{"id":40773,"date":"2015-06-28T19:45:04","date_gmt":"2015-06-28T16:45:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40773"},"modified":"2015-06-28T19:45:04","modified_gmt":"2015-06-28T16:45:04","slug":"amazon-80-mw-ges-kuruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/amazon-80-mw-ges-kuruyor\/","title":{"rendered":"(Turkish) Amazon 80 MW GES Kuruyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40773\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Apple ve Google&#8217;\u0131n ard\u0131ndan d\u00fcnyan\u0131n bilinen ilk\u00a0b\u00fcy\u00fck internet al\u0131\u015fveri\u015f sitesi Amazon da Amerika&#8217;n\u0131n Virginia Eyaleti&#8217;nde <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/amazon-80-mw-ges-kuruyor.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-40774\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/amazon-80-mw-ges-kuruyor-300x150.jpg\" alt=\"amazon-80-mw-ges-kuruyor\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/amazon-80-mw-ges-kuruyor-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/amazon-80-mw-ges-kuruyor-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/amazon-80-mw-ges-kuruyor-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/amazon-80-mw-ges-kuruyor.jpg 800w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>bulunan bilgi i\u015flem merkezine 80 MW kapasiteli bir g\u00fcne\u015f enerjisi santrali kuraca\u011f\u0131n\u0131 duyurdu.<\/strong><\/p>\n<p>Ge\u00e7ti\u011fimiz y\u0131l enerjisinin tamam\u0131n\u0131 yenilenebilir kaynaklardan elde edece\u011fini a\u00e7\u0131klayan \u015firket,\u00a02015 Nisan ay\u0131 itibari ile enerji ihtiyac\u0131n\u0131n\u00a0% 25&#8217;ini yenilenebilir kaynaklardan sa\u011flayabilir halde. 2016 sonu ii\u00e7in ise hedefleri % 40&#8242; ula\u015fmak.<\/p>\n<p>Virginia&#8217;da bulunan bilgi i\u015flem merkezine yap\u0131lacak 80 MW kapasiteli yat\u0131r\u0131m 15.000 bin evin enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamaya e\u015f de\u011fer bir b\u00fcy\u00fckl\u00fc\u011fe sahip.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.gizmodo.com.au\/2015\/06\/amazons-building-a-solar-farm-to-green-its-data-centres\/\" target=\"_blank\" rel=\"nofollow\">Gizmodo<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Apple ve Google&#8217;\u0131n ard\u0131ndan d\u00fcnyan\u0131n bilinen ilk\u00a0b\u00fcy\u00fck internet al\u0131\u015fveri\u015f sitesi Amazon da Amerika&#8217;n\u0131n Virginia Eyaleti&#8217;nde bulunan bilgi i\u015flem merkezine 80 MW kapasiteli bir [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40774,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[23747,63,67,1009,2698,165,2326,21886,227,13,2569,21768,1286,105],"views":999,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40773"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40773"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40773\/revisions"}],"predecessor-version":[{"id":40775,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40773\/revisions\/40775"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40774"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40773"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40773"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}