{"id":40320,"date":"2015-06-15T13:19:13","date_gmt":"2015-06-15T10:19:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40320"},"modified":"2015-06-15T13:19:13","modified_gmt":"2015-06-15T10:19:13","slug":"almanyada-2-gunes-enerjisi-santrali-ges-ihalesine-start","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/almanyada-2-gunes-enerjisi-santrali-ges-ihalesine-start\/","title":{"rendered":"(Turkish) Almanya`da 2. G\u00fcne\u015f Enerjisi Santrali (GES) \u0130halesine Start!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40320\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Almanya`da, ikinci g\u00fcne\u015f enerjisi santrali (GES) ihalelerine start verildi, ba\u015fvurular ba\u015flad\u0131. Almanya Federal \u015eebeke Ajans\u0131, \u00fclkedeki ikinci GES Santrali ihalesini duyurdu. \u0130haleye teklif verme s\u00fcresi ge\u00e7ti\u011fimiz hafta i\u00e7inde ba\u015flad\u0131. \u0130stekliler tekliflerini, 1 A\u011fustos 2015 tarihine kadar kat\u0131lmak verebilecek.<\/strong><\/p>\n<p>\u0130kinci ihale paketiyle istekli yat\u0131r\u0131mc\u0131lar, toplam 150 MW kurulu g\u00fc\u00e7 i\u00e7in yar\u0131\u015facak. \u0130hale tekliflerinde en \u00fcst teklif fiyat\u0131 kWh ba\u015f\u0131na 11,18 EuroCent olarak belirlendi.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/almanyada-2-gunes-enerjisi-santrali-ges-ihalesine-start.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-40321 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/almanyada-2-gunes-enerjisi-santrali-ges-ihalesine-start-300x174.jpg\" alt=\"almanyada-2-gunes-enerjisi-santrali-ges-ihalesine-start\" width=\"300\" height=\"174\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/almanyada-2-gunes-enerjisi-santrali-ges-ihalesine-start-300x174.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/almanyada-2-gunes-enerjisi-santrali-ges-ihalesine-start-500x290.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/almanyada-2-gunes-enerjisi-santrali-ges-ihalesine-start-80x46.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/almanyada-2-gunes-enerjisi-santrali-ges-ihalesine-start.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Birinci ihaleden farkl\u0131 olarak bu kez, tek tip fiyatland\u0131rma modeli (uniform-pricing-model) uygulanacak. Birinci ihalede pay-as-bid modeli kullan\u0131lm\u0131\u015ft\u0131. Yani ihaleyi kazanan yat\u0131r\u0131mc\u0131ya kendi verdi\u011fi fiyat teklif \u00fczerinden elektrik paras\u0131 \u00f6denmesi gerekiyordu.<br \/>\nYeni ihaledeki modelde ise tek bir birim fiyat\u0131, b\u00fct\u00fcn kazanan projelerde uygulanacak. Birim fiyat\u0131 150 MW s\u0131n\u0131r\u0131na ula\u015f\u0131lana kadar verilen en y\u00fcksek fiyat olarak belirlenecek.<\/p>\n<p>PV Magazine`de yer alan habere g\u00f6re Federal \u015eebeke Ajans\u0131 Ba\u015fkan\u0131 Jochen Homan &#8220;\u0130lk ihalede oldu\u011fu gibi, ikinci ihalenin de ba\u015far\u0131l\u0131 olaca\u011f\u0131ndan \u00fcmitliyim&#8221; dedi.<\/p>\n<p>Dikkat \u00e7eken noktalardan biri de ilk ihalede kazanamayan GES Projeleri`nin bu ihaleye de kat\u0131labilmeleri. \u0130lk ihalede 37 dosya hatal\u0131 verilmi\u015fti ve ihaleye girme hakk\u0131 kazanamam\u0131\u015ft\u0131. Bu y\u00fcksek say\u0131dan dolay\u0131 Ajans, yap\u0131lan hatalarla ilgili bir ihale k\u0131lavuzu yay\u0131nlad\u0131. Bu k\u0131lavuz yat\u0131r\u0131mc\u0131lar\u0131n do\u011fru ihale dosyas\u0131 haz\u0131rlamas\u0131nda yard\u0131mc\u0131 olmas\u0131n\u0131 sa\u011flamaya d\u00f6n\u00fck.<\/p>\n<p>16 Nisan tarihinde biten ilk ihalede 25 GES Projesi, hayata ge\u00e7irilmeye hak kazanm\u0131\u015ft\u0131. \u0130haleyi kazanan projelerin ortalama sat\u0131n alma fiyat\u0131 9,17 EuroCent\/kwh olmu\u015ftu. \u0130halede olu\u015fan en d\u00fc\u015f\u00fck fiyat ise 8.48, en y\u00fcksek fiyat ise 9.43 EuroCent\/kwh olmu\u015ftu.<\/p>\n<p>B\u00fct\u00fcn kazanan projelerin toplam kurulu g\u00fcc\u00fc 157 MW olmu\u015ftu. 25 ihalelenin 11 tanesini Sybac Yat\u0131r\u0131m Gurubu kazanm\u0131\u015ft\u0131. Trianel ve IBC Solar da birden fazla GES ihale si kazanan \u015firketler aras\u0131ndayd\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/almanyada-2-ges-ihalesine-start_14060.html#.VX6q6vntmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Almanya`da, ikinci g\u00fcne\u015f enerjisi santrali (GES) ihalelerine start verildi, ba\u015fvurular ba\u015flad\u0131. Almanya Federal \u015eebeke Ajans\u0131, \u00fclkedeki ikinci GES Santrali ihalesini duyurdu. \u0130haleye teklif [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40321,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[929,63,67,1009,2698,165,2326,227,13,2569,2054,23484,1405],"views":1009,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40320"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40320"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40320\/revisions"}],"predecessor-version":[{"id":40322,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40320\/revisions\/40322"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40321"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}