{"id":40577,"date":"2015-06-22T21:31:31","date_gmt":"2015-06-22T18:31:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40577"},"modified":"2015-06-22T21:31:31","modified_gmt":"2015-06-22T18:31:31","slug":"zorlu-kizildere-4-jes-icin-onlisans-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-kizildere-4-jes-icin-onlisans-aldi\/","title":{"rendered":"(Turkish) Zorlu, K\u0131z\u0131ldere 4 JES \u0130\u00e7in \u00d6nlisans Ald\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40577\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Zorlu Do\u011fal Elektrik \u00dcretimi A.\u015e., Ayd\u0131n`da kurmay\u0131 planlad\u0131\u011f\u0131 K\u0131z\u0131ldere 4 Jeotermal Santral Projesi i\u00e7in \u00f6nlisans ald\u0131.<\/strong><\/p>\n<p>Zorlu Enerji, Kamuyu Ayd\u0131nlatma Platformuna (KAP) g\u00f6nderdi\u011fi a\u00e7\u0131klamada, ba\u011fl\u0131 ortakl\u0131\u011f\u0131 Zorlu Do\u011fal Elektrik \u00dcretimi A\u015e`nin Ayd\u0131n ili Buhark<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zorlu-kizildere-4-jes-icin-onlisans-aldi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-40578\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zorlu-kizildere-4-jes-icin-onlisans-aldi-300x194.jpg\" alt=\"zorlu-kizildere-4-jes-icin-onlisans-aldi\" width=\"300\" height=\"194\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zorlu-kizildere-4-jes-icin-onlisans-aldi-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zorlu-kizildere-4-jes-icin-onlisans-aldi-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zorlu-kizildere-4-jes-icin-onlisans-aldi.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ent \u0130l\u00e7esi Karata\u015f mevkiinde kurmay\u0131 planlad\u0131\u011f\u0131 24,9 megavatl\u0131k (MW) kurulu g\u00fcce sahip olacak K\u0131z\u0131ldere 4 Jeotermal Santral Projesi i\u00e7in Enerji Piyasas\u0131 D\u00fczenleme Kurulundan (EPDK) \u00f6nlisans ald\u0131\u011f\u0131n\u0131 bildirdi.<\/p>\n<p>A\u00e7\u0131klamada, &#8220;24.06.2014 tarihli \u00f6zel durum a\u00e7\u0131klamam\u0131za istinaden, \u015firketimizin 0 hissedar\u0131 oldu\u011fu Zorlu Do\u011fal Elektrik \u00dcretimi A\u015e`nin Ayd\u0131n ili Buharkent \u0130l\u00e7esi Karata\u015f mevkiinde kurmay\u0131 planlad\u0131\u011f\u0131 24,9 megavatl\u0131k (MW) kurulu g\u00fcce sahip olacak K\u0131z\u0131ldere 4 Jeotermal Santral Projesi i\u00e7in Enerji Piyasas\u0131 D\u00fczenleme Kurulundan (EPDK) \u00f6nlisans al\u0131nm\u0131\u015ft\u0131r&#8221; denildi.<\/p>\n<p>T\u00fcrkiye`nin ilk jeotermal santrali olan 15 MW kapasiteli Denizli K\u0131z\u0131ldere santraline ek olarak, 80 MW kapasiteli K\u0131z\u0131ldere 2 santrali Eyl\u00fcl 2013`te a\u00e7\u0131lan Zorlu Enerjinin, 100 MW kapasiteli K\u0131z\u0131ldere 3 santrali i\u00e7in \u00f6n lisans ba\u015fvurusu 2014 y\u0131l\u0131n\u0131n aral\u0131k ay\u0131nda kabul edilmi\u015fti.<\/p>\n<p style=\"text-align: left;\">Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/zorlu-kizildere-4-jes-icin-onlisans-aldi_14188.html#.VYhT0vntmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Zorlu Do\u011fal Elektrik \u00dcretimi A.\u015e., Ayd\u0131n`da kurmay\u0131 planlad\u0131\u011f\u0131 K\u0131z\u0131ldere 4 Jeotermal Santral Projesi i\u00e7in \u00f6nlisans ald\u0131. Zorlu Enerji, Kamuyu Ayd\u0131nlatma Platformuna (KAP) g\u00f6nderdi\u011fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40578,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[7179,63,67,1009,2698,165,58,56,10686,6322,23627,19792,3228,23626],"views":1319,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40577"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40577"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40577\/revisions"}],"predecessor-version":[{"id":40579,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40577\/revisions\/40579"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40578"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40577"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40577"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}