{"id":41103,"date":"2015-07-07T14:02:07","date_gmt":"2015-07-07T11:02:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=41103"},"modified":"2015-07-07T14:02:07","modified_gmt":"2015-07-07T11:02:07","slug":"turkiyenin-jeotermal-enerji-gucu-guris-holding-ile-artiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyenin-jeotermal-enerji-gucu-guris-holding-ile-artiyor\/","title":{"rendered":"(Turkish) T\u00fcrkiye&#8217;nin Jeotermal Enerji G\u00fcc\u00fc G\u00fcri\u015f&#8217;in Efeler JES&#8217;i \u0130le Art\u0131yor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/41103\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcri\u015f Holding`in Ayd\u0131n`da bulunan Efeler JES`in d\u00f6rd\u00fcnc\u00fc faz\u0131nda \u00fcretime ba\u015fland\u0131.<\/strong><\/p>\n<p>G\u00fcri\u015f grubu taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada, Ayd\u0131n\u2019\u0131n Germencik il\u00e7esinde yer alan 232.3 MW ile T\u00fcrkiye`nin en b\u00fcy\u00fck Jeotermal Santrali`nin 4.\u00fcnitesi olan 22.5 MW\u2019lik EFE 4 Santrali`nin kab\u00fcl\u00fc yap\u0131larak elektrik \u00fcretimine ba\u015fland\u0131\u011f\u0131 <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/turkiyenin-jeotermal-enerji-gucu-guris-ile-artiyor.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-41104\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/turkiyenin-jeotermal-enerji-gucu-guris-ile-artiyor-300x169.jpg\" alt=\"turkiyenin-jeotermal-enerji-gucu-guris-ile-artiyor\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/turkiyenin-jeotermal-enerji-gucu-guris-ile-artiyor-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/turkiyenin-jeotermal-enerji-gucu-guris-ile-artiyor-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/turkiyenin-jeotermal-enerji-gucu-guris-ile-artiyor.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>belirtildi. G\u00fcri\u015f Holding`in jeotermalde toplam kurulu g\u00fcc\u00fc b\u00f6ylece 115 MW oldu.<\/p>\n<p>1,92 milyar kws\/y\u0131l elektrik \u00fcretmesi planlanan 232.3 MW EFELER JES\u2019in 4. \u00dcnitesi olan EFE 4 Santrali y\u0131lda yakla\u015f\u0131k 219 milyon kilovatsaat elektrik \u00fcretecek.<\/p>\n<p>A\u011fustos ay\u0131nda devreye girecek Efeler 5 ile santral toplam 232,3 MW\u2019l\u0131k enerji \u00fcretecek. Toplam 232,3 megawatt (MW) kapasitesiyle T\u00fcrkiye\u2019nin jeotermal enerji \u00fcretiminin y\u00fczde 25\u2019ini tek ba\u015f\u0131na sa\u011flayacak. T\u00fcrkiye\u2019nin jeotermal lideri olan santral, Avrupa\u2019n\u0131n da ikinci b\u00fcy\u00fck santrali oldu. JES, y\u0131lda 1 milyar 920 milyon KWS elektrik \u00fcreterek, 825 bin konut ve i\u015fyerinin bir y\u0131ll\u0131k elektrik ve \u0131s\u0131nma ihtiyac\u0131n\u0131 kar\u015f\u0131layacak.<\/p>\n<p>T\u00fcrkiye`nin jeotermalde kurulu g\u00fcc\u00fc toplam 450 MW`a ula\u015ft\u0131.<\/p>\n<p>Kaynak: B\u00fcltenler<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcri\u015f Holding`in Ayd\u0131n`da bulunan Efeler JES`in d\u00f6rd\u00fcnc\u00fc faz\u0131nda \u00fcretime ba\u015fland\u0131. G\u00fcri\u015f grubu taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada, Ayd\u0131n\u2019\u0131n Germencik il\u00e7esinde yer alan 232.3 MW ile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41104,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[23912,18991,63,67,1009,2698,165,3513,6320,56,10686,6322,1854],"views":1492,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41103"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=41103"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41103\/revisions"}],"predecessor-version":[{"id":41105,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41103\/revisions\/41105"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41104"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=41103"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=41103"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=41103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}