{"id":40842,"date":"2015-06-30T15:23:24","date_gmt":"2015-06-30T12:23:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40842"},"modified":"2015-06-30T15:23:24","modified_gmt":"2015-06-30T12:23:24","slug":"turkiyenin-en-buyuk-jeotermal-santrali-icin-200-milyon-dolar-destek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyenin-en-buyuk-jeotermal-santrali-icin-200-milyon-dolar-destek\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin En B\u00fcy\u00fck Jeotermal Santrali \u0130\u00e7in 200 Milyon Dolar Destek&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40842\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #222222;\"><strong>Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131 (EBRD), T\u00fcrkiye\u2019nin en b\u00fcy\u00fck jeotermal santrali i\u00e7in uzun vadeli finansal katk\u0131da bulunaca\u011f\u0131n\u0131 bildirerek, Efeler santraline 200 milyon dolar tutar\u0131nda kredi sa\u011flayaca\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.<\/strong><span id=\"more-72402\"><\/span><\/p>\n<p style=\"color: #222222;\">G\u00fcri\u015f Holding\u2019in i\u015ftiraklerinden birisi olan Gurmat Elektrik \u00dcretim A\u015e taraf\u0131ndan in\u015fa edilen Efeler Jeotermal Santrali\u2019nin 2015 y\u0131l\u0131 sonunda tamamlanmas\u0131 bekleniyor. Santralin in\u015faat\u0131n\u0131n bitmesiyle 170 megavat (MW) kurulum kapasitesiyle d\u00fcnyan\u0131n en b\u00fcy\u00fck on jeotermal santralinden birisi olacak.<\/p>\n<p style=\"color: #222222;\">A\u00e7\u0131klamada, santralin <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiyenin-en-buyuk-jeotermal-santrali-icin-200-milyon-dolar-destek.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-40843\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiyenin-en-buyuk-jeotermal-santrali-icin-200-milyon-dolar-destek-300x168.jpg\" alt=\"turkiyenin-en-buyuk-jeotermal-santrali-icin-200-milyon-dolar-destek\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiyenin-en-buyuk-jeotermal-santrali-icin-200-milyon-dolar-destek-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiyenin-en-buyuk-jeotermal-santrali-icin-200-milyon-dolar-destek-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiyenin-en-buyuk-jeotermal-santrali-icin-200-milyon-dolar-destek-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/turkiyenin-en-buyuk-jeotermal-santrali-icin-200-milyon-dolar-destek.jpg 860w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>T\u00fcrkiye\u2019deki kurulu jeotermal kapasitesini yakla\u015f\u0131k y\u00fczde 30 artt\u0131rarak, T\u00fcrkiye\u2019nin 2023 yenilenebilir enerji hedeflerine ula\u015f\u0131lmas\u0131na \u00f6nemli bir katk\u0131 sa\u011flayaca\u011f\u0131 belirtildi.<\/p>\n<p style=\"color: #222222;\">EBRD\u2019de enerji sekt\u00f6r\u00fc direkt\u00f6r\u00fc olan Nandita Parshad konuyla ilgili yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, \u201cY\u00fcksek verimlili\u011fi yenilenebilir enerji ile bir araya getiren jeotermal enerji ayn\u0131 zamanda baz y\u00fck talebinin kar\u015f\u0131lanmas\u0131nda da \u00f6nemli bir rol oynayabilir. T\u00fcrkiye\u2019nin 4 gigavat (GW) olan jeotermal potansiyelinin t\u00fcm\u00fcn\u00fc hayata ge\u00e7irmesi, 12-15 GW olan r\u00fczgar veya g\u00fcne\u015f enerjisi ilavesine e\u015fit bir etki olu\u015fturacakt\u0131r\u201d diye konu\u015ftu.<\/p>\n<p style=\"color: #222222;\">G\u00fcri\u015f Holding CEO\u2019su M\u00fc\u015ffik Hami Yamant\u00fcrk ise s\u00f6z konusu destek sayesinde Efeler Jeotermal Santralinin t\u00fcm \u00fcnitelerinin bu y\u0131l\u0131n sonuna kadar i\u015fler hale gelece\u011fini, G\u00fcri\u015f Holding\u2019in toplam yenilenebilir enerji kapasitesini 435 MW\u2019\u0131n \u00fczerine ta\u015f\u0131yaca\u011f\u0131n\u0131 belirtti.<\/p>\n<p style=\"color: #222222;\">\u015eirket, 2018 y\u0131l\u0131 sonuna kadar in\u015faat\u0131 devam eden projeleri tamamlayarak 1150 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcnde yenilenebilir enerji portf\u00f6y\u00fcne ula\u015fmay\u0131 hedefliyor.<\/p>\n<p style=\"color: #222222;\">Efeler projesinde yer alan di\u011fer bankalar ve kredi miktarlar\u0131 ise T\u00fcrkiye \u0130\u015f Bankas\u0131\u2019ndan 325 milyon ABD dolar\u0131, T\u00fcrkiye S\u0131nai Kalk\u0131nma Bankas\u0131\u2019ndan 130 milyon ABD dolar\u0131, Karadeniz Ticaret ve Kalk\u0131nma Bankas\u0131\u2019ndan 65 milyon ABD dolar\u0131 olarak a\u00e7\u0131kland\u0131.<\/p>\n<p style=\"color: #222222;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131 (EBRD), T\u00fcrkiye\u2019nin en b\u00fcy\u00fck jeotermal santrali i\u00e7in uzun vadeli finansal katk\u0131da bulunaca\u011f\u0131n\u0131 bildirerek, Efeler santraline 200 milyon [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40843,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[1258,1259,22986,63,67,1009,165,6320,20809,58,56,6322,22987,105],"views":1176,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40842"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40842"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40842\/revisions"}],"predecessor-version":[{"id":40844,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40842\/revisions\/40844"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40843"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}