{"id":40695,"date":"2015-06-26T14:18:25","date_gmt":"2015-06-26T11:18:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40695"},"modified":"2015-06-26T14:18:25","modified_gmt":"2015-06-26T11:18:25","slug":"zarar-ediyoruz-ama-40-yeni-istasyon-acacagiz","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zarar-ediyoruz-ama-40-yeni-istasyon-acacagiz\/","title":{"rendered":"(Turkish) \u201cZarar Ediyoruz Ama 40 Yeni \u0130stasyon A\u00e7aca\u011f\u0131z&#8230;\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40695\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #363636;\"><strong>BP T\u00fcrkiye Akaryak\u0131t \u00dclke M\u00fcd\u00fcr\u00fc Martin Thomsen, Do\u011fu\u015f Otomotiv ile i\u015fbirli\u011fi projesinin tan\u0131t\u0131ld\u0131\u011f\u0131 toplant\u0131 sonras\u0131 Reuters\u2019a \u015fu a\u00e7\u0131klamalarda bulundu.<\/strong><\/p>\n<p style=\"color: #363636;\">Deval\u00fcasyon ve akaryak\u0131t fiy<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zarar-ediyoruz-ama-40-yeni-istasyon-acacagiz.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-40696\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zarar-ediyoruz-ama-40-yeni-istasyon-acacagiz.jpg\" alt=\"zarar-ediyoruz-ama-40-yeni-istasyon-acacagiz\" width=\"300\" height=\"193\" \/><\/a>atlar\u0131na m\u00fcdahale nedeniyle T\u00fcrkiye\u2019deki hedeflerinin gerisinde olduklar\u0131n\u0131 belirten Thomsen, \u201c\u015eu anda zarar yaz\u0131yoruz. Ancak T\u00fcrkiye pazar\u0131nda b\u00fcy\u00fcme stratejimizi koruyoruz, bu y\u0131l 2014\u2032e paralel 40 yeni istasyon yat\u0131r\u0131m\u0131 planl\u0131yoruz\u201d dedi.<\/p>\n<p style=\"color: #363636;\">Do\u011fu\u015f Otomotiv ile i\u015fbirli\u011fi \u00e7er\u00e7evesinde cirolar\u0131nda 7-8 yeni istasyon yat\u0131r\u0131m\u0131 kadar katk\u0131 beklediklerini aktaran Thomsen, \u00f6zelle\u015ftirme kapsam\u0131na al\u0131nan TPAO\u2019ya ait TP Petrol Da\u011f\u0131t\u0131m A\u015e ile ilgilenip ilgilenmedikleri sorusuna, \u201c\u015eu an yorum i\u00e7in \u00e7ok erken. Zaman\u0131 gelince bakabiliriz. Ama finansal ve operasyonel olarak uygun olmas\u0131 ve bizim stratejimizle \u00f6rt\u00fc\u015fmesi durumunda f\u0131rsatlar\u0131 de\u011ferlendirebiliriz\u201d cevab\u0131n\u0131 verdi.<\/p>\n<p style=\"color: #363636;\">Kaynak: D\u00fcnya<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. BP T\u00fcrkiye Akaryak\u0131t \u00dclke M\u00fcd\u00fcr\u00fc Martin Thomsen, Do\u011fu\u015f Otomotiv ile i\u015fbirli\u011fi projesinin tan\u0131t\u0131ld\u0131\u011f\u0131 toplant\u0131 sonras\u0131 Reuters\u2019a \u015fu a\u00e7\u0131klamalarda bulundu. Deval\u00fcasyon ve akaryak\u0131t [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40696,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,44],"tags":[2289,5405,853,810,23708,63,67,1009,2698,165,2034,4409,59,79],"views":911,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40695"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40695"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40695\/revisions"}],"predecessor-version":[{"id":40697,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40695\/revisions\/40697"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40696"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40695"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40695"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40695"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}