{"id":40270,"date":"2015-06-14T18:06:29","date_gmt":"2015-06-14T15:06:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=40270"},"modified":"2015-06-14T18:06:29","modified_gmt":"2015-06-14T15:06:29","slug":"hisar-enerjiden-aydina-5-mwlik-ges","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hisar-enerjiden-aydina-5-mwlik-ges\/","title":{"rendered":"(Turkish) Hisar Enerji`den Ayd\u0131n`a 5 MW`l\u0131k GES!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/40270\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Hisar Enerji, Ayd\u0131n`da 5 MW kurulu g\u00fcc\u00fcnde G\u00fcne\u015f Enerjisi Santrali kuracak.<\/strong><\/p>\n<p>Hisar G\u00fcne\u015f Enerji \u00dcretim A.\u015e. taraf\u0131ndan Ayd\u0131n \u0130li, Buharkent \u0130l\u00e7esi, Savc\u0131ll\u0131 Mahallesi, Delia\u011fada\u011f\u0131 Mevkii, <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/hisar-enerjiden-aydina-5-mwlik-ges.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-40271 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/hisar-enerjiden-aydina-5-mwlik-ges-300x199.jpg\" alt=\"hisar-enerjiden-aydina-5-mwlik-ges\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/hisar-enerjiden-aydina-5-mwlik-ges-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/hisar-enerjiden-aydina-5-mwlik-ges-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/hisar-enerjiden-aydina-5-mwlik-ges-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2015\/06\/hisar-enerjiden-aydina-5-mwlik-ges.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>M21B01C Pafta, 937, 938 ve 939 Parsel numaras\u0131nda birbirinden ba\u011f\u0131ms\u0131z ve her biri 0,99 MW g\u00fcc\u00fcnde 5 G\u00fcne\u015f Enerji Santrali kurulmas\u0131 planlan\u0131yor.<\/p>\n<p>Toplam kurulu g\u00fcc\u00fc 4,95 MWe olmas\u0131 planlanan G\u00fcne\u015f Enerji Santrali toplam 53029,302 m2\u2019lik alana kurulacak. Kurulmas\u0131 planlanan 5 adet lisanss\u0131z elektrik \u00fcretim tesisinin her birinde 6 545 adet ince film veya organik yap\u0131l\u0131 fotovoltaik panel ve her biri 30 kW olan 33 adet evirici (invert\u00f6r) kullan\u0131lacak<\/p>\n<p>Proje bedeli 4 500 000 TL olarak belirlenen G\u00fcne\u015f enerjisi tesisinde \u00fcretilecek elektrik enerjisi, enerji iletim hatt\u0131yla Sarayk\u00f6y TM enerji iletim hatt\u0131na ba\u011flanacak.<\/p>\n<p><strong>PROJEYE \u00c7ED GEREKL\u0130 G\u00d6R\u00dcLMED\u0130<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`n\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada, proje ile ilgili olarak Bakanl\u0131\u011fa sunulan dosyan\u0131n incelenip de\u011ferlendirilerek, Ayd\u0131n Valili\u011fi taraf\u0131ndan `\u00c7evresel Etki De\u011ferlendirmesi Gerekli De\u011fildir` karar\u0131 verildi\u011fi belirtildi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/hisar-enerjiden-aydina-5-mwlik-ges_14047.html#.VX2cNPntmko\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Hisar Enerji, Ayd\u0131n`da 5 MW kurulu g\u00fcc\u00fcnde G\u00fcne\u015f Enerjisi Santrali kuracak. Hisar G\u00fcne\u015f Enerji \u00dcretim A.\u015e. taraf\u0131ndan Ayd\u0131n \u0130li, Buharkent \u0130l\u00e7esi, Savc\u0131ll\u0131 Mahallesi, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40271,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[7179,22971,63,67,1009,2698,165,2326,21886,227,13,2569,21768,23462],"views":1117,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40270"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=40270"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40270\/revisions"}],"predecessor-version":[{"id":40272,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/40270\/revisions\/40272"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/40271"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=40270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=40270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=40270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}