{"id":40821,"date":"2015-06-29T15:07:05","date_gmt":"2015-06-29T12:07:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40821"},"modified":"2015-06-29T15:08:42","modified_gmt":"2015-06-29T12:08:42","slug":"berak-enerjiden-manisaya-dorduncu-ges-gunes-enerjisi-santrali-kurulumu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/berak-enerjiden-manisaya-dorduncu-ges-gunes-enerjisi-santrali-kurulumu\/","title":{"rendered":"(Turkish) Berak Enerji`den Manisa`ya D\u00f6rd\u00fcnc\u00fc G\u00fcne\u015f Enerjisi Santrali Kurulumu!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40821\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Berak Enerji, Manisa`da 10 MW kurulu g\u00fcc\u00fcnde d\u00f6rd\u00fcnc\u00fc G\u00fcne\u015f Enerjisi Santralini kuracak.<\/strong><\/p>\n<p>Daha \u00f6nce Manisa`da 2 MW,3 MW ve 4 MW`l\u0131k GES projelerini duyuran Berak Enerji \u015fimdi de 10 MW`l\u0131<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/berak-enerjiden-manisaya-dorduncu-ges.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-40822\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/berak-enerjiden-manisaya-dorduncu-ges-300x199.jpg\" alt=\"berak-enerjiden-manisaya-dorduncu-ges\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/berak-enerjiden-manisaya-dorduncu-ges-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/berak-enerjiden-manisaya-dorduncu-ges-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/berak-enerjiden-manisaya-dorduncu-ges.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>k GES projesini hayata ge\u00e7irmeye haz\u0131rlan\u0131yor. Berak Enerji San. Ve Tic. A.\u015e., Manisa ili, G\u00f6lmarmara \u0130l\u00e7esi, Ozanca K\u00f6y\u00fc, Dazk\u0131r Mevkii, tapunun 15 pafta, 283 nolu parselde bulunan toplam 208.950 m2`lik arazi \u00fczerinde toplam g\u00fcc\u00fc 9,9 MWe olan elektrik \u00fcretim tesisi kuracak.<\/p>\n<p>Toplam g\u00fcc\u00fc 9,9 MW olacak olan santralde y\u0131l\u0131k 17.400.000 kWh elektrik \u00fcretilmesi planlan\u0131yor.<\/p>\n<p>Bedeli 9.691.300 TL olarak belirlenen projede toplam 38.460 adet fotovoltaik panel ve 10 adet evirici (invert\u00f6r) ve 10 adet trafo k\u00f6\u015fk\u00fc kullan\u0131lacak.<\/p>\n<p><strong>PROJE \u0130LE \u0130LG\u0130L\u0130 \u00c7ED GEREKL\u0130 G\u00d6R\u00dcLMED\u0130<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili olarak Manisa Valili\u011fi`nin &#8220;\u00c7evresel Etki De\u011ferlendirmesi Gerekli De\u011fildir&#8221; karar\u0131 verdi\u011fi bildirildi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/berak-enerjiden-manisaya-dorduncu-ges_14281.html#.VZE5WRvtmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Berak Enerji, Manisa`da 10 MW kurulu g\u00fcc\u00fcnde d\u00f6rd\u00fcnc\u00fc G\u00fcne\u015f Enerjisi Santralini kuracak. Daha \u00f6nce Manisa`da 2 MW,3 MW ve 4 MW`l\u0131k GES projelerini [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40822,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[23774,23775,63,67,1009,2698,165,2326,21886,227,13,2569,21768,2191],"views":2037,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40821"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40821"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40821\/revisions"}],"predecessor-version":[{"id":40824,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40821\/revisions\/40824"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40822"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40821"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40821"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}