{"id":40785,"date":"2015-06-28T20:07:39","date_gmt":"2015-06-28T17:07:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40785"},"modified":"2015-06-28T20:07:39","modified_gmt":"2015-06-28T17:07:39","slug":"vestas-abdden-150-mwlik-turbin-siparisi-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/vestas-abdden-150-mwlik-turbin-siparisi-aldi\/","title":{"rendered":"(Turkish) Vestas, ABD`den 150 MW`l\u0131k T\u00fcrbin Sipari\u015fi Ald\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40785\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Vestas, ABD`nin Teksas Eyaleti`nde kurulacak r\u00fczgar \u00e7iftli\u011fi i\u00e7in EDF Renewable Energy \u015firketine 150 MW`l\u0131k t\u00fcrbin sa\u011flayacak.<img loading=\"lazy\" class=\"alignright size-medium wp-image-40786\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/vestas-abdden-150-mwlik-turbin-siparisi-aldi-300x184.jpg\" alt=\"vestas-abdden-150-mwlik-turbin-siparisi-aldi\" width=\"300\" height=\"184\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/vestas-abdden-150-mwlik-turbin-siparisi-aldi-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/vestas-abdden-150-mwlik-turbin-siparisi-aldi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/vestas-abdden-150-mwlik-turbin-siparisi-aldi.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Danimarka merkezli r\u00fczgar t\u00fcrbinleri \u00fcreticisi Vestas bir a\u00e7\u0131klama yaparak, ABD`nin Teksas Eyaleti`nde kurulmas\u0131 planlanan Salt Fork r\u00fczgar projesi i\u00e7in EDF Renewable Energy \u015firketi ile tedarik anla\u015fmas\u0131 imzalad\u0131\u011f\u0131n\u0131 duyurdu.<\/p>\n<p>Anla\u015fmaya g\u00f6re Vestas,EDF Renewable Energy taraf\u0131ndan planlanan santral i\u00e7in 75 adet V100-2.0 MW t\u00fcrbin sa\u011flayacak. Ayr\u0131ca \u00fc\u00e7 y\u0131ll\u0131k \u00fcr\u00fcn y\u00f6netim hizmeti de verecek.<\/p>\n<p>2016 y\u0131l\u0131n\u0131n 3. \u00e7eyrek d\u00f6neminde teslimat\u0131n\u0131n yap\u0131lmas\u0131 planlanan t\u00fcrbinlerin, 2016 y\u0131l\u0131n\u0131n 4.\u00e7eyre\u011finde devreye girmesi bekleniyor.<\/p>\n<p>Vestas`\u0131n bu y\u0131l\u0131n ba\u015f\u0131ndan bu yana ald\u0131\u011f\u0131 sipari\u015fler 3.357 MW oldu.<\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Vestas, ABD`nin Teksas Eyaleti`nde kurulacak r\u00fczgar \u00e7iftli\u011fi i\u00e7in EDF Renewable Energy \u015firketine 150 MW`l\u0131k t\u00fcrbin sa\u011flayacak. Danimarka merkezli r\u00fczgar t\u00fcrbinleri \u00fcreticisi Vestas bir [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40786,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[1198,23753,63,67,1009,2698,165,69,2511,16,23318,23754,5064,4734],"views":959,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40785"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40785"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40785\/revisions"}],"predecessor-version":[{"id":40787,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40785\/revisions\/40787"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40786"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40785"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40785"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}