{"id":40285,"date":"2015-06-14T18:36:34","date_gmt":"2015-06-14T15:36:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40285"},"modified":"2015-06-14T18:36:34","modified_gmt":"2015-06-14T15:36:34","slug":"zorlu-alasehir-ii-jes-ced-surecinde","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-alasehir-ii-jes-ced-surecinde\/","title":{"rendered":"(Turkish) Zorlu Ala\u015fehir-II JES \u00c7ED S\u00fcrecinde&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40285\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Zorlu Jeotermal Enerji`nin Manisa`da yapmay\u0131 planlad\u0131\u011f\u0131 24.5 MW`l\u0131k Ala\u015fehir-II JES i\u00e7in \u00c7ED S\u00fcreci ba\u015flad\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zorlu-alasehir-ii-jes-ced-surecinde.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-40286\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zorlu-alasehir-ii-jes-ced-surecinde-300x194.jpg\" alt=\"zorlu-alasehir-ii-jes-ced-surecinde\" width=\"300\" height=\"194\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zorlu-alasehir-ii-jes-ced-surecinde-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zorlu-alasehir-ii-jes-ced-surecinde-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/zorlu-alasehir-ii-jes-ced-surecinde.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Zorlu Jeotermal Enerji Elektrik \u00dcretim A.\u015e. taraf\u0131ndan Manisa ili, Ala\u015fehir il\u00e7esi, Erenk\u00f6y-Osmaniye-\u00c7e\u015fneli mevkii 193 numaral\u0131 sahada yap\u0131lmas\u0131 planlanan 15 Adet Jeotermal Sondaj\u0131n da dahil oldu\u011fu 24,9 MWe g\u00fcc\u00fcnde Ala\u015fehir-II Jeotermal Enerji Santral\u0131 (JES) i\u00e7in \u00c7ED S\u00fcreci ba\u015flad\u0131.<\/p>\n<p>Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) Ala\u015fehir-II JES Projesi i\u00e7in 21.08.2014 tarih ve 5176-9 say\u0131l\u0131 karar\u0131 ile \u00f6n lisans belgesi verdi.<\/p>\n<p>Jeotermal Santral ve 15 adet sondaj\u0131 kapsayan projenin yat\u0131r\u0131m bedeli yakla\u015f\u0131k 70 Milyon TL ve bu miktar\u0131n finansman yat\u0131r\u0131mc\u0131 firman\u0131n \u00f6z kaynaklar\u0131ndan kar\u015f\u0131lanmas\u0131 planlan\u0131yor. Projenin \u00f6mr\u00fc ise 49 y\u0131l.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/zorlu-alasehir-ii-jes-ced-surecinde_14003.html#.VX2j7_ntmko\" target=\"_blank\" rel=\"nofollow&quot;\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Zorlu Jeotermal Enerji`nin Manisa`da yapmay\u0131 planlad\u0131\u011f\u0131 24.5 MW`l\u0131k Ala\u015fehir-II JES i\u00e7in \u00c7ED S\u00fcreci ba\u015flad\u0131. \u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40286,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[23466,2878,5927,63,67,1009,165,58,56,4136,6322,2191,23465],"views":1128,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40285"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40285"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40285\/revisions"}],"predecessor-version":[{"id":40287,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40285\/revisions\/40287"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40286"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40285"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40285"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}