{"id":41005,"date":"2015-07-05T17:00:40","date_gmt":"2015-07-05T14:00:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=41005"},"modified":"2015-07-05T17:04:51","modified_gmt":"2015-07-05T14:04:51","slug":"gamesa-ve-sunedisondan-ruzgar-ortakligi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gamesa-ve-sunedisondan-ruzgar-ortakligi\/","title":{"rendered":"(Turkish) Gamesa ve SunEdison`dan R\u00fczgar Ortakl\u0131\u011f\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/41005\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><span style=\"color: #000000;\">Gamesa ve SunEdison, \u00fc\u00e7 y\u0131l i\u00e7inde Hindistan ve Meksika`da 1 GW b\u00fcy\u00fckl\u00fc\u011f\u00fcnde r\u00fczgar enerjisi santralleri kuracak.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/gamesa-ve-sunedisondan-ruzgar-ortakligi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-41006\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/gamesa-ve-sunedisondan-ruzgar-ortakligi-300x179.jpg\" alt=\"gamesa-ve-sunedisondan-ruzgar-ortakligi\" width=\"300\" height=\"179\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/gamesa-ve-sunedisondan-ruzgar-ortakligi-300x179.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/gamesa-ve-sunedisondan-ruzgar-ortakligi-500x298.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/gamesa-ve-sunedisondan-ruzgar-ortakligi-80x47.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/gamesa-ve-sunedisondan-ruzgar-ortakligi.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/span><\/strong><\/p>\n<p>\u0130spanyol r\u00fczgar t\u00fcrbini \u00fcreticisi Gamesa ve Amerikan yenilenebilir enerji \u015firketi SunEdison, e\u015fit payl\u0131 ortakl\u0131k kuracaklar\u0131n\u0131 ve kurulacak ortakl\u0131\u011f\u0131n Hindistan ve Meksika`da yat\u0131r\u0131m yapma odakl\u0131 olaca\u011f\u0131n\u0131 bildirdiler.<\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, kurulacak ortakl\u0131k i\u00e7in bir mutabakat zapt\u0131 imzaland\u0131. Ortakl\u0131k, 2018 y\u0131l\u0131na kadar Hindistan ve Meksika`da 1 GW`ye kadar r\u00fczgar enerjisi kurulumu yapacak. Kurulacak r\u00fczgar santrallerinin in\u015faa ve finansman k\u0131sm\u0131n\u0131 SunEdison \u00fcstlenecek. Gamesa ise t\u00fcrbini \u00fcretecek ve i\u015fletme ile bak\u0131m\u0131n\u0131 s\u00fcrd\u00fcrecek.<br \/>\nKaynak: <a href=\"http:\/\/enerjigunlugu.net\/gamesa-ve-sunedisondan-ruzgar-ortakligi_14334.html#.VZk9Hxvtmkp\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Gamesa ve SunEdison, \u00fc\u00e7 y\u0131l i\u00e7inde Hindistan ve Meksika`da 1 GW b\u00fcy\u00fckl\u00fc\u011f\u00fcnde r\u00fczgar enerjisi santralleri kuracak. \u0130spanyol r\u00fczgar t\u00fcrbini \u00fcreticisi Gamesa ve Amerikan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":41006,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[1768,63,67,1009,2698,165,7767,4034,6541,11280,832,474,69,16,231,18414],"views":1072,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41005"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=41005"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41005\/revisions"}],"predecessor-version":[{"id":41011,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/41005\/revisions\/41011"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/41006"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=41005"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=41005"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=41005"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}