\u0131\u015f oldu.<\/p>\n<p>Kaynak: B\u00fcltenler<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Borusan Holding \u00dcst Y\u00f6neticisi (CEO) Agah U\u011fur, \u201c2020 y\u0131l\u0131nda 2 bin megavatl\u0131k yenilenebilir enerji portf\u00f6y hedefimizi korumaktay\u0131z ve bu hedefe ula\u015fabilmek i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41182,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[16602,14225,23967,63,67,1009,2698,165,10057,6679,23947,23968,23966,474,231,105,23969],"views":1069,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41181"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=41181"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41181\/revisions"}],"predecessor-version":[{"id":41183,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41181\/revisions\/41183"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41182"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=41181"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=41181"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=41181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}