{"id":4053,"date":"2012-12-04T09:55:59","date_gmt":"2012-12-04T06:55:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=4053"},"modified":"2012-12-04T10:06:25","modified_gmt":"2012-12-04T07:06:25","slug":"cekerek-hes-projesi-devreye-aliniyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cekerek-hes-projesi-devreye-aliniyor\/","title":{"rendered":"(Turkish) \u00c7ekerek HES Projesi Devreye Al\u0131n\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/4053\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-4054\" title=\"sureyyabey-cekerek-hes\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/12\/sureyyabey-cekerek-hes-300x163.jpg\" alt=\"\" width=\"300\" height=\"163\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/12\/sureyyabey-cekerek-hes-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/12\/sureyyabey-cekerek-hes-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/12\/sureyyabey-cekerek-hes.jpg 460w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Yozgat&#8217;taki proje kendini 5 y\u0131lda amorti edecek. DS\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan 525 milyon TL yat\u0131r\u0131m ile in\u015fa edilen \u00c7ekerek\u00a0 (S\u00fcreyyabey) Baraj\u0131 ve HES projesinin gelecek hafta Ba\u015fbakan Recep Tayyip\u00a0 Erdo\u011fan taraf\u0131ndan devreye al\u0131naca\u011f\u0131 a\u00e7\u0131kland\u0131.<\/p>\n<div id=\"content-text\">\n<p>DS\u0130&#8217;den yap\u0131lan a\u00e7\u0131klamada, Yozgat&#8217;\u0131n \u00c7ekerek il\u00e7esinin 6 kilometre\u00a0 g\u00fcneydo\u011fusunda, \u00c7ekerek Irma\u011f\u0131 \u00fczerinde 102,5 metre y\u00fckseklikte ve g\u00f6vdesi kil\u00a0 \u00e7ekirdekli kaya dolgu olarak in\u015fa edilen barajla 653 bin 230 dekar tar\u0131m\u00a0 arazisinin sulanaca\u011f\u0131 a\u00e7\u0131kland\u0131.<\/p>\n<p>Bununla birlikte yat\u0131r\u0131m sayesinde y\u0131lda 50 milyon kilowatt-saat elektrik\u00a0 \u00fcretimi ger\u00e7ekle\u015fecek iken projenin 5 y\u0131lda yat\u0131r\u0131m\u0131 amorti edece\u011fi\u00a0 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.yesilekonomi.com\/yenilenebilir-enerji\/cekerek-hes-projesi-devreye-aliniyor\" target=\"_blank\">Ye\u015fil Ekonomi<\/a><\/p>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Yozgat&#8217;taki proje kendini 5 y\u0131lda amorti edecek. DS\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan 525 milyon TL yat\u0131r\u0131m ile in\u015fa edilen \u00c7ekerek\u00a0 (S\u00fcreyyabey) Baraj\u0131 ve HES [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4054,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1195,35370,1196,1197],"views":1052,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/4053"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=4053"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/4053\/revisions"}],"predecessor-version":[{"id":4056,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/4053\/revisions\/4056"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/4054"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=4053"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=4053"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=4053"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}