{"id":40896,"date":"2015-07-02T14:44:22","date_gmt":"2015-07-02T11:44:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40896"},"modified":"2015-07-02T14:44:22","modified_gmt":"2015-07-02T11:44:22","slug":"elektrik-kesintileri-4-ayda-224-bin-saati-asti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektrik-kesintileri-4-ayda-224-bin-saati-asti\/","title":{"rendered":"(Turkish) Elektrik Kesintileri 4 Ayda 224 Bin Saati A\u015ft\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40896\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Elektrik Kesinti Endeksi\u2019ne g\u00f6re Mart-Haziran d\u00f6neminde ya\u015fanan elektirik kesintilerinin s\u00fcresi 224 bin 182 saat uzunlu\u011funu a\u015ft\u0131.<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/elektrik-kesintileri-4-ayda-224-bin-saati-asti.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-40897\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/elektrik-kesintileri-4-ayda-224-bin-saati-asti-300x155.jpg\" alt=\"elektrik-kesintileri-4-ayda-224-bin-saati-asti\" width=\"300\" height=\"155\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/elektrik-kesintileri-4-ayda-224-bin-saati-asti-300x155.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/elektrik-kesintileri-4-ayda-224-bin-saati-asti-500x259.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/elektrik-kesintileri-4-ayda-224-bin-saati-asti-80x41.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/07\/elektrik-kesintileri-4-ayda-224-bin-saati-asti.jpg 622w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>T\u00fcketici Birli\u011fi Federasyonu Elektrik Kesinti Endeksi (EKE) verilerine g\u00f6re, Haziran ay\u0131nda elektrik kesintileri, Mart d\u00f6nemine g\u00f6re y\u00fczde 12.72 ve Nisan d\u00f6nemine g\u00f6re y\u00fczde 402 artarken, May\u0131s d\u00f6nemine g\u00f6re y\u00fczde 11.33 azald\u0131.<span id=\"more-72427\"><\/span><\/p>\n<p>EKE\u2019nin olu\u015fturulmaya ba\u015fland\u0131\u011f\u0131 Mart\u2019tan bu yana, d\u00f6rt ayl\u0131k d\u00f6nemde toplam olarak 224 bin saat elektrik kesintisi ger\u00e7ekle\u015fti.<\/p>\n<p>Haziran d\u00f6nemine ili\u015fkin Elektrik Kesinti Endeksi (EKE)\u2019ni a\u00e7\u0131klayan T\u00fcketici Birli\u011fi Federasyonu Elektrik Kesinti Endeksi (EKE) \u00c7al\u0131\u015fma Grubu Ba\u015fkan\u0131 Jale Yan\u0131lmaz, \u201cKamuoyu kesintilerin ger\u00e7ek nedenini merak ediyor\u201d dedi.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Elektrik Kesinti Endeksi\u2019ne g\u00f6re Mart-Haziran d\u00f6neminde ya\u015fanan elektirik kesintilerinin s\u00fcresi 224 bin 182 saat uzunlu\u011funu a\u015ft\u0131. T\u00fcketici Birli\u011fi Federasyonu Elektrik Kesinti Endeksi (EKE) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40897,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[23813,68,61,23814,11276,140,63,67,1009,2698,165,23815,21176],"views":548,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40896"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40896"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40896\/revisions"}],"predecessor-version":[{"id":40898,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40896\/revisions\/40898"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40897"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40896"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40896"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}