{"id":40701,"date":"2015-06-26T14:29:31","date_gmt":"2015-06-26T11:29:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40701"},"modified":"2015-06-26T14:29:31","modified_gmt":"2015-06-26T11:29:31","slug":"pakistan-1-gwlik-projenin-ilk-asamasini-tamamladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/pakistan-1-gwlik-projenin-ilk-asamasini-tamamladi\/","title":{"rendered":"(Turkish) Pakistan 1 GW\u2019l\u0131k Projenin \u0130lk A\u015famas\u0131n\u0131 Tamamlad\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40701\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Pakistan\u2019\u0131n Pencap eyaletinde geli\u015ftirilmesine ba\u015flanan ve ad\u0131n\u0131 \u00fclkenin kurucusu Muhammed Ali Cinnah\u2019\u0131n \u00fcnvan\u0131ndan alan 1 GW\u2019l\u0131k Kaydi Azam g\u00fcne\u015f elektri\u011fi park\u0131n\u0131n 100 MW\u2019l\u0131k ilk a\u015famas\u0131 tamamlanarak devreye girdi.<\/strong><\/p>\n<p>Projede kullan\u0131lan mod\u00fcller \u00c7inli \u00fcretici JA Solar taraf\u0131ndan kar\u015f\u0131lan\u0131rken, m\u00fchendislik, sat\u0131n alma ve in\u015fa hizmetleri ise bir ba\u015fka \u00c7inli \u015firket olan TBE<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/pakistan-1-gwlik-projenin-ilk-asamasini-tamamladi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-40702\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/pakistan-1-gwlik-projenin-ilk-asamasini-tamamladi-300x150.jpg\" alt=\"pakistan-1-gwlik-projenin-ilk-asamasini-tamamladi\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/pakistan-1-gwlik-projenin-ilk-asamasini-tamamladi-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/pakistan-1-gwlik-projenin-ilk-asamasini-tamamladi-500x250.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/pakistan-1-gwlik-projenin-ilk-asamasini-tamamladi-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/pakistan-1-gwlik-projenin-ilk-asamasini-tamamladi.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>A SunOasis taraf\u0131ndan sa\u011fland\u0131.<\/p>\n<p>Projenin 300 MW\u2019l\u0131k ikinci a\u015famas\u0131n\u0131n bu y\u0131l sonuna kadar, 600 MW\u2019l\u0131k \u00fc\u00e7\u00fcnc\u00fc a\u015famas\u0131n\u0131n ise gelecek y\u0131l\u0131n sonuna kadar devreye girmesi planlan\u0131yor.<\/p>\n<p>Elektrik \u00fcretim ve iletim kapasitesindeki yetersizlikler nedeni ile s\u00fcrekli elektrik kesintilerinin ya\u015fand\u0131\u011f\u0131 Pakistan\u2019da \u00fclke y\u00f6netimi bu sorunun \u00fcstesinden gelmek i\u00e7in g\u00fcne\u015f enerjisi yat\u0131r\u0131mlar\u0131n\u0131 art\u0131rmaya \u00e7al\u0131\u015f\u0131yor.<\/p>\n<p>Bu hedef do\u011frultusunda \u00f6zellikle \u00c7in y\u00f6netimi ile yak\u0131n ili\u015fkiler kuran Pakistan h\u00fck\u00fcmeti \u00c7inli firmalar\u0131n gelecek bir ka\u00e7 y\u0131l i\u00e7inde \u00fclkede 30 milyar dolar d\u00fczeyinde g\u00fcne\u015f elektri\u011fi yat\u0131r\u0131m\u0131 ger\u00e7ekle\u015ftirece\u011fini \u00f6ng\u00f6r\u00fcyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.guneselektrigi.com\/pakistan-1-gwlik-projenin-ilk-asamasini-tamamladi\/1296\" target=\"_blank\" rel=\"nofollow\">G\u00fcne\u015f\u00a0Elektri\u011fi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Pakistan\u2019\u0131n Pencap eyaletinde geli\u015ftirilmesine ba\u015flanan ve ad\u0131n\u0131 \u00fclkenin kurucusu Muhammed Ali Cinnah\u2019\u0131n \u00fcnvan\u0131ndan alan 1 GW\u2019l\u0131k Kaydi Azam g\u00fcne\u015f elektri\u011fi park\u0131n\u0131n 100 MW\u2019l\u0131k [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40702,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,165,2326,21886,227,13,2569,21768,1315],"views":683,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40701"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40701"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40701\/revisions"}],"predecessor-version":[{"id":40703,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40701\/revisions\/40703"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40702"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40701"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40701"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40701"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}